Madras Chamber of Commerce & Industry & India Energy Forum Optimizing Transmission Sunil Varma Marri Head-Energy Practice Chennai 5 th September 2014.

Slides:



Advertisements
Similar presentations
BI Marketing Analyst input into report marketing Report TitleElectricity in South Africa Report Subtitle Country profile of power sector, market trends.
Advertisements

The future Role of VPPs in Europe Pan European Balancing Market: EU-FP7-Project eBadge Workshop on DSM Potentials, Implementations and Experiences 20 th.
Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
Hedge fund flows on pace to nearly double 2012
Key Highlights Accrual based product with focus on interest income through buy & hold strategy Investment in good quality rated corporate bonds Rigorous.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Jim Larranaga Men’s Basketball Head Coach, AP National Coach of the Year University of Miami Our Formula for Success: The Miami Way.
The following slides are approved for external use but may not be altered in any way. For additional information, contact Tom Agoston at Tom Agoston/Somers/IBM.
Madras Chamber of Commerce & Industry and India Energy Forum Session on Rationalisation of Electricity Tariffs Anand Madhavan Head – Energy & Urban Infrastructure.
Innovations in Structured Products October 25, 2010 An Innovator’s Dilemma?
Hydropower Development: Experience of Nepal
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
BUSINESS OPPORUNITIES IN SAUDI POWER SECTOR US-Saudi BUSINESS OPPORTUNITIES FORUM CHICAGO April 28-29, 2010 Ali Albarrak President &C E O Saudi Electricity.
Education’s Value Proposition MARK ZANDI, CHIEF ECONOMIST FROM MOODY’S ECONOMY.COM.
STRICTLY CONFIDENTIAL Positioning for Growth Tasmanian Strata Industry Tim MacKenzie Associate Director Friday 9 th August.
M ICHIGAN P UBLIC S ERVICE C OMMISSION Transformation of the Electric Power Industry: Value of Regulatory Impact Assessments Greg R. White Commissioner.
ENERGY AND POWER  Bangladesh Development Forum 2010  DHAKA Ministry of Power, Energy & Mineral Resources Government of the People’s Republic of Bangladesh.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Scaling Up Energy Efficiency in India: Opportunities in the Electricity Sector Dr. Jayant Sathaye, Dr. Amol Phadke and Ranjit Bharvirkar Energy Analysis.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 24 – 25, 2014 Gas Well Deliquification Breakout Session Managing Large Number.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Turkish Power System Overview March 2012
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
3 rd Annual Waste Heat to Power Workshop, 2007 Thomas R. Casten Chairman, Recycled Energy Development, LLC Waste Heat to Power September 25, 2007.
Nonprofitfinancefund.org ©2009 Nonprofit Finance Fund Nonprofit Finance Fund March 27, 2009 For more information, please contact Joyce F Jonat at
SELECTED FINANCIAL MANAGEMENT THEMESFOR SERVICE PROVIDERS Presented by: Onyango Obiero to KMA Annual Conference on April
Kuwait Financial Centre ‘Markaz’ Sukuk Presentation - Update June 2009
Sanjay Garg General Manager PGCIL/ Ministry of Power
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
Demand-Side Management Models & Practices in California Innovating for Sustainable Results: Integrated Approaches for Energy, Climate, and the Environment.
Page 1J. Hourtoule, Electricity contract: scope and forecasted consumption, 16/07/2015 © ITER Organization Electricity Supply Contract: For the ITER Site.
National Governors’ Association April 5, 2001 James Mahoney PG&E National Energy Group and any other company referenced herein which uses the PG&E name.
BI Marketing Analyst input into report marketing Report TitleElectricity in California Report Subtitle State profile of power sector, market trends and.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
Accelerate the Construction of the UHV Power Grid and Promote the Sustainable Development of Chinese Power Industry Liu Zhenya State Grid Corporation of.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
May 18 – 22, Gas-Lift Workshop1 Presentation Title Presenter(s) name(s) and job title(s), if needed Company identification(s) and logo(s), if.
Overall National Grid Development: Constraints & Options
Optimizing Power Availability -- Action Plan for Next Decade Challenges of Distribution -- Investment and Reforms 1.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Power to the Coast Project Presented by: Su Wei Tan Industrial Research Ltd.
2015 NARUC Winter Meeting Nick Wagner – Iowa Utilities Board 1.
Electricity Power Market: Competitive and Non-competitive Markets Ito Diejomaoh.
ERRA 4th Annual Conference May 19, Budapest, Hungary. Latvia Country Update UPDATE ON REGULATION Ainars Čunčulis Head of Energy Department Public.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
2 nd Annual Appalachian Basin Gas Well Deliquification Seminar Hilton Garden Inn, Pittsburg, PA June , 2011 Presentation Title Presenter(s) name(s)
To us there are no foreign markets. ™ Understanding Your Employee Stock Option Plan June 2014 To us there are no foreign markets. ™
Community Solar Dan McIlroy Clean Energy Collective.
Damitha Kumarasinghe Director General
OGK-2 Group 9M 2017 IFRS Results
Basin Electric SPP Market Update
Presentation Title Sector First Last, Senior Analyst
Kurt Adams EVP&CDO Restructuring Roundtable
OGK-2 Group 2018FY IFRS Results
TGC-1 9М 2018 IFRS Results 9 November, 2018.
OJSC «OGK-2» 3M 2013 IFRS Results May 27, 2013.
OGK-2 Group 9 months 2018 IFRS Results
OGK-2 Group 6 months 2018 IFRS Results
OGK-2 Group 3 months 2018 IFRS Results
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Business Planning Budgeting
Presentation transcript:

Madras Chamber of Commerce & Industry & India Energy Forum Optimizing Transmission Sunil Varma Marri Head-Energy Practice Chennai 5 th September 2014

© IMaCS 2014 Printed 9-Jun-15 Page 2 Tamil Nadu has faced severe transmission constraints in the recent times 1.Inter-regional  Constraints between SR and NEW-NE grids  TN could not import power from Chhattisgarh 2.Intra-regional  Constraints within the southern region between two areas S1 and S2  Hindered opportunities to procure power from S1 area 3.Intra-state  Transmission constraints in evacuating wind power Consequences:  Resulted in procurement of expensive power (short term/liquid fuel)  Loss of wind energy estimated by industry associations as 20%-30% of energy in the peak generation season worth more than Rs 1000 Cr annually

© IMaCS 2014 Printed 9-Jun-15 Page 3 Reasons for the transmission constraints..…. 1.Insufficient attention to transmission sector by the stakeholders Focus on generation and distribution sectors 2.Weaknesses in transmission planning philosophy Need for integrated planning Need for redundant capacity 3.Not conducting regular transmission planning studies Many utilities in India focus on evacuation schemes and specific transmission schemes but not state level planning 4.Delay in project execution 5.Financial constraints

© IMaCS 2014 Printed 9-Jun-15 Page 4 Transmission cost is about 10% of ACOS but is very critical to the power sector Particulars POWERGRID555 TANTRANSCO2847 Total - Transmission cost3402 Sales (MU)51,949 Transmission cost (Rs/kWh) 0.65 ACS TANTRANSCO was allocated disproportionately high quantum of loans at the time of unbundling of TNEB 2.Need to ensure that TANTRANSCO is well funded to be able to take up addition of transmission capacity 3.Need to ensure adequate investments in the transmission sector

© IMaCS 2014 Printed 9-Jun-15 Page 5 TN could have saved more than Rs 1/kWh in the cost of short term power by procuring from NEW-NE grid 1.Per unit cost of SR to NEW-NE synchronous interconnection (Raipur – Sholapur 765 kV) would be less than ten paisa per kWh 2.This interconnection could have saved costly significant cost in terms of power procurement for the utilities in Southern Region

© IMaCS 2014 Printed 9-Jun-15 Page 6 Learning from the Southern Region experience -1/2 1.Ten years back, it was thought that SR would be surplus or self sufficient in power capacity 2.Utilities in Southern Region were not enthusiastic about creating additional interregional capacity 3.Several projects like the 4000 MW Krishnapatnam UMPP did not materialize 4.Nearly 3 GW of gas capacity was stranded because of unavailability of gas 5.Now, there is a universal demand for interregional capacity

© IMaCS 2014 Printed 9-Jun-15 Page 7 Learning from the Southern Region experience -2/2 1.The realization of the need for interregional capacity is only a reaction to the demand-supply situation 2.This experience highlights the deficiencies in the planning philosophy 3.Need to realize the need for redundancy in transmission capacity 4.Need to plan for different load and generation scenarios 5.Benefits in cost saving in unexpected scenarios would almost entirely cover the cost of transmission redundancy

© IMaCS 2014 Printed 9-Jun-15 Page 8 How redundancy in transmission can help ? Intrastate transmission line: It is estimated that about 20%-30% of installed wind capacity remains unutilized due to unavailability of evacuation lines in the wind season Need for adequate transmission corridors Peaking plants/hybrid generation can not only supplement seasonality of wind it will also help in utilising under utilized transmission capacity in non peak seasons State has 858 MW of liquid fuel based generation capacity that can be used for peaking Interregional and interstate transmission lines: Redundant capacity in interregional and interstate transmission line is vital to ensure unhindered import of power from power surplus states PlantFuelCapacity (MW) GMR POWERDIESEL196 SAMALPATTIDIESEL106 PILLAIPERUMALNAPTHA331 MADURAI POWER LTDDIESEL106 BASIN BRIDGENAPTHA120

© IMaCS 2014 Printed 9-Jun-15 Page 9 Thank You

© IMaCS 2014 Printed 9-Jun-15 Page 10 Disclaimer All information contained in this document has been obtained by IMaCS from public sources and believed to be accurate and reliable. Although reasonable care has been taken to ensure that the information herein is true, such information is provided ‘as is’ without any warranty of any kind, and IMaCS in particular, makes no representation or warranty, express or implied, as to the accuracy, timeliness or completeness of any such information. All information contained herein must be construed solely as statements of opinion, and IMaCS shall not be liable for any losses incurred by users from any use of this document or its contents in any manner. Opinions expressed in this document are not the opinions of our holding company, ICRA Limited (ICRA), and should not be construed as any indication of credit rating or grading of ICRA for any instruments that have been issued or are to be issued by any entity. For any clarifications on this document, please contact: Sunil Varma Marri Head – Energy Practice