Mission Directorate Exploration Systems MSFC CD Chief S&MA Officer MSFC SMA DART Project Office (J. Snoddy) DART Contract (CPIF) 17 Mission Directorate.

Slides:



Advertisements
Similar presentations
G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
Advertisements

NASA Commercial Crew Program COMSTAC May 2011 Page 1 National Aeronautics and Space Administration COMMERCIAL CREW PROGRAM COMSTAC May 2011 E. Mango Commercial.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Innovation You Can Count On™ 1 Payload Integration Wendi Otto Systems Engineer, Pegasus and Taurus Launch Vehicles October 4, 2007 All Information Approved.
Define & Compare Flowcharts of Each Method Tom Delong.
Aerodyne Industries, LLC Company Overview 2013.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
National Aeronautics and Space Administration 1 GRC All-Hands Meeting 1 May 2006.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
The program work breakdown structure (WBS) establishes the essential
The Hawaii Space Flight Lab and the LEONIDAS Project
I) Bob Ettinger Flight Test Manager Northrop Grumman Aerospace Systems El Segundo, CA An Approach to Flight Readiness and Executive Readiness Reviews The.
CONSTELLATION National Aeronautics and Space Administration Ares Project Overview – Quality in Design Chris Cianciola Kenneth Crane.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
Federal Aviation Administration 1 COE CST Overview August 16, 2011 Introduction to the FAA Center of Excellence for Commercial Space Transportation August.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Expendable Launch Vehicle Payload Safety Program Cal Staubus.
Kennedy Space Center Florida Kennedy Space Center Florida “Change is the law of life, and those who look only to the past or the present are certain to.
Kennedy Space Center Spaceport Engineering and Technology.
NASA TECHNICAL STANDARDS PROGRAM NASA TECHNICAL STANDARDS PROGRAM 1 Dryden Flight Research Center Presentation to NASA Technical.
SMALL BUSINESS SHOWCASE Syneren Technologies Corp. Small Business Size: 8(a), SDB, Woman owned small business Niche Areas: R&D, Hardware, Systems Engineering.
National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY 1 NASA TECHNICAL STANDARDS WORKING GROUP.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Surveillance Planning Team Initial Team Meeting January 9-10 NASA Headquarters Team Introduction Revision A Tom Whitmeyer - OSMA Jeff Cullen - Procurement.
Breakout Group 2: Software Quality Assurance Objectives and Goals 8/18/10 1.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety The NASA Safety.
MaST – Modeling and Simulation Teams MBE and NASA Michael Conroy, Kennedy 10:20 – 10:50 am Model Based Enterprise Supplier Education and Training Summit.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Constellation Space Transportation Planning Office July 30, 2009.
Federal Aviation Administration 1 COE CST Overview May 11, 2011 Introduction to the FAA Center of Excellence for Commercial Space Transportation May 11,
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Federal Aviation Administration 1 COE CST Overview Presentation Federal Aviation Administration Introduction to the FAA Center of Excellence for Commercial.
SPACE SHUTTLE PROGRAM Space Shuttle Business Office NASA Johnson Space Center, Houston, Texas Presenter Date Page 1 Space Shuttle Program Flight and Ground.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.
(1) NASA Expendable Launch Vehicle Payload Safety Program Briefing to 30 th SW April 13, 2010 Cal Staubus ELV Payload Safety Manager.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
J. Marr - 1 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet.
Deploying JWST Bob Giampaoli JWST Chief Systems Engineer Northrop Grumman.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
1 JAMSS - Japan Manned Space Systems Corporation Safety and Product Assurance Department Software IV&V team Haruka Nakao ISERN Head.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
Safety and Mission Assurance Plan AMS-02 R EBASELINING O UTBRIEF July 15, 2004 NT/David Kaplan
Safety and Mission Assurance Lockheed Martin Space Operations (LMSO) Science, Engineering, Analysis, and Test Operation Safety and Mission Assurance Activity.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
Chapter 6 Requirements for a Maintenance Program.
Millennium Engineering and Integration Company Millennium Engineering and Integration Company Millennium Engineering and Integration Company Corporate.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Millennium Engineering and Integration Company A NEW DOCUMENTATION PROCESS TO STREAMLINE RANGE SAFETY PROCEDURES 0 O. “Rusty” Powell, Allan Smith, Jeff.
Engineering and Science Directorate Organization Structure June 2016.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
I&T&C Organization Chart
SE and SSE Trade-Off Analyses
TEMPO’s Commercially Hosted Payload Concept
GLAST Large Area Telescope:
Systems Engineering Management
GLAST Large Area Telescope:
Division Chief, Spaceport Management & Integration
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

Mission Directorate Exploration Systems MSFC CD Chief S&MA Officer MSFC SMA DART Project Office (J. Snoddy) DART Contract (CPIF) 17 Mission Directorate Space Operations KSC LSPO KSC SMA KSC CD SELVES Contract (FFP) Orbital Sciences Corp. LSG-Pegasus L10-11VAFB INT & OPS Vehicle VAFB - Range Safety - Ground Safety - Range LRR Pegasus Orbital Sciences Corp. LSG-DART S/W IV&V (P. Medley) ARPO Explorers Program Office KSC LS SMA 1 SMA (T. Arrigo) KSC LS SMA Quality Mgr (K. Monette) Safety Mgr (H. Schultz) FAA -- L1011 Airworthiness - - Public Safety DART SMA Mgr (M. Kennedy) DART Mission Assurance Process Map DART KSC LSP Mission Int. (Bellinger) Res. Office (Westoff) DART SMA Qual Eng (Pierce) OSC LSG Qual,Safety&Rel Assurance OSC TSD Quality Assurance MSFC SMA DART S/W Assurance (Mitchell) MSFC SMA Test Engr (Kalia) AVGS MSFC DART SMA Qual Insp (Blair) MSFC DART SMA Qual Assur (Rains) Matrix-ed relationship Direct report relationship Information flow Independent MA activity In-line MA activity SFIA (D. Elliott) LS SMA MAM (J. Roddy) 2 MSFC SMA DART S/W Assurance (Mitchell) OSC S/W Assur LSP Eng Teams (J. Wood, B. Henry) 9

RefMission Phase *** DART Mission Assurance Activities LocationPoint of ContactOrganization 11,2,5- 10 KSC SMA/Launch Services Division SMA (KSC LS SMA) Mission Assurance Mgr. : Pegasus Flt. Readiness assessment and SMA support to KSC Launch Services Program (LSP) (L3) KSCJordan RoddyKSC LS SMA 22KSC SMA Space Flight Independent Assessment (SFIA) Focused IA to KSC LSP (L3)KSCDawn ElliottKSC LS SMA 32,5-10LSP Vehicle Engineering Specialty Teams: Chief Engr and Vehicle Systems Lead. Mission Analysis, ERBs, TIMs, Design Reviews, Readiness Reviews, Project Decision Meetings, Mission-Unique Design Validation and Verification to Orbital Sciences Corp. (OSC) Launch Services Group (LSG) – Pegasus (L4-5) KSCJames Wood Bob Henry KSC LSP 43,4,5DART SMA Manager to OSC LSG-DART: Reliability prediction/FEMA, Safety Training (L5); Hazard analyses, Monitoring of mishap reporting, GIDEP alerts, Review of discrepancy reports, Limited Life Item Status, Mission Risks Review, Waivers/Deviations Review (L3) DullesMarcie KennedyMSFC SMA 52-7Software IV&V to DART operational elements (L3)GSFCPeter MedleyNASA HQ 69FAA oversight of L10-11 (Airworthiness and Public Safety)MoaveFAA 75-10KSC LS SMA Quality Management to Pegasus Integration & Test (L3)VAFBKevin MonetteKSC LS SMA 75-10KSC LS SMA Safety Management to Pegasus Integration & Test (L3)VAFBHeidi SchultzKSC LS SMA 82,5-10KSC LSP Mission Integration Engineering (Spacecraft integration to LV). Approval of integration reqmts. (L4-5)DullesFrank BellingerKSC LS SMA 92,5-10KSC LSP Resident Office Engineering support to VAFB Payload Integration and Launch Operations (L4)ChandlerWendy WestoffKSC LSP 102,5-10KSC LS SMA support to VAFB Payload Integration and Launch Operations (L4)KSCTony ArrigoKSC LS SMA OSC LSG Quality, Safety & Reliability Assurance to Vehicle Hardware Development and Test (direct in-line contractor participation) (L5) DullesOSC LSG 123,4Systems Test Engineering and Reliability Consultation to Vehicle Hardware Development and Test (L3)DullesPrince KaliaMSFC SMA 133,4Systems Test Engineering and Reliability Consultation to AVGS Hardware Development and Test (L3)DullesPrince KaliaMSFC SMA 141-7OSC Technical Services Division (TSD) Quality Assurance to AVGS Hardware Development and Test (direct in-line contractor participation) (L5) DullesOSC TSD 152-7OSC S/W Quality Assurance to Autonomous Rendezvous & Proximity Operations (ARPO) S/W Development (L5)DullesOSC 162-7Software Assurance to DART on-board computer software development (L3) MSFCGeorge MitchellMSFC DART SMA 173,4Quality Engineering surveillance of Vehicle Hardware Development, Assembly, and Test (L5)DullesJim PierceMSFC SMA 183,4Quality Engineering surveillance of AVGS Hardware Development and Test, and vehicle systems integration test (L5)DullesJim PierceMSFC SMA 191,2,3Quality Assurance SMA surveillance to AVGS Hardware Development and Test (L5)DullesRainsMSFC DART SMA 201Quality Assurance (Receiving & Inspection) to AVGS Hardware Development (L5)MSFCBlairMSFC DART SMA 212-7Software Assurance to AVGS Software Development (L5) MSFCGeorge MitchellMSFC DART SMA *** Mission Phases: 1. Procurement, 2. Design (HW & SW), 3. Payload Manufacture, 4. Payload Systems test, 5. S/C integration to LV, 6. LV integration, 7. System test and Simulated flight, 8. Pre-launch Ops, 9. Launch ops, 10. Post-launch ops.