Download presentation
Presentation is loading. Please wait.
Published byBrett Bryan Modified over 8 years ago
1
1 JAMSS - Japan Manned Space Systems Corporation Safety and Product Assurance Department Software IV&V team Haruka Nakao ISERN 2005 @Noosa Head
2
2 IV&V Team Background JAMSS is an engineering support company of JAXA and supports International Space Station (ISS) Japanese module development. IV&V team has been involved in software independent Verification and Validation (IV&V) of safety mission critical system since 1998. We had done IV&V for 10 kinds of project, 15 kinds of system (Onboard S/W of ISS module, Satellite, Space vehicle, ground S/W).
3
ISERN 2005 @Noosa Head 3 Current work IV&V for 3 space projects. Developing new techniques and validating them. Validating existent techniques Research of strategic IV&V assessment with University of Hawaii (Prof. Dan Port) Strategic IV&V planning model Note: “ Strategic ” means activities contribute to achieving an overall expected outcome rather than addressing a particular issue or problem
4
ISERN 2005 @Noosa Head 4 Future work IV&V for space projects based on Strategic IV&V planning model and validate them. Include IV&V cost model, IV&V standardization, benchmark test using common model, IV&V framework, Assign new IV&V techniques for never tried area (operational requirement, reuse, COTS) Investigation of accidents and malfunctions and measure value of IV&V attributes and techniques by systemization of malfunctions Enhancement of software IV&V for other domains such as Automobile, Nuclear, airplane, medical, defense, etc …
5
ISERN 2005 @Noosa Head 5 New technologies that are beneficial to software IV&V Individual IV&V techniques (Testing, modeling,etc … ) Value based technique Research results that are produced by other industry domains in order to compare to our result produced by space systems. Research opportunities for IV&V technologies Expected benefits from ISERN
6
ISERN 2005 @Noosa Head 6 Contribution to ISERN Clarify and identify issues on safety critical system development Share data behind issues that characterize the solutions for each issues Use of research results and report demonstrated status and validated results
7
ISERN 2005 @Noosa Head 7 Thank you! IV&V model IV&V plan IV&V result Plan (by Strategic planning model) Do (by Individual techniques) See (by Value based technique)
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.