1. 2 Safety work-stoppage PDO & its contractors have suffered THREE high potential incidents involving cold cutting in the last TWO months.

Slides:



Advertisements
Similar presentations
(Project Name) Site Safety Orientation. Family of Companies.
Advertisements

Incident took place at OPP substation at 9. 31
1 Smoking is dangerous, it can cause fire in the presence of gas, flammable materials, etc. Smoking is only allowed in the Smoking Designated areas. Any.
BEDRE GJENNOM KUNNSKAPSDELING SHARING TO BE BETTER CAKE Q2 LIFTING INCIDENT.
HSSE Policy Z Contractor HSSE Induction V2. HSSE Policy Z Contractor HSSE Induction V2.
Compliance - Work Permit CAKE Session 17. Purpose of the Work permit system: The Purpose of the system is to: - Prevent undesired incidents and mitigate.
Safety & Security Contractor Induction Property Management.
1 The task: Salvaging Operation. Included cutting and removal of equipment from site WELDER FATALITY August 2003.
Work with a valid work permit when required
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
Energy Supporting Energy 1 1 DROPS Forum 12 th April 2011 Ron Martin Corporate HSE Advisor.
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
INDUCTION Welcome to the Victorian Association of Performing Arts Centres (VAPAC) and Darebin Arts & Entertainment Centre’s (DAEC) Emergency Procedure.
Lumbermen’s Underwriting Alliance
1 Well Engineering has suffered an alarming and increasing number of incidents of injuries resulting from the use of Hand Tools ! Using the wrong Hand.
BEDRE GJENNOM KUNNSKAPSDELING SHARING TO BE BETTER CAKE Q2 Liftingcase.
1 Incident Summary A fatal incident occurred at the Amin (Nimr) Steam Pilot project site on Thursday 20th September, 2012 at an approximate time of 14:10.
1 ACG Pipelay Barge “Israfil Guseynov” Fatal Accident Summary 24 th April 2005.
Hazardous Waste and Emergency Response
Chapter 1.5 Accident Prevention. A catering kitchen can be a dangerous place. Some machinery (electrical equipment) cannot be operated by people who are.
Health & Safety Site Verification Audit Procedural Training F b RevNo: 0 / Omni Facility Services Health & Safety Site Verification Audit.
Contact with a Stored Energy Source 1 Feb 2012 Summary of events Contributing factors Moving forward, What did we learn and do.
“Incident Free Starts With ME”
Incident Investigation and Analysis
March 2015 Safety. Begin the meeting with: Does anyone have examples of “Stop the job”? Does anyone have any safety concerns? Review significant company.
Haul Truck Backs into T65 Dozer. Front view of Dozer 2.
Grader and Pick up Incident June 30 th, Incident Overview 2  On September 20 th,2011 at approximately 2:30am Dan had just finished filling 3 of.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
Hot Work Permit Osan AB Fire Emergency Services.
Always use proper handles of the pipe spinner
PDO Second Alert What happened:
Always use mechanical handling aids when carrying out a heavy lift
PDO Safety Advice What happened?
No Removal of cellar frames by hands
Injury: Fall from height
PDO Safety Advice Date: Injury: Fractured finger
Goodyear Napanee Contractor Safety
PDO Incident First Alert - PDO
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Always wear fall protection equipment when working at height
LIFTING & HOISTING ENGAGEMENT PACK
PDO Second Alert Date: Incident: LTI What happened?
PDO Safety Advice Date: 11/08/2015 Injury: Amputated fingers
PDO Safety Advice Use this Alert: Discuss in Tool Box Talks and HSE Meetings  Distribute to contractors  Post on HSE Notice Boards  Include in site.
Keep away from “Line of Fire”
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Follow the rules to save a life
Check & avoid potential Pinch points
SAFE WORK INSTRUCTIONS
PDO Second Alert Always follow the PTW procedures
Stay out of the “Line of Fire”
PDO Incident First Alert - Al Haditha Oil Field Services
PDO Second Alert What happened? Your learning from this incident..
Injury : fractured finger Keep your hands out of the line of fire
Be aware of potential pinch points
Always intervene an unsafe act
Always get authorization before starting any job!
PDO Safety Advice Date: 23/08/2015 Injury: Fractured fingers
Effective communication prevents incidents
Stay away from line of fire
Keep away from “Line of Fire”
Only perform tasks under your responsibility
4 Point Crosscheck, Assure & Accountability Programme
Always verify isolation before starting any electrical job!
LOCKOUT/TAGOUT By: Kory Hildebrand.
Pipeline Tie-In Activity, a Lesson Learned
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

1

2 Safety work-stoppage PDO & its contractors have suffered THREE high potential incidents involving cold cutting in the last TWO months.

Cold cutting incidents A contractor was dismantling a redundant flow line when one of its operators placed the cold cutter on the wrong / pressurised line. (1 st February 2015) As part of shutdown activities a contractor was performing cold cutting on a 12” HP wet gas pipeline, as the operator was about to finish cutting through the pipe, pressurized gas (estimated at between 5-10 bar) was released from the cutting point hitting and causing him to fall to the ground with injuries to his face. (4th March 2015) A contractor was engaged in cleaning operations when the Permit Holder decided to cold cut a redundant line (not mentioned in the PTW) however, the crew placed the cutter on the wrong line causing damage to the line. (29th March 2015)

Learning from Incidents For PDO staff and contractors Contractor places cold cutter on wrong pressurised line 1 4 A contractor was dismantling a redundant flow line when one of its operators placed the cold cutter on the wrong / pressurised line. (1 st February 2015)

What happened : Contractor places cold cutter on wrong pressurised line 1 5 On 1 st February 2015 at approximately 0800 hours a crew was involved in a high potential cold-cutting incident, in Yibal Area. The crew was mobilised to continue the dismantling of the remaining section of the redundant Y-514 flow line that was partially completed in previous days. The work started after the morning Tool Box Talk when the fitter placed the cold cutter on the wrong / pressurised section of the newly replaced flow line and started cutting the line. Immediately, a member of the second crew intervened to STOP the activity when he realized the cutter had been placed on the wrong flow line. The cut mark depth on the flow line was found to be ~ 0.5mm of the 4.8mm wall thickness.

Why do we think it may have happened?  Fitter failed to follow the marking marked for cold cutting.  The fitter could not distinguish between the lines (the redundant and live line).  The supervisor did not confirm that the crew has placed the cutter on the required line prior to cutting. Contractor places cold cutter on wrong pressurised line 1 6

As part of shutdown activities a contractor was performing cold cutting on a 12” HP wet gas pipeline, as the operator was about to finish cutting through the pipe, pressurized gas (estimated at between 5-10 bar) was released from the cutting point hitting and causing him to fall to the ground. (4 th March 2015) Learning from Incidents For PDO staff and contractors Contractor operator cuts through pressurised gas line 2 7

What happened : On 4 th March 2015 as part of shutdown activities the IP was performing cold cutting on a 12” HP wet gas pipeline in the GGP Yibal manifold area. At around 1855 hours, as the IP was about to finish cutting through the pipe, pressurized gas (estimated between 5-10 bar) was released from the cutting point hitting the IP and causing him to fall to the ground a meter or so away. The fire & gas detection set off the emergency alarm and the site was evacuated. The Permit Holder who had been supervising the work informed the PDO Area Authority who found the IP, gave first aid and sent for the rescue team (ambulance). Contractor operator cuts through pressurised gas line 2 8

Why do we think it may have happened?  Five Class A permits were issued to the contractor on 4 th March between 7:30 am and 10:30am, each permit contained more than one tie-in, in total around 51 tie-ins were grouped into five permits. Isolation certificates were not issued with the permits.  The Permit Holder had completed his allocated work ahead of the schedule, the Lead Piping Manager instructed him to start the cold cutting for Tie in 552B, assuming that all the tie-in locations were already fully isolated and safe to work. This assumption was shared by most contractor personnel.  The job was executed without the Permit Holder amending & validating his permit.  The pressure gauge on the line was not checked prior to commencing cutting the line. Contractor operator cuts through pressurised gas line 2 9

Learning from Incidents For PDO staff and contractors Contractor cold cuts line during cleaning operations 3 10 A contractor was engaged in cleaning operations when the Permit Holder decided to cold cut a redundant line (not mentioned in the PTW) however, the crew placed the cutter on the wrong line causing damage to the line. (29 th March 2015)

What happened : Contractor cold cuts line during cleaning operations 3 11 At about 1415 Hrs, Mechanical crew were engaged in site cleaning activity (shifting and removal of cut pipes). During the process the Permit Holder decided to cold cut the redundant MM265 line (which was not mentioned in the permit) however, the crew placed the cold-cutting device on the live oil flowline MM264 which was running parallel to MM265. The crew stopped the activity after seeing drops of oil coming out from MM264.

Why do we think it may have happened?  The crew could not distinguish between the lines (the redundant and live line).  The permit holder did not confirm that the crew has placed the cutter on the required line prior to cutting.  The job was executed without the Permit Holder amending & validating his permit. Contractor cold cuts line during cleaning operations 3 12 MM264 MM265

Safety day video clip: Intervene  Intervene 13

Discussion: How do you ensure you are cutting the correct flowline/pipeline? How do you know if the line is live or not? What are the topics to be discussed in the Toolbox Talk before cold-cutting activity takes place? How do you find out the correct steps for the cold-cutting activity? Do you have a valid permit to work/authorization to start cold-cutting activity? Are the flowlines to be worked on marked clearly and correctly? How do you supervise the cold-cutting task? Are you familiar with the cold-cutting procedures PR-1146 & PR-1991? Discussion Points 14