OHIO Replacement Ship Design

Slides:



Advertisements
Similar presentations
Trusted Computing in Government Networks May 16, 2007 Richard C. (Dick) Schaeffer, Jr. Information Assurance Director National Security Agency.
Advertisements

1 Proprietary and Confidential New Jersey Clean Air Council Public Hearing April 1, 2009 Jeff Halfinger Babcock & Wilcox.
U.S. Submarine Force Way Ahead
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
D E V CO D ESIGN & D EVELOPMENT AUTO SAFETY FEATURE.
Office of Nuclear Energy 1May 20, 2013 Property Management Workshop Office of Nuclear Energy Program Perspective Delivering Nuclear Solutions for America's.
Panel 5: The Latest in OA Innovation and C4ISR 4 November, 2014 Mike Rice President / Senior Systems Engineer R2E Inc.
April 6, NPR in Context Third comprehensive review of U.S. nuclear policies and posture –Previous reviews in 1994 and 2001 Conducted by DoD.
© Siemens Industry, Inc Confidential / Drive Your Business Forward Ignite the Power of New Products and Partnerships Siemens Fire Partner Summit.
F/A-18E/F SUPER HORNET BLOCK II MULTI-YEAR PROCUREMENT
SAMSUNG HEAVY INDUSTRIES SAMSUNG Global Trend toward Protection of the Environment in Shipbuilding Industries October 16, 2010 Samsung Heavy Industries.
Nuclear Submarines Opportunities and Challenges. Nuclear Submarines The MoD believes that the UK should retain onshore a sovereign capability in the design,
Becoming a Submariner Force Structure Missions Submarine Officer Career Path Becoming a Submariner Force Structure Missions Submarine Officer Career Path.
13 January 2005 Slide 1 National Defense University – Institute for National Strategic Studies China’s Strategic Force Modernization Dr. Phillip Saunders.
Office of the Secretary of Defense Defense Microelectronics Activity (DMEA) Defense Microelectronics Activity (DMEA) Doug Casanova Defense Microelectronics.
NAVAL ANTI-SUBMARINE COMBATANT CRAFT (NASCC)
1 ACPR Advanced, cost competitive, proven technology, and reliable The Third Generation Nuclear Reactor.
Copyright © 2011 Raytheon Company. All rights reserved Customer Success Is Our Mission is a registered trademark of Raytheon Company. Statement A: Approved.
1 Software Engineering II Presentation Software Maintenance.
SEA1000 Industry Briefing David Gould General Manager.
INTERIOR WALL FINISHES
Flexible Ships Affordable Relevance over the Life Cycle
Nickolas Guertin, PE DASN RDT&E, Director for Transformation
ERP Benefits.
Submarine Community / Warfare Submarine. Becoming a Submariner Force Structure Missions Submarine Officer Career Path Becoming a Submariner Force Structure.
Undersea Warfare.
Ship Common Information Model (SCIM)
April 5, The President’s Nuclear Security Agenda First articulated in Prague in April 2009 –Reduce nuclear dangers and pursue the long-term goal.
Steven Pifer Senior Fellow Center on the United States and Europe Foreign Policy Studies The Brookings Institution New START: Treaty.
N-77/ PB Cuts Slashing the Submarine Force Claudia Peña-Guzman Javier Figueroa Jun Constantino Mark Greene Jeff Finlay.
Manned Ground Vehicles 2004 Combat Vehicles Conference
Chapter 2 The process Process, Methods, and Tools
Software Process and Models
NOVEMBER SHIPBUILDING AND SHIP PROCUREMENT FOR THE SPANISH NAVY BRIEFING FOR: SCHOOL OF POLICY STUDIES QUEEN'S UNIVERSITY BRIEFING FOR: SCHOOL OF.
US Dependence on Strategic Nuclear Weapons Does shifting to “zero” make sense? Keith Hansen June 15, 2012.
1 South Limestone Street | Springfield, Ohio | | ren-services.com Renaissance Services: Capabilities, Experience, and Solutions November.
Tactical Stealth Visby as a Case Study Naval Postgraduate School
Panel Three - Small Businesses: Sustaining and Growing a Market Presence Open Interfaces and Market Penetration Protecting Intellectual Innovation and.
1 A Perspective on New Maritime Strategy in the Current Environment John O’Neill.
Opportunities and Challenges Joseph Naser Electric Power Research Institute IAEA Technical Working Group on Nuclear Power Plant Control and Instrumentation.
Trident after the election John Ainslie Coordinator Scottish CND Presentation for Scottish CND Post-Election Conference STUC 15 May 2010.
1 The Benefits of an SOA in the Contact Center Brian Garr Program Director, IBM Speech Solutions.
1 Click to edit Master title style ROCKWELL COLLINS STEP VISION Jack R. Harris Director, Advanced Manufacturing Technology Rockwell Collins
Sustainability/Logistics – Transportation and Distribution Management (4b) Technology Enabled Capability Demonstration Alan Santucci
UAS Combat Threat Survivability SURVICE Engineering Company
From the Installation and Certification Group to the Engineering and Development Section Patrick Grenard Chief, Engineering & Development, IMS Vienna International.
Houston Material Handling Society October 2008 Baghouse Cleaning Control Presented by: T.J. Winalski.
1/23 Prescriptive Process Models. 2/23 Prescriptive Models Prescriptive process models advocate an orderly approach to software engineering Prescriptive.
AFRL Nuclear S&T Investment Strategy Dr. David Hardy SES Associate Director for Space Technology Air Force Research Laboratory 27 August 2010.
TRIDENT SSGN Multi-Mission Tactical Capability.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
By: Tyler Callese. Thesis America’s aging nuclear deterrent must be either modernized or have a life extension program enacted because of the imminent.
An ASSA ABLOY Group Company ASSA ABLOY ABLOY SECURITY, INC. The Maximum Solution for Gaming Key Control ABLOY SECURITY, INC. presents Click each slide.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Defense Science Board Task Force on Sea Basing. Summary of Conclusions Sea basing - a critical future national competence for assuring access to areas.
MAS967 Technology Strategy for New Enterprises Class 2: The evolution of industries, technologies & markets Professor Fiona Murray.
DOD STANDARDIZATION CONFERENCE
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Emerging Global Trends and Strategic Challenges in the Coming Decade Marvin J. Cetron, President, Forecasting International June 12, 2012 Emerging Global.
ABOUT COMPANY Janbask is one among the fastest growing IT Services and consulting company. We provide various solutions for strategy, consulting and implement.
International Security and Peace
“Existing world order is being redefined.” Henry Kissinger Jan 2015
Getting What You Pay For
Enterprise Architecture at Penn State
Getting What You Pay For
Donald Hamadyk Director, Research and Development
DIMETRA™ EXPRESS SYSTEM SERVICES
Presentation transcript:

OHIO Replacement Ship Design Mike Breslin Technical Director OHIO Replacement Program

OHIO Replacement SSBN 21st Century Capability… Sufficient payload:16 missile tubes Meets USSTRATCOM requirements Flexibility to handle problems across triad or degradation in strategic environment Sufficient stealth to address the projected threat through the 2080s 12 OR SSBNs to replace 14 OHIOs Life-of-ship reactor core Reduced mid-life maintenance period Maximize reuse of OHIO and VIRGINIA components to minimize cost (Large Aperture Bow Array) Additional Array OHIO Replacement SSBN Attributes In an Affordable Platform… Lead ship construction must commence in 2021 First Strategic Patrol in 2031 Maintains fleet of 10 operational SSBNs through transition to OHIO Replacement Procurement timeline meets USSTRATCOM requirements with moderate operational risk during transition period Low margin for unforeseen SSBN maintenance issues or late OHIO Replacement delivery 12 OR SSBNs needed to meet long term requirements during OHIO Replacement mid-life overhaul period At Responsible Cost… 2

Design / Technology Development Philosophy Design – Build – Sustain Cost Reduction – Design for Affordability / Sustainability Leverage VA Class Cost Reduction Success Stealth = Survivable = Credible Nuclear Deterrent Enhance Design Maturity at Construction Start Deploy Strategic Deterrence through Integration of the Existing TRIDENT II D5 Weapon System into the OHIO Replacement Maximize use of components previously developed and qualified for VIRGINIA Class, SEAWOLF Class, and OHIO Class 3

OHIO Replacement Characteristics 16 x 87” Missile Tubes/ (D5-LE SWS) Fairwater Planes Centerline Access Sail (6-VA UMMs, OHIO-Height) X-Planes Scheme “C” Scaled VIRGINIA-Like LAB (passive only, no HFCA) VIRGINIA Class Hull Treatments Other Characteristics 43’ Hull Diameter 155 Total Accommodations 14 Torpedo Stows using VA reconfigurable architecture VIRGINIA-Like ARCI/AN-BYG1 OHIO-like thin line and fat line array 4” Keel plate in MC Min reserve buoyancy = 12.0% Flank Array   OHIO OR Nov 2014 Length Between Planes 559.3 ft 560.1 ft Diameter 42 ft 43 ft # of Missile Tubes 24 16 4

OHIO Replacement Design & Development OHIO REPLACEMENT (OR) System and Component Re-use New Development VIRGINIA Class OHIO Class New Items Propulsor Universal Modular Mast Rafted Deck Ship Control System Towed Array System NPES Hull Coatings Torpedo Tubes Large Aperture Bow Array ICCP/ Circuit D WSHS Pumps/Valves Vacuum Sanitary Heat Exchangers Integrated Low Pressure Electrolysis Strategic Weapons System Strategic Weapons System Support Systems Missile Compartment Communications Buoy Emergency Beacon Buoy Fairwater Planes TNT Superstructure Propulsion Drive Train - Electric Drive - Quick Disconnect Duct - Shaft Bearing Journal - Tapered Shaft/Duo-Bloc Hub 42 Year Operational Life X-Stern Integrated Tube/Hull Construction Air Conditioning Plant Advanced Carbon Dioxide Removal Unit ESGN Replacement Thin Line Towed Array Handler HM&E Monitoring and Control (HMC) Cold Mold Bow Dome 5

OHIO Replacement Design Specifics Acoustic requirements resulting in Electric drive and Isolated Deck Modules 16 missile tubes; Increased frame spacing (43” vs. 41”) for producibility Bow shape for sonar, tank volume for draft and buoyancy requirements Propulsor for acoustics; tank volume for draft and buoyancy requirements Battery displaced from forward compartment to support operations and maintainability Re-use of VACL torpedo room design and Isolated Deck Modules 6

Recent Affordability Initiatives Delivering the Core Essential Military Capability at the Lowest Possible Cost Delivering the Core Essential Military Capability at the Lowest Possible Cost Detailed requirements review produced savings Reduced number of missile tubes Reduced missile tube diameter Reduced torpedo room capacity Removed chin array Reduced sail mast capacity Reduced force protection features Reduced OHIO Replacement unique design features 20 to 16 tubes 97 inches to 87 inches Minimum capacity for defensive load only Minimum acoustic sensors for defensive detection; leverage VIRGINIA-Class combat systems 10 to 6 masts Current OHIO-Class system Increased use of VIRGINIA-Class components Recent Affordability Initiatives EOQ and multi-year procurement Facilities Design for producability Requirements and regulations Integrated Product Development Environment (IPDE) Manufacturing technologies, service, and support (CY10 $s) Costs developed by NAVSEA05C for OHIO Replacement Service Cost Position; Inflation based on NAVSEA 05C Jan 2010 SCN Shipbuilding Composite Inflation Table 7

EB & NAVSEA are Challenging Cost Drivers Across the Life-Cycle 8

OHIO Replacement “6-16-6” Maintenance Life Cycle DD Refits – 30 Non DD Refits – 94 Total Refits – 124 Total Refit Duration – 157 months Assumptions: Three 77 day patrols and one 62 day patrol between dry dock refits 35 day non-docking refits (22 production days; 94 throughout life cycle) 50 day dry dock refits every 4 patrols (35 production days; 30 throughout life cycle) 3 Major availabilities Two 6-month Extended Refit Periods (ERPs) around 10-year & 32-year point One 16-month Engineering Overhaul (EOH) around the 20-year mid-life Life-of-ship core TRIPER OPCYCLE modeled after nominal OHIO schedule 9

OHIO Replacement “Quad Pack” Construction Process State-of-the-Art Construction Processes Minimize Cost and Save Time OHIO Replacement “Quad Pack” Construction Process F-Fixture 84% Outfitted Missile Tube E-Fixture Quad Packs Prototype Missile Tube Reduces missile compartment costs and construction time 10

Manufacturing & Assembly Plan 11

OHIO Replacement Ensures Strategic Deterrence into the 2080’s The U.S. will retain nuclear weapons for the foreseeable future The Triad (SSBNs, ICBMs, Bombers) provides effective nuclear deterrence and assurance Deployed U.S. strategic warhead numbers have decreased significantly, however majority are now carried by SSBNs The SSBN force provides the U.S. with a survivable assured response capability SSBNs use adaptability to cope with change The current OHIO Class SSBN force is reaching the end of its operational service life Further delays in the OHIO Replacement SSBN would gap at-sea strategic requirements OHIO Replacement SSBN meets the 21st century requirement for survivable strategic deterrence at minimal cost OHIO Replacement leverages 50+ years of SSBN design and operation experience and combines it with the cost-control lessons of the VIRGINIA-class SSN to provide an assured response capability for the future in a lean and cost-efficient manner The OHIO Replacement SSBN is a cost-effective recapitalization of our Nation’s sea-based strategic deterrent 12

Questions/Comments 13