Presentation is loading. Please wait.

Presentation is loading. Please wait.

Donald Hamadyk Director, Research and Development

Similar presentations


Presentation on theme: "Donald Hamadyk Director, Research and Development"— Presentation transcript:

1 Donald Hamadyk Director, Research and Development
HII-Newport News Shipbuilding

2 Accelerated Capability Needs for Future Surface Combatants: An Ecosystem View
Don Hamadyk Director, R&D HII-Newport News Shipbuilding Member, NSRP Executive Control Board

3 Related Themes From “Modular Adaptable Ships”
THE NEED THE PHYSICS THE OPPORTUNITIES From WIKIPEDIA: Birmingham CL-2 RAND - Designing Adaptable Ships – Modularity and Flexibility in Future Ship Designs Cover Illustration

4 Power Competition = Shifting of Gears
The NEED AGILITY !! Power Competition = Shifting of Gears

5 F=ma Will Remain In Effect For The Foreseeable Future
The PHYSICS STABILITY SHOCK MANEUVERING & CONTROL SYSTEM TECHNICAL PERFORMANCE CORROSION SURVIVABILITY POWER MANAGEMENT SIGNATURES HYDRODYNAMICS F=ma Will Remain In Effect For The Foreseeable Future

6 The OPPORTUNITIES OPEN ARCHITECTURE SWAPc / MARGINS COMMONALITY
ADVANCED WEAPONS ADVANCED SENSORS ADVANCED HULL MATERIALS OPEN ARCHITECTURE SWAPc / MARGINS COMMONALITY BUILD STRATEGY AFFORDABILITY PRODUCIBILITY ADVANCED COATINGS Challenge: Feasibly Match Capabilities to Technologies to Pathways

7 Example Enabler: Flexible Infrastructure (FI)
A system of systems that provides the capability for rapid compartment re-fit without the use of “hot work” and provides the following benefits: Objectives: Maximize time for technology development prior to equipment installation during construction outfitting Eliminate cost and schedule impacts associated with the traditional conflicts from re-work and change orders during new construction Ease compartment reconfiguration to support changing missions and lifecycle refresh of electronic components

8 Flexible Infrastructure – Path To Adoption
IR&D NSRP ManTech SBIR CVN Application Surface Navy Concept RA & Panel Projects Standards / Interfaces / Quals Track Profile False Deck Panel Improvement Testing Prototyping POC CVN77 CVN72 CVN73 CVN79 LHA 7 FUTURE SURFACE COMBATANTS DDG114 LPD 28 LHA8 Complete Creating The Pathways In Progress

9 Flexible Infrastructure – False Deck Panel Improvement
IR&D CVN 79 DFA NSRP ManTech CVN Application Surface Navy Concept: Reduce Cost/ Expand Supplier Base Survey Industry for Potential Solution Performed FI Tile System Functional Analysis Developed FI Deck Tile Performance Specification Material Investigation Performed Prototype Tile Developed Testing Performed X-Platform MIL-PRF Developed From Performance Specification Industry Survey Performed and Material & Processes Evaluated Vendor Prototypes Developed IAW MIL-PRF Fire/ Mechanical Testing and Qualification CVN73 CVN79 CVN80 CVN81 LPD 29 LHA8 FUTURE SURFACE COMBATANTS Complete The Hard Work of Technical Rigor In Progress

10 Digital Thread Emerging Opportunity For Acceleration Digital Connections Will Increasingly Shape and Enable The Opportunities

11 The NEED The PHYSICS The OPPORTUNITIES


Download ppt "Donald Hamadyk Director, Research and Development"

Similar presentations


Ads by Google