Statistical Process Control Dr. Ron Lembke. Statistics.

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

© 1997 Prentice-Hall, Inc. S3 - 1 Principles of Operations Management Quality Via Statistical Process Control Chapter S3.
Operations Management Statistical Process Control Supplement 6
Quality and Operations Management Process Control and Capability Analysis.
Chapter 9A Process Capability and Statistical Quality Control
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Chapter Topics Total Quality Management (TQM) Theory of Process Management (Deming’s Fourteen points) The Theory of Control Charts Common Cause Variation.
BMM 3633 Industrial Engineering
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Statistical Process Control Operations Management Dr. Ron Lembke.
Quality management: SPC II
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Quality Control Chapter 8- Control Charts for Attributes
Agenda Review homework Lecture/discussion Week 10 assignment
Chapter 9- Control Charts for Attributes
Chapter 18 Introduction to Quality
Statistical Process Control Operations Management Dr. Ron Tibben-Lembke.
Statistical Process Control
Statistical Process Control Managing for Quality Dr. Ron Lembke.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
Process Improvement Dr. Ron Tibben-Lembke. Statistics.
CHAPTER 8TN Process Capability and Statistical Quality Control
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Statistical Process Control
Process Improvement Dr. Ron Tibben-Lembke. Quality Dimensions  Quality of Design Quality characteristics suited to needs and wants of a market at a given.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
Statistical Process Control Operations Management Dr. Ron Tibben-Lembke.
Using Control Charts to Keep an Eye on Variability Operations Management Dr. Ron Lembke.
Control Charts for Attributes
QUALITY CONTROL AND SPC
X-bar and R Control Charts
Statistics for Managers Using Microsoft® Excel 4th Edition
1 Chapter 6 Statistical Process Control (SPC) 2 Descriptive Statistics 1. Measures of Central Tendencies (Location) Mean Median = The middle value Mode.
Statistical Process Control
Statistical Applications in Quality and Productivity Management Sections 1 – 8. Skip 5.
© 2004 Prentice-Hall, Inc. Basic Business Statistics (9 th Edition) Chapter 18 Statistical Applications in Quality and Productivity Management Chap 18-1.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
© 2003 Prentice-Hall, Inc.Chap 13-1 Business Statistics: A First Course (3 rd Edition) Chapter 13 Statistical Applications in Quality and Productivity.
Business Statistics: A First Course, 5e © 2009 Prentice-Hall, Inc. Chapter 14 Statistical Applications in Quality Management Business Statistics: A First.
Control Charts for Attributes
© 2002 Prentice-Hall, Inc.Chap 15-1 Statistics for Managers Using Microsoft Excel 3 rd Edition Chapter 15 Statistical Applications in Quality and Productivity.
Chapter 10 Quality Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Welcome to MM305 Unit 8 Seminar Diallo Wallace Statistical Quality Control.
Statistical Process Control (SPC)
Slide Slide 1 Copyright © 2007 Pearson Education, Inc Publishing as Pearson Addison-Wesley. Lecture Slides Elementary Statistics Tenth Edition and the.
© 2003 Prentice-Hall, Inc. Quantitative Analysis Chapter 17 Statistical Quality Control Chap 17-1.
11/23/2015ENGM 720: Statistical Process Control1 ENGM Lecture 08 P, NP, C, & U Control Charts.
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Statistical Applications in Quality and Productivity Management.
Statistical Quality Control
1 Six Sigma Green Belt Introduction to Control Charts Sigma Quality Management.
Production and Operations Management: Manufacturing and Services PowerPoint Presentation for Chapter 7 Supplement Statistical Quality Control © The McGraw-Hill.
Slide 1 Copyright © 2004 Pearson Education, Inc..
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Quality Control  Statistical Process Control (SPC)
© 1998 Prentice-Hall, Inc. Statistics for Managers Using Microsoft Excel, 1/e Statistics for Managers Using Microsoft Excel Statistical Applications.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 18-1 Chapter 18 Statistical Applications in Quality and Productivity Management Basic Business.
POPULATION VERSUS SAMPLE
Statistical Process Control (SPC)
Statistics for Managers Using Microsoft Excel 3rd Edition
Agenda Review homework Lecture/discussion Week 10 assignment
Process Variability and Capability
Statistical Process Control
Statistical Process Control
Statistical Process Control
Presentation transcript:

Statistical Process Control Dr. Ron Lembke

Statistics

Measures of Variability  Range: difference between largest and smallest values in a sample Very simple measure of dispersion R = max - min  Variance: Average squared distance from the mean Population (the entire universe of values) variance: divide by N Sample (a sample of the universe) var.: divide by N-1  Standard deviation: square root of variance

Skewness  Lack of symmetry  Pearson’s coefficient of skewness: Skewness = 0 Negative Skew < 0 Positive Skew > 0

Kurtosis  Amount of peakedness or flatness Kurtosis < 0 Kurtosis > 0 Kurtosis = 0

Table 14.2  Is everything OK?  How can we decide?  Does it look normal?

Histogram of 150 data points  Histogram looks pretty normal, but definitely not perfect.  Looks like 2 peaks, actually, but pretty normal.

Is it Normal?  Sorted all 150 data points, plotted  Mean = , stdv =

Compute 1,2,3 sigma limits

Is it Normal?  F(m-3s) = 0F(m+1s) = 129/150 = 0.86  F(m-2s) = 7/150 = F(m+2s) = 149/150 =  F(m-1s) = 24/150 = 0.16F(m+3s) = 150/150 = 1.00  F(m) = 71/150 = 0.473

Is it Normal?  DataTheoretical  F(m-3s) =  F(m-2s) =  F(m-1s) =  F(m) =  F(m+1s) =  F(m+2s) =  F(m+3s) =  Values we get are pretty close to a normal distribution.

Real Test of Normality  Kolmologorov-Smirnov  Anderson-Darling Sadly, we don’t have time for either today You need SAS or something like it. Excel can’t do everything.

Process Capability  UTL = 1.0  LTL = 0.5  Cpk > 1.0  Process capable, but barely  Is everything OK?

Plot Data over time  No significant trend to data?

Plot Data over time  Data is in sets of 5, all taken at same time.  Plotting individual points makes us see trends that aren’t really there.  Solution – plot averages of each sample

Sample Means

Control Chart  Control Limits are mean +/- 3 std. dev.

We have Out-of-Control Points  Looks like the mean has shifted.  Something is definitely wrong.

Control Limits catch early  In fact, we should compute control limits using first 17 data points

Revise Control Limits  New control limits using first 16 data points.

Control Chart Usage  Only data from one process on each chart  Putting multiple processes on one chart only causes confusion  10 identical machines: all on same chart or not?

In Control  A process is “in control” if it is not affected by any unusual forces  Compute Control Limits, Plot points

X-bar Chart for Averages

Definitions of Out of Control 1. No points outside control limits 2. Same number above & below center line 3. Points seem to fall randomly above and below center line 4. Most are near the center line, only a few are close to control limits 1. 8 Consecutive pts on one side of centerline 2. 2 of 3 points in outer third 3. 4 of 5 in outer two-thirds region

You’re manager of a 500-room hotel. You want to analyze the time it takes to deliver luggage to the room. For 7 days, you collect data on 5 deliveries per day. Is the process in control? Hotel Example

Hotel Data DayDelivery Time

R &  X Chart Hotel Data Sample DayDelivery TimeMeanRange Sample Mean =

R &  X Chart Hotel Data Sample DayDelivery TimeMeanRange Sample Range = LargestSmallest

R &  X Chart Hotel Data Sample DayDelivery TimeMeanRange

R R Chart Control Limits R k i i k      

R Chart Control Limits Solution From B-1 (n = 5) R R k UCLDR LCLDR i i k R R        (2.114)(3.894)8232 (0)(3.894) 

R Chart Control Chart Solution UCL

 X Chart Control Limits Sample Range at Time i # Samples Sample Mean at Time i

 X Chart Control Limits From Table B-1

R &  X Chart Hotel Data Sample DayDelivery TimeMeanRange

 X Chart Control Limits X X k R R k i i k i i k            

 X Chart Control Limits From B-1 (n = 5) X X k R R k UCLXAR i i k i i k X            *  

 X Chart Control Limits Solution From Table B-1 (n = 5) X X k R R k UCLXAR LCLXAR i i k i i k X X             (058) 5813(058) (3.894) =   (3.894) = 8.060

 X Chart Control Chart Solution*  X, Minutes Day UCL LCL

Subgroup Size  All data plotted on a control chart represents the information about a small number of data points, called a subgroup.  Variability occurs within each group  Only plot average, range, etc. of subgroup  Usually do not plot individual data points  Larger group: more variability  Smaller group: less variability  Control limits adjusted to compensate  Larger groups mean more data collection costs

General Considerations, X-bar, R  Operational definitions of measuring techniques & equipment important, as is calibration of equipment  X-bar and R used with subgroups of 4-9 most frequently 2-3 if sampling is very expensive 6-14 ideal  Sample sizes >= 10 use s chart instead of R chart.

Single Data Points?  What if you only have one data point on a process? Inspect every single item There is no range. R=0?  Charts for Individuals (x-Chart) CL: x-bar +/- 3R-bar/d2 R = difference between consecutive units Draw control limits on the chart We can also put User specification limits on, for reference purposes Doesn’t catch trends as quickly Normality assumption must hold

Attribute Control Charts  Tell us whether points in tolerance or not p chart: percentage with given characteristic (usually whether defective or not) np chart: number of units with characteristic c chart: count # of occurrences in a fixed area of opportunity (defects per car) u chart: # of events in a changeable area of opportunity (sq. yards of paper drawn from a machine)

p Chart Control Limits # Defective Items in Sample i Sample i Size

p Chart Control Limits # Defective Items in Sample i Sample i Size z = 2 for 95.5% limits; z = 3 for 99.7% limits # Samples

p Chart Control Limits # Defective Items in Sample i # Samples Sample i Size z = 2 for 95.5% limits; z = 3 for 99.7% limits

p Chart Example You’re manager of a 500- room hotel. You want to achieve the highest level of service. For 7 days, you collect data on the readiness of 200 rooms. Is the process in control (use z = 3)? © 1995 Corel Corp.

p Chart Hotel Data No.No. Not DayRoomsReady Proportion /200 =

p Chart Control Limits

p Chart Control Limits Solution

p Chart Control Limits Solution

p Chart Control Chart Solution UCL LCL

P-Chart Example  Enter the data, compute the average, calculate standard deviation, plot lines

Dealing with out of control  Two points were out of control. Were there any “assignable causes?”  Can we blame these two on anything special? Different guy drove the truck just those 2 days. Remove 1 and 14 from calculations. p-bar down to 5.5% from 6.1%, st dev, UCL, LCL, new graph

Revised p-Chart

Different Sample sizes  Standard error varies inversely with sample size  Only difference is re-compute  for each data point, using its sample size, n. Why do this? The bigger the sample is, the more variability we expect to see in the sample. So, larger samples should have wider control limits. If we use the same limits for all points, there could be small-sample-size points that are really out of control, but don’t look that way, or huge sample-size point that are not out of control, but look like they are. Judging high school players by Olympic/NBA/NFL standards.

Different Sample Sizes

How not to do it  If we calculate n-bar, average sample size, and use that to calculate a standard deviation value which we use for every period, we get: One point that really is out of control, does not appear to be OOC 4 points appear to be OOC, and really are not.  Only potentially do this if all values fall within 25% of the average But with computers, why not do it right?

5 false readings

np Charts – Number Nonconforming  Counts number of defectives per sample  Sample size must be constant

C-Chart Control Limits  # defects per item needs a new chart  How many possible paint defects could you have on a car?  C = average number defects / unit  Each unit has to have same number of “chances” or “opportunities” for failure  UCL c z C   c LCLz C  c c

Paint Blemishes

Number of data points  Ideally have at least 2 defective points per sample for p, c charts  Need to have enough from each shift, etc., to get a clear picture of that environment  At least 25 separate subgroups for p or np charts

Small Average Counts  For small averages, data likely not symmetrical.  Use Table 7.8 to avoid calculating UCL, LCL for averages < 20 defects per sample  Aside: Everyone has to have same definitions of “defect” and “defective” Operational Definitions: we all have to agree on what terms mean, exactly.

U charts: areas of opportunity vary  Like C chart, counts number of defects per sample  No. opportunities per sample may differ  Calculate defects / opportunity, plot this.  Number of opportunities is different for every data point  n i = # square feet in sample i