SPECIAL ORDER BY CONSENT EMC SOC WQ S04-009. SOC Attachment 1: Summary of Major Line Replacement Completed DescriptionTotal Linear Footage Meadow Greens.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

PRESENTATION FOR CWEA TRAINING Keys to Successful Pipeline/Infrastructure Projects Pipeline Flow Diversion Presented by: Tom Epperson, PE, Tetra Tech.
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
Bergen County Utilities Authority Bergen County Utilities Authority Little Ferry, New Jersey Rain Derived Infiltration/Inflow Reduction and Sanitary Sewer.
Wastewater Collection (Sewer Alternatives). Sewer Basics Collection and transport of wastewater from each home/building to the point where treatment occurs.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 17, 2012 DC WATER Hosted by: DBIA-MAR Monthly Luncheon Water Wastewater.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
October 20-21,2009 Agenda Item 6a.. Ohio River CSO Communities Pennsylvania – 10 communities West Virginia – 10 communities Ohio – 10 communities Kentucky.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
City of Los Angeles Venice Dual Force Main Project
2013 Stormwater Workshop June 13, 2013 Sponsored By Michiana Stormwater Partnership John J. Dillon Director, LTCP Management City of South Bend.
Capital Improvement Program (CIP) Overview Nick Kanetis, P.E. June 14, 2013.
Presentation to Maxwell Place Homeowners Association 1.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
GALENA WASTEWATER TREATMENT UPGRADES Informational Presentation for the Sassafras River Association Presented by Ryan J. Rangel, PE April 23, 2015.
ACCA Legislative Conference Underground Storage Tank Compliance
Wastewater Treatment & Collection System Improvements.
Spokane River Forum 23 May 2011
Fairview Township, York County May 28, 2015
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Marie Zubatá 3. A.  Centrifugal pumps are a type pumps used to convey liquids or gases by the means of a rotating impeller, which increases the pressure.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
WVSD SANITARY SEWER REHABILITATION PROGRAM 2006 Sewer Smart Summit Presented by Peter V. Sevcik, P.E. West Valley Sanitation District Campbell, California.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
1 Discussion Points for IMA Participants – Flow Studies December 19, 2006 District of Columbia Water and Sewer Authority.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Raw Water System Flush By introducing fresh water into the cooling system, growth of sea life is reduced or eliminated keeping the raw water cooling pipes.
1 Public Hearing User Rate Adjustments April 8, 2008.
Public Information Meeting Wastewater Treatment January 26, 2016.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
 Consolidated Buffer Mitigation Rule 15A NCAC 02B.0295 January 7, 2015.
COUNCIL UPDATE – APRIL 13, 2016 Perfluorinated Compounds (PFCs)
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
LFUCG Group 1 Remedial Measures Plans September, 2011 Presentation to Lexington-Fayette Urban County Residents.
Spring 2009 Town Meeting Article 41 East Framingham Sewer Improvement Project (EFSIP) May 2009 Town of Framingham Department of Public Works "Preserving.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Highest Priority Projects from “Immediate Action” Category Immediate Action All Others.
February 26, 2013 City of Sausalito Status Update on EPA Order Compliance (and new 2012 NPDES Permit)
Welcome to American-Bath Wastewater Treatment Plant.
1. 1. What is a low pressure sewer system? These Systems convey wastewater from your home or business to the regional wastewater treatment facility. Unlike.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
Update on PI Modeling and Nitrogen Removal at Blue Plains
Comprehensive Sewer Planning Update Meeting
Kings Bluff Raw Water System Parallel Raw Water Main Project
Boatyard General Permit Stormwater System
Manchester’s CSO Program: A Look Behind and a Look Ahead
107th & 110th Avenue North Public Utilities Renewal Projects
Garrett County Public Works Utilities Division
Frank Qiao and Michael Wang
Pinole-Hercules Water Pollution Control Plant Upgrade Project
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
Parkland/Brookdale Interceptor Replacement
2018 Construction Projects $98 M
Sheryl Stephens Victor Valenzuela
Harbour Island Force Main Replacement
Presentation transcript:

SPECIAL ORDER BY CONSENT EMC SOC WQ S04-009

SOC Attachment 1: Summary of Major Line Replacement Completed DescriptionTotal Linear Footage Meadow Greens South of Maplewood (8-inch sewer replacement)850 Meadow Greens Eden Morehead High School (8-inch sewer relocation)1,410 Meadow Greens North (8-inch sewer replacement, relocation and pipe bursting)3,405 Meadow Greens North Weaver St. \ Pierce St. (8-inch sewer replacement)1,520 Meadow Greens Linden Street (8-inch sewer replacement)245 Meadow Greens West \ Pierce St.\ Southwood (8-inch sewer replacement and 12-inch sewer upsize)3,335 Dan River Western (8-inch sewer replacement)3,945 Dan River Eastern (8-inch sewer replacement)3,425 Dan River Central (8-inch sewer replacement and relocation)1,535 Covenant Branch Western (8-inch sewer replacement and relocation)3,025 Covenant Branch Eastern (8-inch sewer replacement)3,335 Mebane Street Water Line (Replacement to eliminate conflict with sewer and upsize 2-inch water line to standard 6-inch water line)635

SOC Attachment 2: Summary of Pump Station Improvements Under Construction Major ImprovementsMeadow Greens Covenant Branc h Dan River Kuder Street Replacement of existing dry pit wet pit pump arrangement with submersible pump station Rehabilitation of dry pit including replacement of vertical frame-mounted centrifugal pumps with long shafts with submersible dry pit pumps; piping modifications to place check valves in horizontal alignment; hoist improvements to provide easier pump removal; placement of two peak capacity pumps to meet standby and duty requirements Variable Frequency Drive (VFD) operation to provide greater pumping (flow) variability and eliminate old non-standard controls

SOC Replacement of float type switches with pressure transducers to control pump activity Permanent power generation unit with automatic transfer switch Ultra-sonic flow meter vault Mechanical step screen to remove debris and provide protection of pumps, valves and downstream appurtenances ** Bid Alternate (submersible grinder unit) ** Emergency bypass connection and pigging (force main cleaning) station

SOC ** Odor and Corrosion Control via liquid phase system to oxide sulfur compounds in waste stream (Pending results of hydrogen sulfide concentrations during hot weather, low flow) Bid Alternate (To be placed at Dan River and protects both Dan River and Covenant Branch since Dan River pumps to Covenant Branch) ** Non-potable water well to enhance housekeeping and maintenance Enhanced access to dry pit operating level

Attachment 3: Status of Schedule of Compliance i)Complete baseline flow monitoring studies within the Meadow Greens, Covenant Branch, and Dan River sub basins by December 31, ACHIEVED ii)Submit permit applications and all supporting materials for any necessary regulatory permits required for outfall repairs\replacements within the Meadow Greens, Covenant Branch, and Dan River sub basins by January 31, ACHIEVED

Attachment 3: Status of Schedule of Compliance con’t iii) Begin construction of outfall repairs\replacements within 120 days of receipt of all necessary permits. ACHIEVED iv) Complete construction of outfall repairs\replacements within 365 days of giving contractor “Notice to Proceed”. ACHIEVED – 1 month ahead of schedule

Attachment 3: Status of Schedule of Compliance con’t v) Complete analyses of cleaning needs\benefits for each of the three relevant force mains by May 31, Should the analyses indicate that cleaning of any sections of force main would be of substantial benefit, those sections shall be cleaned by January 31, ACHIEVED vi)Elimination of major and previously identified sources of inflow in each of the three relevant collection sub basins by June 30, ACHIEVED

Attachment 3: Status of Schedule of Compliance con’t vii.Submit permit applications and all supporting materials for any necessary regulatory permits required for additional outfall repairs\replacements within the Meadow Greens, Covenant Branch and Dan River sub basins by March 9, ACHIEVED

Attachment 3: Status of Schedule of Compliance con’t viii.Complete construction of outfall repairs\replacements within 180 days of receipt of all necessary permits. ACHIEVED ix.Complete post construction flow monitoring of the Meadow Greens, Covenant Branch and Dan River sub basins within 45 days of acceptance of outfall repairs\replacements. ACHIEVED

Attachment 3: Status of Schedule of Compliance con’t x.Submit permit applications for any necessary regulatory permits required for pump station improvements at the Meadow Greens, Covenant Branch and Dan River pump stations within 180 days of completion of gravity sewer line repairs\replacements. ACHIEVED – Approximately 1 ½ months ahead of schedule

Attachment 3: Status of Schedule of Compliance con’t xi.Begin construction of pump station improvements within 120 days of receipt of all necessary permits. All permits received by April 4, Construction, therefore, must be initiated by August 6, Contractors were issued Notice to Proceed to immediately begin work on July 28, ACHIEVED – Approximately 8 days ahead of schedule

Attachment 3: Status of Schedule of Compliance con’t xii.Complete construction of pump station improvements within 365 days of giving contractor “Notice to Proceed”. ON OR AHEAD OF SCHEDULE – Construction is anticipated to be completed by June 23, Schedule of compliance date is July 28, 2009.

Meadow Greens PS