Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
1 Tonight’s Agenda Sandy Mitchell, MBA, PMP, PMI-ACP, CSM What is a PDU? How do I earn them?
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Project Change Management
6/12/20151 Project Management Certification (PMC) Program Thomas King, MS ITPM, PMP, CAPM, ITIL July 2011
What is a project? Project Management Institute definition
The 9 Things in the PMBOK 19-Nov-08. The PMBOK “Project Management Body of Knowledge” –sum of knowledge within the profession of project management –used.
PMBOK Version 5 – What are the Changes?
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
Project Scheduling & the PMI-SP Credential
Project Management Lecture 5+6 MS Saba Sahar.
PMP® EXAM PREPARATION COURSE – DAY ONE 1 Based on PMBOK® Guide 4th Edition + Revisited August 30th of 2011 “PMI”, “PMP”, “Project Management Professional”
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Project Management: Madness or Mayhem
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
PMP® Exam Preparation Course
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Control Aspects Common to All MC Process Groups & Control Schedule
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Agenda  Purpose  Definition  Processes  Performance Reports  Quality Control  Risk Monitoring & Control  Change Requests 5.3.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Software Project Management (SPM)
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
Advanced Project Management Project Time Management Ghazala Amin.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
Project Management Body of Knowledge
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Integrated Change Control 1 MEC-8. Processing of a Change Processing of a Change 2 Assess Impact within KA Change Request Implemented Change Create a.
Communications Management
Project Management Training
The Project Plan Plan Your Work, then Work Your Plan
These slides are designed for presentation purpose only © Copyright SAIsej Consultancy Services (P) Ltd Why ??? Project Management.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
PDU Category Structure Update March 15, Effective March 1, 2011 PMI has updated the PDU category structure Who is impacted by this change? This.
Basic Project Management Process Basic Project Management Process Larry Creel July 11, 2003.
Overview of A Guide to the Project Management Body of Knowledge (PMBOK ® Guide)—Fourth Edition.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
Project Management Body of Knowledge Changes to PMBOK ® from Version 4 to Version 5 PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks.
Managing the Information Systems Project
Plan Schedule Management
4.4 Monitor and Control Project Work
Project Integration Management
Project Management and Information Security
TechStambha PMP Certification Training
Chapter 3 Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Project Management Processes
CIS12-3 IT Project Management
In Order To Understand The Body Of Knowledge
Expedite Project Updates Using a Custom Status View
Project Management Body of Knowledge
Managing Project Work, Scope, Schedules, and Cost
Chapter 2 Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Presentation transcript:

Trust & Influence

About the PMI® Practice Standards and other ways to earn PDU’s Christopher Talmont, PMP, PMI-SP April 20, 2011

About Me 6 years of experience as an instructor and consultant of project scheduling software and best practices 3 years of experience developing / instructing PMP preparation classes and other PM curriculum Strong interest in project management methodologies & technology solutions. Christopher Talmont, PMP, PMI-SP Program Management Director, Off Peak Training

New PDU Categories On March 1, 2011, the PMI® simplified the PDU categories from 18 to just 6 Each PDU now has a direct equivalency to one hour of Education or Giving Back to the PM community Some categories have some restrictions on how many PDU’s may be claimed from that category

Education Categories Category A = Education through Registered Educational Providers Category B = Education offered by university or other training providers (must be project management related)

Education Categories Category C = Self Study – PMIWDC Presentation Library – Library of PMI Global Standards – Limit of 30 PDUs per cycle

Giving Back Categories Combined Limit of 45 per cycle Category D = Authoring / Presenting publication, presentations, or training that enhance the PM Body of Knowledge Category E = Volunteering in PMI or volunteering as a PM (not for employer) Category F = Practitioning as a PM (Limit of 15 per cycle)

Education – Self Study PMIWDC Presentation Library – Go to – Log In (must have a username and password) – View ‘Members Only’ videos from past chapter events – A code should appear during the video – the code and presentation title to to get your PDU form

Education – Self Study PMBOK® Guide – Fourth Edition – Free Download with Print Capabilities Library of PMI Global Standards – Free Download without Print Capabilities – Hardcopy available for purchase through PMI Marketplace

Library of PMI Global Standards Go to PMI.org Log In Click ‘View Details’

The Practice Standard for Scheduling Expands on the PMBOK® Guide by describing best practices, tools and techniques Project Management Institute, The Practice Standard for Risk Management, Project Management Institute, Inc., (2009). Copyright and all rights reserved. Material from this publication has been reproduced with the permission of PMI.

The Schedule Model Project Management Institute – Scheduling Professional (PMI-SP®) What is a project schedule? Is it the first approved printout? Is it today’s hardcopy? Is it the.msp file or other file type from our scheduling tool? To better define the term ‘schedule’ the PMI Practice Standard for Scheduling introduces the Schedule Model

The Schedule Model Scheduling Method Defines the rules for that will be used for project scheduling: -Link Types -Constraint Types -Work Calendar requirements -Effort / Duration based scheduling -Etc. Examples include: -Critical Path Method -Critical Chain -Horse Blanket -Butcher Paper

The Schedule Model Scheduling Method Scheduling Tool A scheduling tool must be selected that follow the rules of the chosen scheduling method. Tools can be primitive such as a whiteboard or be sophisticated software such as MS Project, Primavera, or FastTrack Schedule

The Schedule Model Scheduling Method Project Information Each Project has project specific information: -Activity Names -Planned Activity Durations -Logical Dependencies -Resource Availability -Assumptions & Constraints -Project Start Date -Project Actuals

The Schedule Model Scheduling Method Scheduling Tool Scheduling Model Project Information The Schedule Model is a dynamic system that will change as the project conditions evolve. As project actuals are entered, the model can recalculate activity start and finish dates to help the project team conduct analysis and forecasting.

The Schedule Model Scheduling Method Scheduling Tool Scheduling Model Project Information Generates Output Project Schedule Each Project Schedule instance is unique and should be given a version number or date / time stamp

The Schedule Model Project Management Institute, The Practice Standard for Scheduling, Project Management Institute, Inc., (2007). Copyright and all rights reserved. Material from this publication has been reproduced with the permission of PMI.

Schedule Mission Development of the Project Management Plan Configuration Management Planning Establish Scheduling Methodology / Policy Train project team on project schedule model PM Software proficiency

Schedule Creation Scope definition Work with SME to convert scope to activity list Activity sequencing Estimate durations Resource assignments Resource leveling Baseline the schedule

Schedule Maintenance Establish reporting frequency Collect WPI (Work Performance Information) Update schedule with approved changes Maintain project history of schedule change Update resource pool information Update risk register Update schedule with project actuals

Schedule Analysis Monitor and Control the schedule against the baseline Analyze the schedule and issue change requests Understand document storage and retrieval standards Create parallel forecast schedule to analyze feasibility of proposed changes

Communication / Reporting Create project schedules using the schedule model / schedule tool Distribute standard reports in accordance with the Communications Mgmt Plan Conduct schedule review meetings

Key Concepts Schedule Model PDM (Network Diagrams) Leads / Lags Dependency Types Critical Path Critical Chain Resource Leveling Float What-If Scenario Analysis Gantt / Bar Charts EVM (SV & SPI) Forecasting Schedule Compression