DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Challenges of a Distributed Workforce Action Plan for Using eLearning to Extend Reach and Reduce Cost Presented by Caltrans and Sacramento State California.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
Module 9 Session 9.2 Visual 1 Module 9 Designing Control and Reporting Systems (Time, Cost, Resources and Scope (Performance and Quality)) Session 9.2Managing.
April 2, 2013 Longitudinal Data system Governance: Status Report Alan Phillips Deputy Director, Fiscal Affairs, Budgeting and IT Illinois Board of Higher.
Systems Analysis and Design: The Big Picture
Chapter 9 Database Planning, Design, and Administration Sungchul Hong.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
Before starting a CAP process: Pre-planning phase and process or team charter Photo: P.N. Cascada de Basaseachic - CONANP.
Construction Work Packaging
1 REQUIREMENT ENGINEERING Chapter 7. 2 REQUIREMENT ENGINEERING Definition Establishing what the customer requires from a software system. OR It helps.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Information System Design IT60105 Lecture 21 Staff Organization, Risk Management and Software Configuration Management.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Software Engineering Management Lecture 1 The Software Process.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
U.S. Department of Agriculture eGovernment Program Design Approach for usda.gov April 2003.
Developing Plans and Procedures
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
CASS, Marsfield Phil Diamond 4 October 2011 SKA Pre-Construction Phase: Where we are, and what we’re trying to achieve ?
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
Systems Development Life Cycle
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
1 SCR756 – Enhancements to the MarkeTrak application –Fondly called - MarkeTrak Phase 3 –ERCOT CEO determined that SCR756 is not necessary prior to the.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
University of Southern California Center for Systems and Software Engineering RDCR ARB CS 577b Software Engineering II Supannika Koolmanojwong.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Construction Work Packaging
Director’s Progress Review Closeout Meeting
Software Engineering Management
Fundamentals of Information Systems, Sixth Edition
Administration of a FIDIC Contract - Pre-Contract Phase -
S4 will be a “big” Collaboration:
BSA 376 Competitive Success/snaptutorial.com
BSA 376 Education for Service/snaptutorial.com
Budget, Schedule, Contingency
CLINICAL INFORMATION SYSTEM
Director’s Progress Review Closeout Meeting
EVLA M/C Software PDR, 14 May 2002
EVLA Computing Reorganization
Gustaaf van Moorsel September 9, 2003
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Mark McKinnon EVLA Project Manager
Background Information P.Napier
Proposals & Project Specifications
CoDR Scope Definition, Objectives & Agenda Jodrell Bank
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010

The following discussion will examine the management structure which will govern all phases of the DVA-1 project. Involvement of the NRAO in the DVA-1 project is contingent upon a signed Letter of Intent June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 2

Project Structure Serial approach in three phases – Each previous phase must be completed before moving to the next phase – Resources for the next phase must be identified and confirmed prior to embarkment June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 3

Project Structure Phase I – Establish antenna properties and specifications – Outline a viable program to manufacture/procure the antenna and install it at the test site – Establish a notional testing program – Complete a Conceptual Design Review US SKA Consortium Meeting - DVA-1 Project Management Proposal 4June 3-4, 2010

Project Structure Phase II – Complete the detailed design and cost analysis for the prototype antenna, including the pedestal – Specify and determine the cost of the test receiver, back end electronics, and computer systems – Determine the scope and cost of the necessary software – Refine the testing program introduced in Phase I – Establish the personal loading for all work elements (scope and budget) – Complete an External Design Review June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 5

Project Structure Phase III – Develop/Manufacture/Procure antenna and all supporting equipment and software – Install antenna at NRAO’s EVLA test site – Complete agreed-to test program, deliver summary to stakeholders June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 6

Project Schedule Three year effort – Starting with the signed Letter of Intent (LOI), phases will be completed in 1 year each – Schedule delays which result in exceeding the three year total for the project will require agreement of the LOI parties June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 7

DVA-1 Management June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 8

DVA-1 Management DVA-1 Council One representative from each Letter of Intent party Determines the sufficiency of the scope, cost, and schedule for each project phase Chairman to be elected by board members Managing Board One representative from each set of phase executives Oversees the execution of each DVA-1 project phase, including budget and schedule Chairman to be elected by board members for each phase June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 9

DVA-1 Management Project Manager Designated by Managing Board to execute DVA-1 Authority to spend and direct project resources Will insure the timely completion and success of each project phase System Integration Engineer Technical authority for the DVA-1 project Develop and execute a system integration plan for DVA-1 Coordinate and supervise teams which are responsible for subsystem designs June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 10

Electronic Subsystem June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 11 * Includes Software for ephemerides pointing, data formatting, & analysis software

Antenna Subsystem June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 12 * Includes nutator, feed indexer (TBD) ** Receives central computer signals and M&C

Construction & Site Subsystem June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 13 * Pad, power, fiber, environmental considerations, …

Data Retrieval and Analysis June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 14

Way Forward Sign LOI Revise org chart, establish personnel Establish work elements and schedule Establish DVA-1 specifications and architecture Draft a test plan Draft a CoDR plan June 3-4, 2010 US SKA Consortium Meeting - DVA-1 Project Management Proposal 15