LHC Collimator Survey Train Concept / Development / Status Patrick Bestmann CERN BE/ABP/SU IWAA2010 14/09/2010 Remote Controlled Measurements in the LHC.

Slides:



Advertisements
Similar presentations
Laser Speckle Extensometer ME 53
Advertisements

Solomon William KAMUGASA
Micro-triangulation for high accuracy short range measurements of dynamic objects Vasileios Vlachakis 1 st PACMAN Workshop February 2015 CERN, Geneva,
Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Camera Models A camera is a mapping between the 3D world and a 2D image The principal camera of interest is central projection.
THE ALIGNMENT OF THE LHC DURING THE SHUT-DOWN D. Missiaen.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
X-Ray Survey of The ATLAS SCT. The ATLAS Semi-Conductor Tracker.
The Linear Collider Alignment and Survey (LiCAS) Project Richard Bingham*, Edward Botcherby*, Paul Coe*, Grzegorz Grzelak*, Ankush Mitra*, Johannes Prenting.
Warsaw University LiCAS Linear Collider Alignment & Survey IWAA08, G. Moss 1 The LiCAS LSM System First measurements from the Laser Straightness.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
Collimation Remote Handling Highlights from work for collimation remote handling and remote survey. Plans Keith Kershaw EN-HE 14 June 2011.
Stereoscopic PIV.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
The Laser Reference Line Method and its Comparison to a Total Station in an ATLAS like Configuration. JINR: V. Batusov, J. Budagov, M. Lyablin CERN: J-Ch.
H. SCHMICKLER Alignment challenges for a future linear collider.
S D Laser Scanning of Acropolis of ATHENS. 3D scanning of the Wall and the Rock of Acropolis Athens and 3D model creation.
Manufacturing Engineering Department Lecture 9 – Automated Inspection
Basic Principles of Coordinate Measuring machines
AUTOMATED INSPECTION (Part 2).
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
LASER AND ADVANCES IN METROLOGY
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
Collimation Working Group #127 Collimator Alignment Control IR 7 and 3 Patrick Bestmann06/06/2011.
Geometrical Measurements of the TEC Elements Goals internal survey external survey LINK calibration Means 3D CMM Cosmics Geodesy Procedure Conclusions.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Status of RICH mechanical design at PNPI E.Vznuzdaev for PNPI group: V.Dobyrn, A.Khanzadeev, E.Kormin, V.Lebedev, N.Miftakhov, V.Polyakov, V.Samsonov,
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Alignment Tools Used To Locate A Wire And A Laser Beam In The VISA Undulator Project Wire Finder CALIBRATION A special fixture was constructed to calibrate.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
Fork Calibration Barrel Muon Alignment 9 April 2003, Z. Szillási Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 Calibration.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Mapping the Future of Autonomous Vehicles. What do these autonomous vehicles have in common?
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
Remote Measurement and Alignment Applications for Survey and Alignment P. Bestmann for BE/ABP/SU
ALIGNMENT OF THE NEW TRIPLETS
Last results from tests
Alignment systems in ATLAS: Monitoring of the bedplates
on behalf of the CLIC active pre-alignment team
Recent developments on micro-triangulation
IR Detector - Test cryostat : Machining
Preparing the SPS complex alignment for future LHC runs
Planned activities on collimator for LS1
Towards a common mechanical interface
Understanding Imaging
The Pixel Hybrid Photon Detectors of the LHCb RICH
Status of energy deposition studies IR7
Maps one figure onto another figure in a plane.
The high precision photogrammetry application R&D in CEPC
Presentation transcript:

LHC Collimator Survey Train Concept / Development / Status Patrick Bestmann CERN BE/ABP/SU IWAA /09/2010 Remote Controlled Measurements in the LHC

Overview 1 Motivation Task Definition 2 The Train The Concept 3 Sensor Systems Calculations 4 Operation Status

 Remanent dose rate map between D4 and Q5 after 180 days of continious operation with one month of cooling time Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

 Significant activation of material by the beam cleaning process in Point 3 and 7  High Dose rates for peronnel in Place (4mSv/h)  500m of Beamline concerned at Point 7  26 Quadrupoles and 37 Collimators  Conventional measurements ~90h  Control of the Collimator Alignment using a remote controlled system Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

Task definition Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status  Control of the collimator alignment in vertical and horizontal direction  Relative to the neigbouring quadrupoles  Requested precision 0.2 mm  Respecting the ALARA principle (As Low As Reasonably Achievable)

 How to bring the equipment in place?  Train based on the modular TIM concept  Train for visual inspections  Traction Module  Battery Module  Sensor Module  Control Module  The train is controlled either by the user Interface or the measurement program „TIM“ T rain I nspection M onorail Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

„TIM“ T rain I nspection M onorail Sensor unit Control unit Battery unit Traction unit Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

 Digital close range photogrammetry  Fast and non contact measurement of the activated collimators  Wire offset measurements to detect train position and link the different aquisition volumes.  Reliable straight reference over long distances  Precise model for the wire sag is needed Concept Quad Collimators Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

Concept Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Cameras Targets Wire Sensor Collimator Quad

Inclination sensor Targets External lights Reference Pin Wire Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Concept

Tunnel Installation Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status  5 overlapping wires  10 pillars  2x 111 m  2x 85 m  1x 146 m

 AEROEL XLS35-XY laser micrometer as wire measurement system  Open sensor configuration  Large field of view 35mm  Commercial on the market  AICON MoveInspect HR Photogrammetric system  WYLER Zerotronic Inclination Sensors Sensors Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

 Optical Laser Micrometer  Measurement of dark/light transistions  Relative position of 2 wires to the reference pin  200Hz aquisition frequency  Linearity of ±2.5µm  Repeatability of ±2µm XLS-35 Micrometer Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

Photogrammetric System MoveInspect HR  Commercial Photogrammetric system AICON MoveInspect HR  4 AVT Marlin F-201B Cameras in industrial housing  Syncbox  Calibration Panel  MoveInspect HR software  Custom modifications Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

 Single shot synchronised aquisition  Automatic image measurement and calculations  We obtain a set of 3D coordinates with identified point groups for collimator and wire sensor systems  No simultaneous calibration; adjusted intersections Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status Photogrammetric System

Targets  Retro targets are sensitive to radiation  Use of non retro targets  Production of special aluminium targets  whole body made of black matt aluminium  with light grey aluminium insert Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

Calculations  3 different coordiante systems  Left arm with measured wire  Right arm with measured wire  Photogrammetric system with arms and collimator  7P transformations of the arm systems into the photo system  Axis alignment to the wire using 3 translations and 2 rotations  Rotation of the y axis (wire axis) using the measured inclination of the two arms Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

Systems Camera System Arm System Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

 Results are 3D coodinates for each collimator and quadrupole in following coordinate system:  Aligned with the inclined wire  Z axis in a vertical plane  Generating LGC++ file  using the x coordinates as horizontal offsets  using the z coordinates as vertical distances (reduced by the slope and the wire sag)  Online LGC++ calculation and comparison with theoretical values Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

Operation  Autonomous system after the startup procedure  Startup; Calibration; Sequence definition  Controlled by the LabView Software  Sequencer running on the train  Remote Panel informing the operator Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status

 Sensorsystems are running  All Subroutines are running  Tunnelinstallation completed  Finalising Software  Finalising Hardware configuration  Tests..... Motivation Task Definition The Train The Concept Sensor Systems Calculations Operation Status