Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) QTC Instruments: HP4274A (LCR), K6517 (electrometer), HP6614C (voltage supply), K595 (quasistatic.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

HPK L1 teststructures HPK L1 half moon teststructure corresponding to main chips 6,7 Results on  Diode C-V  Coupling capacitors  polysilicon arrays.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Quality Assurance of Silicon Strip Detectors and Monitoring of Manufacturing Process Thomas Bergauer Institute f. High Energy Physics HEPHY, Vienna SiLC.
IAP-PAI 25/05/20051 CMS Si Rad. Hardness Introduction Damage in Si Neutron tests => Beam => Irrad. Setup.
Silicon Preshower for the CMS: BARC Participation
January 22, Run IIB Silicon workshop Purdue University Bortoletto Daniela, Bolla Gino, Canepa Anadi Hamamatsu testing I-V characteristics up to 1000V.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
Irradiation Workshop KarlsruheA. Furgeri 1 Irradiation in Karlsruhe The Karlsruhe-Probestations Procedure of Irradiation Results Future annealing.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
Frank Hartmann Module Construction Meeting1 Analysis on TEC Expressline II modules Two different topics: Strip defects (3 modules) Global IV (2.
Sensor meetingF. Hartmann 1 Status report St & HPK plus add. Scratch tests. IEKP – University of Karlsruhe Frank Hartmann.
Workshop on CMS irradiation sensor Qualification&Assurance 1 Final set of measurement for the irradiation quality assurance. What test do we need? EFFICIENT.
Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri.
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
Test Results Highlighted Material Batches tested 6WA –263(1) 230(1) 265(2) 272(1) 273(3) (3) 305(1) (6) (2) 6WB –278(1) 279(9) 282.
First Proton Irradiation of CMS Sensors W. de Boer, A. Dierlamm, A. Furgeri, E. Grigoriev, F. Hartmann, F. Hauler, L. Jungermann, Ch. Piasecki.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Frank Hartmann --- Karlsruhe 2 nd bond test 2nd bond test pieces received from institutes sent in their 2nbond sample Torino, Wien, Karlsruhe, FNAL,
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester,
St Malo, 13 th April 2002Václav Vrba, Institute of Physics, AS CR 1 Václav Vrba Institute of Physics, AS CR, Prague Silicon pad sensors for W-Si ECal.
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, out of 23 Status update and Test results for Run2b Si sensors at KSU Sergey.
Christina Hägemann,UNM Sensor Testing at University of New Mexico C. Hägemann, M. Hoeferkamp, D. Fields, A. Zimmerman, M. Malik VTX Meeting 03 June 2005.
Frank Lehner U Zurich Characterization of inner layer sensors DØ Inner Layer Sensor Production Readiness Review FNAL, 8/8/2003 M. Demarteau, R. Demina,
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
1 Plans of Vienna SLHC Proposal Workshop 20. February 2008.
Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University.
Quality Test of L1 sensors HPK 10 sensors –Tested all, 6 sent to Fermilab – Test structures, HPK 133 L00 CDF ELMA 9 sensors –Tested 6 of 9.
Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Status of Process Qualification Centers Florence, Strasbourg, Vienna.
CMS Sensormeeting : Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) Mechanical Assembly ready Instruments: LCR, Electrometer, PS, Quasistatic.
2004/09/07 Junkichi Asai (RBRC) (Kieran Boyle (SBU))
DB/DAQ – to implement: …. still working on direct connection with Labview set-up obtain list of batches from DB get list of SSD in selected batch from.
QA Workshop at CERN 3-4 November Hamamatsu silicon detectors for high energy physics experiments Kazuhisa Yamamura*, Shintaro Kamada.
Examples and disciptions for measurements On pixel and strip sensors.
Matthias Bergholz DESY Zeuthen 1 Mpix Sensors.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
Heavy ion irradiation on silicon strip sensors for GLAST & Radiation hardening of silicon strip sensors S.Yoshida, K.Yamanaka, T.Ohsugi, H.Masuda T.Mizuno,
Status of Hamamatsu Silicon Sensors K. Hara (Univ of Tsukuba) Delivery leakage current at 150V & 350V number of defect channels wafer thickness & full.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
N. Zorzi Trento, Feb 28 – Mar 1, 2005 Workshop on p-type detectors Characterization of n-on-p devices fabricated at ITC-irst Nicola Zorzi ITC-irst - Trento.
1 Device Simulations & Hardware Developments for CBM STS Sudeep Chatterji CBM Group GSI Helmholtz Centre for Heavy Ion Research CBM Collaboration Meeting,
18 March 2009 Thomas Bergauer Prototype batch of DSSD from commercial vendors & Proposal for SVD Layout HEPHY Vienna.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
IFR Praha 2004, 16 th April 2004Václav Vrba, Institute of Physics, AS CR 1 Václav Vrba Institute of Physics, AS CR, Prague Silicon sensors status.
Paul Dolejschi Progress of Interstrip Measurements on DSSDs SVD.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
Production Database Apollo Go, NCU Taiwan Preshower Silicon PRR July 5, 2001.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Paul Dolejschi Characterisation of DSSD interstrip parameters BELLE II SVD-PXD Meeting.
EUDET FP7 brainstorm EUDET-JRA2 Jan Timmermans. My personal opinion…. I would be in favour of waiting till next call Because “grand” particle physics.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
IH2655 Seminar January 26, 2016 Electrical Characterization,B. Gunnar Malm
Static Surface Charges on Differently Passivated Silicon Strip Sensors Axel König, HEPHY11 th Trento Workshop, LPNHE Paris.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
UTH-65A VER. CAUTIONS ! PLEASE USE THE OUTLET PREPARED BY A QUALIFIED SERVICEMAN AND MUST CONFIRM IT BEFORE APPLY[SING AN ELECTRIC CURRENT.
Instrumentation & Root Mean Square Voltage
Karlsruhe probe equipment and QA proposals/expertise
Irradiation and annealing study of 3D p-type strip detectors
Bidder’s conference – 21st May 2013
Update of US Testing Status
IEKP - Universität Karlsruhe (TH)
IEKP - Universität Karlsruhe (TH)
Presentation transcript:

Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) QTC Instruments: HP4274A (LCR), K6517 (electrometer), HP6614C (voltage supply), K595 (quasistatic CVmeter) Status: Operational (used to measure Hamamatsu) Software (user friendly and some error protections) Probestation 2: 6“ (200mm * 100mm + 15mm Z) IQC Instruments: LCR, electrometer, voltage supply Status: Operational Misc: Homemade relay system (17 channels each) Optical Inspction: Zeiss CMM (500*500*500) Res.: 1  m (Z~5  m) Hardware setup

Chuck

Probestation

Error estimation 1000 measurement runs on one strip (ST teststructure) ParameterMean  MinMax Rpoly (M  ) 1,0640, Leakage current (pA) 62,12,259,064,0 Coupling capacitance (pF) 108,30,78106,13108,57

Software – Front panel Testing time ~ 2h

Probing marks Hamamatsu Karlsruhe

Pick up tool

Packaging (Hamamatsu) Sensor Teststructures Sandwich packaging in envelope Bad to handle Optical inspection  HANDLING  against specification Takes time Air cusion effect while placing  gliding

Packaging 2 (ST) Optical inspection  very good Easy to take out All 4 TS available

Optical survey and dimensional measurements

Check Sheet:

Pictures 25  m

More pictures Scratchpad used RpolyAdd DC pad 3 AC pads

Electrical characterization of sensors Rpoly with 10VRpoly with 2V Changes in measurement with respect to specs

Electrical characterization of sensors Summary

Electrical characterization of sensors CV & IV

Electrical characterization of sensors Rpoly

Electrical characterization of sensors coupling capacitance

Electrical characterization of sensors leakage current

Comparison of our test results with industry results (based on 5 sensor of 8 ) IV even lower than company measurement CV perfect agreement Some Rpoly higher than company measurement (but company only measured 1 per batch or even TS only) No single strip fault (agreement) (neglect Rpoly)

Relevant problems Nothing Serious V depletion not calculated Improvements: Automatic web publishing (ready 50%) Implement Pattern recognition

Optical survey of ST prototype Pinhole or bad coupling capacity No strange electrical behavior

Optical survey of ST prototype 2 Z (  m) Bowl shape! Asymmetric cut! Global size OK!

Pads

Electrical Survey Very high total leakage current Depletion voltage fine One region (7 strip) with a very high leakage current Some coupling capacitors out of specs