EU 2nd Year Review – 04 Feb. 2003 – WP10 status report – n° 1 WP10 Status Report Vincent Breton (WP10 manager) Presentation address.

Slides:



Advertisements
Similar presentations
DataGrid is a project funded by the European Commission under contract IST WP2 – R2.1 Overview of WP2 middleware as present in EDG 2.1 release.
Advertisements

Plateforme de Calcul pour les Sciences du Vivant SRB & gLite V. Breton.
V. Breton, Lyon BBE, September 2002 WP10 Status. V. Breton, Lyon BBE, September 2002 WP10 goals between now and the end of the year Deploy the applications.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
11 Decembre 2000V. Breton Milan WP6 DataGRID meeting Biological applications in testbed 0 Evaluate GRID added value for handling biological data –What.
Cracow Grid Workshop, November 5-6, 2001 Towards the CrossGrid Architecture Marian Bubak, Marek Garbacz, Maciej Malawski, and Katarzyna Zając.
Swedish participation in DataGrid and NorduGrid Paula Eerola SWEGRID meeting,
EGEE is proposed as a project funded by the European Union under contract IST The EGEE International Grid Infrastructure and the Digital Divide.
The CrossGrid project Juha Alatalo Timo Koivusalo.
DataGrid Kimmo Soikkeli Ilkka Sormunen. What is DataGrid? DataGrid is a project that aims to enable access to geographically distributed computing power.
Application Use Cases NIKHEF, Amsterdam, December 12, 13.
Enabling Grids for E-sciencE Medical image processing web portal : Requirements analysis. An almost end user point of view … H. Benoit-Cattin,
EU 2nd Year Review – Jan – WP9 WP9 Earth Observation Applications Demonstration Pedro Goncalves :
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC WP2+5: Data and Storage Management.
EDG Application The European DataGrid Project Team
EGEE (EU IST project) – Networking Activities 4: biomedical applications NA4 Biomedical Activities Johan Montagnat First EGEE Meeting Cork,
GRACE Project IST EGAAP meeting – Den Haag, 25/11/2004 Giuseppe Sisto – Telecom Italia Lab.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
A DΙgital Library Infrastructure on Grid EΝabled Technology ETICS Usage in DILIGENT Pedro Andrade
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
QCDGrid Progress James Perry, Andrew Jackson, Stephen Booth, Lorna Smith EPCC, The University Of Edinburgh.
From GEANT to Grid empowered Research Infrastructures ANTONELLA KARLSON DG INFSO Research Infrastructures Grids Information Day 25 March 2003 From GEANT.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
DataGrid is a project funded by the European Union VisualJob Demonstation EDG 1.4.x 2003 The EU DataGrid How the use of distributed resources can help.
TESTBED FOR FUTURE INTERNET SERVICES TEFIS at the EU-Canada Future Internet Workshop, March Annika Sällström – Botnia Living Lab at Centre for.
Grid Workload Management Massimo Sgaravatto INFN Padova.
WP9 – Earth Observation Applications – n° 1 WP9 report to Plenary ESA, KNMI, IPSL Presented by M. Petitdidier, IPSL DataGrid Plenary Session 5 th Project.
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
INFSO-RI Enabling Grids for E-sciencE Biomedical applications V. Breton, CNRS-IN2P3.
V. Breton, Budapest, September 2002 WP10 status V. Breton DataGrid conference.
EGEE is a project funded by the European Union under contract IST Middleware Planning for LCG/EGEE Bob Jones EGEE Technical Director e-Science.
WP9 – Earth Observation Applications – n° 1 Planning for EO Application Deployment DataGrid WP9 EO Applications Parallel Session 5 th Project Conference.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Project Status Fabrizio Gagliardi.
Owen SyngeTitle of TalkSlide 1 Storage Management Owen Synge – Developer, Packager, and first line support to System Administrators. Talks Scope –GridPP.
May http://cern.ch/hep-proj-grid-fabric1 EU DataGrid WP4 Large-Scale Cluster Computing Workshop FNAL, May Olof Bärring, CERN.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
UKQCD Grid Status Report GridPP 13 th Collaboration Meeting Durham, 4th—6th July 2005 Dr George Beckett Project Manager, EPCC +44.
Future of grids V. Breton CNRS. EGEE training, CERN, May 19th Table of contents Introduction Future of infrastructures : from networks to e-
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE08 conference, Istambul Biomed community meeting V. Breton, CNRS.
EDG Applications The European DataGrid Project Team
MEDIGRID project, DataGrid FR meeting, April 18, 2002, Johan Montagnat, WP10 ACI GRID 2002 MEDIGRID: high performance medical image processing on a computational.
B i o i n f o r m a t i c s / B i o m e d i c a l A p p l i c a t i o n s i n E E L A Mexico, D.F., october 22 – 26, e – s c i e n c e M e x i c.
EC Review – 01/03/2002 – WP9 – Earth Observation Applications – n° 1 WP9 Earth Observation Applications 1st Annual Review Report to the EU ESA, KNMI, IPSL,
A demonstrator for IST 2001 G. Romier UREC Lyon. What is IST2001? the IST projects Exhibition is dedicated to displaying the results of projects within.
INFSO-RI Enabling Grids for E-sciencE EGEE-2 NA4 Biomed Bioinformatics in CNRS Christophe Blanchet Institute of Biology and Chemistry.
DataGrid is a project funded by the European Commission under contract IST WP10 Biomedical Applications Vincent Breton (CNRS)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE08 conference, Istambul Life sciences cluster perspective on EGI V. Breton, CNRS On.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
High Risk 1. Ensure productive use of GRID computing through participation of biologists to shape the development of the GRID. 2. Develop user-friendly.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
EU 2nd Year Review – 04 Feb – WP10 status report – n° 1 WP10 Status Report Vincent Breton (WP10 manager) Presentation address.
INFSO-RI Enabling Grids for E-sciencE NA4 status and issues.
CERN 1 DataGrid Architecture Group Bob Jones CERN.
Bob Jones – Project Architecture - 1 March n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
INFSO-RI Enabling Grids for E-sciencE EGEE Review Transition from EGEE-II to EGEE- III Biomed cluster V. Breton – J. Montagnat.
WP10 Goals and accomplishments from WP10 point of view J. Montagnat, CNRS, CREATIS V. Breton, CNRS/IN2P3 DataGrid Biomedical Work Package.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
DataGrid France 12 Feb – WP9 – n° 1 WP9 Earth Observation Applications.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
Bob Jones EGEE Technical Director
EGEE Middleware Activities Overview
EO Applications Parallel Session
WP10 Biomedical Applications
Long-term Grid Sustainability
Biomedical grid initiatives in Europe
Presentation transcript:

EU 2nd Year Review – 04 Feb – WP10 status report – n° 1 WP10 Status Report Vincent Breton (WP10 manager) Presentation address

EU 2nd Year Review – 04 Feb – WP10 status report – n° 2 DataGrid, prototype of a biomedical grid u DataGrid has three ambitious goals : n Develop a middleware n Deploy a testbed n Have large scale applications running on this testbed u The biomedical work package faces three challenges n Make the middleware meet biomedical specific requirements n Deploy grid nodes in biomedical laboratories n Run biomedical applications

EU 2nd Year Review – 04 Feb – WP10 status report – n° 3 Conclusion of last year review u Key achievements n We have shown the relevance of the grid concept for biomedical applications (see demo) n We have established a fruitful dialog with s Biology and medical imaging (25 laboratories involved) s The other applications and middleware work packages of DataGrid n The group has found cohesion and coherence despite the various backgrounds of the actors (biologists, computer scientists, physicists) u Key challenges for the lifetime of the DataGrid project n Deploy a true biomedical testbed involving genomics, bio-informatics and medical imaging laboratories n Run the applications described in D10.2 to demonstrate the use of a grid in genomics and medical imaging

EU 2nd Year Review – 04 Feb – WP10 status report – n° 4 Difficulties in addressing the key challenges u Delay in testbed1 release (Aug. 2002) n Complexity of deployment of a biomedical testbed u Scalability/Robustness problems on testbed1 n Replica Manager scalability issues n Scalability issues when stressing the Res. Broker n Testbed instability related to info. service u Need to make a very large scale test this year n Competition for testbed resources - HEP applications are often the highest priority u Support for MPI-based job submission is vital for some applications u Programmable APIs to access middleware services u Support by the Storage Element for medical databases u Ports to RH7 and 8 needed Strong expectations on EDG 2.0 components

EU 2nd Year Review – 04 Feb – WP10 status report – n° 5 Successes addressing the key challenges u Four groups able to deploy their applications on EDG testbed s Implementation of a web portal for phylogenetics s Comparison of genomes of parasite and bacteria s Management of medical images (see WP10’s demo tomorrow) s Search for primers u Interaction with the middleware packages s Feedback on our job submission problems s Discussion on metadata management (spitfire) s On-going discussion through the architecture group (ATF) on biomedical data integration and related security issues

EU 2nd Year Review – 04 Feb – WP10 status report – n° 6 Status of WP10 applications u Bio-informatics n Phylogenetics : BBE Lyon (T. Sylvestre) n Search for primers : Centrale Paris (K. Kurata) n Statistical genetics : CNG Evry (N. Margetic) n Bio-informatics web portal : IBCP (C. Blanchet) n Parasitology : LBP Clermont, Univ B. Pascal (N. Jacq) n Data-mining on DNA chips : Karolinska (R. Médina, R. Martinez) n Geometrical protein comparison : Univ. Padova (C. Ferrari) u Medical imaging n MR image simulation : CREATIS (H. Benoit-Cattin) n Medical data and metadata management : CREATIS (J. Montagnat) n Mammographies analysis ERIC/Lyon 2 (S. Miguet, T. Tweed) n Simulation platform for PET/SPECT based on Geant4 : GATE collaboration (L. Maigne) Applications deployed Applications tested on EDG Applications under preparation

EU 2nd Year Review – 04 Feb – WP10 status report – n° 7 Addressing the key challenges… u More successes… n More than 15 WP10 users trained n Several system administrators initiated to the installation procedure of a grid node n First evaluation of performance Credit : T. Silvestre BBE complexity Elapsed time (mn) Phylogenetics (fastDNAm algorithm)

EU 2nd Year Review – 04 Feb – WP10 status report – n° 8 A major success in 2002 : dissemination u Active participation to the creation of the HealthGrid cluster of EC projects u WP10 actively involved in the European HealthGrid conference (co-organized by CNRS, CERN, EMBnet and the help of the European Community) in Lyon (January 2003). More than 200 participants. u Three demos shown at HealthGrid, more than 10 papers submitted (4 accepted) to workshops and conferences

EU 2nd Year Review – 04 Feb – WP10 status report – n° 9 Laboratories involved in WP10 … Dublin Hinxton(EBI) Montpellier Moscow Kosice Lyon Uppsala Stockholm (Karolinska) Madrid(CNB) Clermont Lausanne(EPFL,SIB) CERN Evry(CNG) Padova Saclay (CEA) Laboratories testing EDG Middleware Other labs.

EU 2nd Year Review – 04 Feb – WP10 status report – n° 10 Pending problems u No EDG nodes installed in biomedical laboratories n Delays in EDG 1.2 middleware releases n Middleware is RH6.2 based, RH7.3 happening now, no RH8 release yet foreseen n Complexity of the configuration, despite a tutorial for system engineers n User/site administration support is needed n WP10 human resources limited to 2 funded engineers u Need more synergy between the applications working groups n It is time to revive a cross-application workgroup

EU 2nd Year Review – 04 Feb – WP10 status report – n° 11 Work program for 2003 u March 2003 : deliverable D10.3 « Report on the first bio- testbed release » u Production (large scale) test in phylogenetics u Deployment of all 7 applications described in D10.2. Applications still to be deployed : n data mining on DNA chips (MPI support needed) n GPSA : web portal for protein structure analysis (EDG interface) n MRI simulator (MPI support needed) u Installation of EDG nodes in biomedical laboratories n We must be able to deploy and maintain our own production platform n To make the community aware of the need for a computing infrastructure n First « WP10 » node expected at LPC Clermont-Ferrand in February