CSC,17.4.2007, A. Lombardi. 1 Status of HIPPI – April 2007 Maurizio Vretenar Alessandra Lombardi.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
CSC, Status of HIPPI – September 2006 Maurizio Vretenar Alessandra Lombardi.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Linac4 Status C. Carli presenting (a slightly adopted selection of) slides prepared by and on behalf of M. Vretenar Looking from this point and with a.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Alain FRANCE for the ESS RFQ Team at CEA Saclay
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
RF Cavity Design with Superfish
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Alexander Aleksandrov Oak Ridge National Laboratory
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
CARE 05, CERN, HIPPI Activities -HIPPI Structure Highlights -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.
CARE 06, Frascati, HIPPI in HIPPI Objectives Activities -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.
Linac4 Status 1 M. Vretenar sLHC public event
MP - HIPPI General meeting, Abingdon October 28-30, Side Coupled Linac Design at CERN Side Coupled Linac Design at CERN M. Pasini, Abingdon September.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Xx-xx-2010, tanks arrive from Snezhinsk to Novosibirsk A.Tribendis, July 19-21, 2010, Snezhinsk 1. Check cavity dimensions on a CMM 2. Assemble and measure.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
WP4-CHOPPER coordinated by A. Lombardi HIPPI yearly meeting, sep28-sep COSENERS HOUSE- Abington Hosted by CCLRC.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
CSC, Status of HIPPI – September 2008 M. Vretenar, A. Lombardi.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
GSI Helmholtzzentrum für Schwerionenforschung GmbH FAIR Proton Linac Status and plans with France GSI Helmholtzzentrum für Schwerionenforschung GmbH
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R
The CERN Linac4 history, performance, perspectives
WP5 Elliptical cavities
Linac4 M. Vretenar for the Linac4 design team
Complementary ISTC Projects #3888, 3889p
Second SPL Collaboration Meeting, Vancouver May 2009
Status of the Front End Test Stand April 2007.
LINAC4 commissioning plans etc.
Collective Effects and Beam Measurements in Particle Accelerators
Advanced Research Electron Accelerator Laboratory
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
The SPL-based Proton Driver at CERN
RF introduction Anders Sunesson RF group leader
Presentation transcript:

CSC, , A. Lombardi. 1 Status of HIPPI – April 2007 Maurizio Vretenar Alessandra Lombardi

CSC, , A. Lombardi. 2 Contents  News since September 2006 HIPPI06 and referee comments  WP highlights  Meetings, deliverables  Outlook for 2007

CSC, , A. Lombardi. 3 HIPPI06 Meeting in Jülich   JRA Meeting on September 27th – 29th in Julich.   35 registered participants from all contributing institutes + 1 or 2 external.   All 3 members of the ESAC: J. Stovall (LANL-SNS), Y. Yamazaki (KEK-JPARC), A. Pisent (LNL).   24 WP talks   4 general talks Overview of HIPPI prototypes LINAC4 and FAIR Comparison NC/SC structures above 90 MeV

CSC, , A. Lombardi. 4 HIPPI06-referee comments  Overall very positive  Worries/recommendations Delays (chopper testing and ISTC DTL) More exchange WP3 WP5 EM interference More sophisticated treatment of expected beam loss as a function of error tolerances

CSC, , A. Lombardi. 5 Hardware by WP  WP2 (normal conducting cavities) : DTL power coupler H-DTL SCL (cold model) CCDTL (2 prototypes)  WP3 (super conducting cavities) : Cavity A and B (elliptical cavities) Spoke cavities 700 MHz 352 MHz 2-gap and multi-gap CH resonator 700 MHz RF test stand

CSC, , A. Lombardi. 6 WP2 achievements  All the 4 milestones achieved, 2 deliverables due for December 06 are delayed by a few months.  4 prototypes of accelerating structures are completed (3 are being tested), 1 more is under construction, a DTL coupler is ready: The CH model built and tested at IAP Frankfurt The CCDTL prototype the day of delivery at CERN (Jan. 07), presently under testing Cells of the SCL prototype built at LPSC Grenoble, presently under test

CSC, , A. Lombardi. 7 BINP, Novosibirsk RFNC-VNIITF, Snezhinsk CCDTL prototype built under the ISTC contract 2875: 1 acc. tank + coupling cell + 1 acc. tank + coupling half-cell VNIITF: Half-tank shells and coupling cells (copper plated inside) Support frame VNIITF, Snezhinsk   BINP, Novosibirsk   CERN, Geneva Mech. & vacuum checks (VNIITF, BINP, CERN)   Low-level rf measurements (BINP, CERN)   High power tests (CERN) CCDTL module section during frequency tuning BINP: DTs, fixed tuners and waveguide External water cooling circuits Final assembly DT installation Copper plated parts VNIITF BINP Who did what?

CSC, , A. Lombardi. 8 The field profile in the accelerating gaps was measured using bead pulling. Field flatness over the two tanks is within 1.5%.

CSC, , A. Lombardi. 9 Comparison of the field profile measurements done at CERN and at BINP (green)

CSC, , A. Lombardi. 10 WP3 achievements  All the 6 milestones have been achieved, the only deliverable due by mid term (cavity B ready) has been achieved end of March 07.  All components for the test stand at CEA Saclay have been delivered, installation is in progress  Prototype superconducting cavities are ready or under construction: Cavity B being prepared for tests at CEA Saclay Design of the 3-spoke cavity (FZJ-IPN) being built at FZJ. High-power RF components for the test stand at Saclay

CSC, , A. Lombardi. 11 Elliptical Cavity B is now at Saclay

CSC, , A. Lombardi kV power supply HV Pulse power supply 1 MW – 704 MHz Klystron Main components of the RF power test stand are now at Saclay 704 MHz Circulator, RF loads and bi-directionnal couplers

CSC, , A. Lombardi. 13 Klystron 700 MHz 1MW IOT 80kW Circulator Load HV Pulse Generator Load Klystron 1300 MHz 2MW 110 kV power supply Power supply View of the complete RF power platform CryHoLab RF power platform Next 2 months : - wave guide connection -Installation of the water-cooling system Commisionning of the RF power test stand in June 07

CSC, , A. Lombardi. 14 Hardware by WP (continued)  WP4 (chopping) Chopper structures (A,B) Chopper drivers (A,B) Dump  WP5 (beam dynamics) : Diagnostics Profile by fluorescence Non interceptive bunch measurement Halo device Beam profile at FZJ Measurements at the UNILAC

CSC, , A. Lombardi. 15 WP4 achievements  All the 5 milestones and 1 deliverable due by mid term have been reached.  Three pieces of hardware are ready : CERN chopper plates housed inside a quadrupole, ready to be mounted on the 3 MeV beam line. CERN dump, based on the hyper-vapotron geometry, capable of intersecting the deflected beam power up to 78 MW/m2 RAL Slow Pulse Generator pre-prototype ‘Breadboard’ system

CSC, , A. Lombardi. 16 WP4 –CERN - driver CERN solution, based on mosfet, tested in april06. It works, need money to build the other 3 units. BACK-UP. St. Petersburg solution, based on semiconductor. 6 months delay on delivery. MAINLINE 550 V 700 V

CSC, , A. Lombardi. 17 WP5 achievements  2 milestones delayed by 6 months with justification, 4 achieved.  Code development and code comparison advancing as planned  Diagnostics are ready: 3 deliverables achieved, 1 delayed (April 07) Bunch Shape and Halo Monitor during the test with a laser beam in Tests with a particle beam are planned for A Beam Induced Fluorescence (BIF) Monitor installed on the GSI LINAC

CSC, , A. Lombardi. 18 Milestones and deliverables DELIVERABLES : 2005 : 1/1 delivered 2006 : 4/8 delivered. 3 delayed to delayed to (up to today) : 1 delivered, 1 delayed by 3 months

CSC, , A. Lombardi. 19 Milestones and Deliverables Milestones and Deliverables

CSC, , A. Lombardi. 20 Milestones and deliverables

CSC, , A. Lombardi. 21 Milestones and deliverables

CSC, , A. Lombardi worries  DTL (WP2) model from Russia will not come or will be very late. Alternative model at CERN with contributions from Russia.  Chopper tests with beam will be possible only in June 2008 at the earliest : impacts two deliverables  Staffing problems at RAL (?) : impacts one deliverable

CSC, , A. Lombardi. 23 Dissemination and WP meetings  Dissemination 8 notes, 2 reports since sept conference papers Periodical HIPPI reports delivered (and about to..)  WP meetings : WP2 : may 24 th at CERN WP3 : april 27 th in Orsay WP4 : not fixed yet WP5 : may 21 st in Saclay