PD Connection with National Underground Lab R. Rameika Fermilab October 8, 2004.

Slides:



Advertisements
Similar presentations
1 1 View from DOE LB DUSEL Meeting February 27, 2008 UC, Davis Jerry Blazey NIU/DOE.
Advertisements

J. Kotcher HEPAP Meeting, July 13-14, 2007, Washington, DC 1 Deep Underground Science & Engineering Laboratory (DUSEL) Jon Kotcher HEPAP Meeting Washington,
B.Sadoulet Boulder Intro 1/5/05 1 Boulder DUSEL Study Workshop Introduction Apologies: a difficult date! The DUSEL Process The DUSEL (Solicitation 1) Study.
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
Recent Discoveries in Neutrino Physics: Understanding Neutrino Oscillations 2-3 neutrino detectors with variable baseline 1500 ft nuclear reactor Determining.
DOE Neutrino Program Plans
Committee on Science, Engineering and Public Policy Board on Physics and Astronomy Committee on Setting Priorities for NSF’s Large Research Facility Projects.
F Future of Neutrino Program at FNAL NuMI Off-Axis Meeting Hugh Montgomery January 12, 2004.
NSF VISION in PARTICLE and NUCLEAR ASTROPHYSICS Richard N. Boyd  The Present  Dark Matter  Ultra high energy cosmic rays  Ultra high energy gamma rays.
Neutrino Facilities Assessment Committee Board on Physics and Astronomy National Research Council December 10, 2002 Neutrinos and Beyond: New Windows on.
Deep Underground Science and Engineering Laboratory Worldwide Demand & International Coordination Barry Barish Caltech University of Colorado Workshop.
NFAC Neutrino Facilities Assessment Committee Barry Barish Chair 19-Sept-02 for National Research Council.
Interdisciplinary and Interagency Cooperation in High Energy Physics Barry Barish BPA 5-Nov-02.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
B.Sadoulet DUSEL Blacksburg Introduction 1 Blacksburg Workshop DUSEL process Solicitation 1 Workshops: Berkeley, Blacksburg, Boulder, Maryland(?) Goals.
Nuclear Physics New Underground Laboratories in North America Steve Elliott Los Alamos National Laboratory.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
The QuarkNet Collaboration A Partnership of Research Scientists and High School Teachers and Students Beth Marchant Department of Physics University of.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ICFA Report to KILC12 January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; 23 April 2012ICFA Report to KILC121.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
September 4, 2003Jordan Goodman Ad Hoc Science Committee for the Proposed Laboratory for Science and Engineering at Homestake Who am I and what am I doing.
Outlook on Underground Science Thomas Bowles Los Alamos National Laboratory / University of Washington American Physical Society Meeting Philadelphia April.
Physics Priorities S. Dawson July 11, 2007 Fermilab Steering Committee Meeting.
1 DUSEL and Gravitational Waves Vuk Mandic University of Minnesota 03/17/08.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
Andrew Hime Physics Division, Los Alamos National Laboratory Workshop on Low-Radioactivity Techniques Laurentian University, Sudbury, Ontario, Canada.
Long Baseline Experiments at Fermilab Maury Goodman.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Introduction to the “Cavities and vessels” session ( by L. Mosca) 9h 10’ Presentation of the Laboratoire Souterrain de Modane (15’+ 5’) G. Gerbier (Saclay)
11 DOE Office of Science High Energy Physics Program AAAC Meeting October 15, 2009 National Science Foundation Dennis Kovar Associate Director of the Office.
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
Pathways to Explore Neutrino Physics Fred Gilman NuFact03 New York June 5, 2003.
NWG 4/11/03 Executive Summary R.N. Cahn, W.C. Carithers, S.J. Freedman, K.M. Heeger, R.W. Kadel, V. Koch, K.T. Lesko, Z. Ligeti (deputy), K-B. Luk, H.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
May 27-30, 2008 Nuclear Physics at NSF Research and Education –200+ faculty –80+ postdocs –200+ graduate students –150+ undergraduates University facilities.
Neutrino Oscillations at Homestake from Chlorine to the Megadetector Ancient Origins of the Question ~1860 Darwin publishes “On The Origin of Species”-
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
The RIA Users Organization (RIAUO) Witold Nazarewicz (Tennessee) EURISOL Week, CERN, November 2006 History The Mission Organization Activities Perspectives.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
B.Sadoulet CDMS DUSEL The Deep Underground Science and Engineering Laboratory The process Themes DUSEL and CDMS Bernard Sadoulet Dept. of Physics.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
Low Background Studies at the Soudan Underground Laboratory-9/20/ Low Background Studies at the Soudan Underground Laboratory The Soudan Underground.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
2 July 2002 S. Kahn BNL Homestake Long Baseline1 A Super-Neutrino Beam from BNL to Homestake Steve Kahn For the BNL-Homestake Collaboration Presented at.
Budget Outlook Glen Crawford P5 Meeting Sep
P5 Report: The Particle Physics Roadmap 1 A. Seiden Fermilab May 14, 2007.
ICFA Report to New Frontiers in Physics January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; June 15, 2012New Frontiers in Physics1.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Philip Burrows HEP Forum, Coseners House, 6/05/06 Elementary Particle Physics in the 21 st Century Philip Burrows John Adams Institute Oxford University.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Conventional Facilities for the Far Detector Options Assumptions and Cost Estimates T. Lundin April 25, 2012 LBNE Reconfiguration Workshop - 25, 26 - April-2012.
Detector R&D through the NSF PHY division. Jim Shank/Jim Whitmore, NSF CPAD Meeting Arlington, TX 5-7 October, 2015.
Long Baseline Neutrinos How we got here Nigel S. Lockyer Fermilab Open Meeting on Neutrinos 12/12/2014.
Intensity Frontier Physics with a Mega-Watt Proton Source R. Tschirhart Fermilab Science & Technology Review November
Science Requirements and Instrumentation for Future Neutrino Experiments Gina Rameika, Fermilab Instrumentation Frontier Community Planning January 9 –
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
K. Long, R. Roser, 23 July 2014 Report from the Neutrino Summit.
“Megaton” Cerenkov Detector - Excavation Kenneth Lande, Univ. of Pennsylvania 4200 mwe Depth.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
23/11/05BENE meeting at CERN1 (22-25 November 2005) L. Mosca (CEA-Saclay) The MEMPHYS project MEgaton Mass PHYSics in a Large International Underground.
Charge for APS Neutrino Study
nuSTORM and the Physics Beyond Colliders workshop
Fermilab Proton Beams: Program Perspectives Greg Bock Fermilab Science and Engineering at Henderson-DUSEL Capstone Workshop Stony Brook May 5,
Presentation transcript:

PD Connection with National Underground Lab R. Rameika Fermilab October 8, 2004

Outline Introduction : A Brief Review of the saga of building a National Underground Laboratory Recent developments What’s DUSEL? –Scope and Process The Accelerator Connection Summary & Outlook

History… 1965 : construction of the Davis,et.al. Cl detector begins at the Homestake Mine –Over the next 35 years Homestake hosts the Cl experiment,as well as cosmic and double-  experiments Early 1980’s: Al Mann and collaborators lead an effort to create a US underground science laboratory, modeled after the newly started Gran Sasso Laboratory in Europe. Despite growing excitement in the community over solar neutrinos, double beta decay, proton decay and other underground science, the funding effort is unsuccessful. –Over the next decade, proton decay experiments are started in the US at Soudan and IMB; worldwide underground initiatives continue : New discussions begin with NSF and DOE about establishing Homestake as a national underground science laboratory.

History, con’t 2000 –DOE sponsored workshop on using WIPP (Waste Isolation Piolet Plant, Carlsbad, N.M.) as a site for a next-generation underground laboratory –Underground Laboratories included as one of five working groups in the nuclear physics community’s NSAC Long Range Planning meeting Presentations for Homestake, WIPP and Soudan in US, as well as Gran Sasso, Kamioka and Sudbury NSF suggests the development of a White Paper supporting the creation of a National Underground Science Laboratory (NUSL) –Bahcall Committee : Bahcall, Barish, Calaprice, Conrad,Doe, Gaisser,Haxton,Lesko,Marshak,Robinson, Sadoulet, Sobel,Wiescher,Wojcicki,Wilkerson

White Paper on Underground Science I.Solar Neutrinos II.Double Beta Decay III.Dark Matter IV.Nucleon Decay V.Atmospheric Neutrinos VI.LBL  oscillations VII.Supernova neutrinos VIII.Nuclear Astrophysics IX.Geoscience X.Materials Development and Technology XI.Monitoring Nuclear Tests XII.Microbiology FNAL to Soudan - 730km Homestake km WIPP km San Jacinto km Common Detector?

Report of the Technical Subcommittee 4 sites investigated –Homestake (up to 7200 mwe) –San Jacinto (horizontal access, 6,500 mwe) –Carlsbad (WIPP) (1700 existing mwe) –Soudan (2200 mwe existing) Homestake & San Jacinto favored for depth Many other factors considered and documented –i.e. Soudan in “existing” neutrino beam, although already recognized that a longer baseline may be desirable Subsequent reviews over the next several years come to similar conclusions

History con’t March Nuclear Physics Long Range Plan : “We strongly recommend immediate construction of the world’s deepest underground science laboratory. This laboratory will provide a compelling opportunity for nuclear scientists to explore fundamental questions in neutrino physics and astrophysics.” June NUSL-Homestake proposal submitted to the NSF July High Energy Physics community includes Underground Science in Snowmass summer study October Lead Workshop(s) on Underground Science Science and engineering workshops

History con’t : Committee Reports by and for Funding Agencies Nuclear Science Advisory Committee(NSAC) : Opportunities in Nuclear Science: A Long Range Plan for the Next Decade (April 2002) High Energy Physics Advisory Panel (HEPAP): The Way to Discovery : Particle Physics in the 21st Century (April 2002) National Research Council (NRC): Connecting Quarks to the Cosmos : Eleven Science Questions for the New Century (April 2002) Nuclear Facilities Assessment Committee (NRC panel): Neutrinos and Beyond (December 2002) 2003 : Detailed proposals for Homestake, Soudan and San Jacinto submitted to NSF National Science and Technology Council (NSTC/OSTP) : A 21st Century Frontier of Discovery : The Physics of the Universe (February 2004) NSF/DoE Office of Science HEPAP committee: The Quantum Universe (June 2004)

p. 33 All the reports send ~ the same message; from Neutrinos and Beyond

NSF Site Panel Report Concerning a Deep, Underground Science and Engineering Laboratory - 5/28/03 Evaluation of –Geological suitability ~50 m linear dimension, ~2500 m depth, ~50 yr use –Relative costs Access, excavation, infrastructure 3 Sites Reviewed –Homestake Mine, Lead, SD –Soudan Mine, Soudan, Mn –Mt. San Jacinto, Ca Conclusion –Most favorable : Homestake –Least Favorable : San Jacinto –Possible “back-up” : Soudan

February 2004

Meanwhile… Earth scientists begin discussing opportunity to develop an underground research laboratory in conjunction with proposals to create an underground neutrino observatory. October Earth Science Workshop to discuss earth science studies that could be conducted at the underground lab and discuss the technical requirements for such studies June Earthlab : A Subterranean Laboratory and Observatory to Study Microbial Life, Fluid flow, and Rock Deformation, June September An NSF-Sponsered Workshop on Deep Underground Science and Engineering Laboratories (DUSELs) [in conjunction with 10 th Congress of the International Society of Rock Mechanics] –The workshop was convened to refine the scope of activities proposed at Earthlab, an underground research laboratory that may be developed in conjunction with a deep neutrino detector.

More recently…. NSF returns unsolicited Homestake, Soudan and San Jacinto proposals “without predjudice” February March 2004 Process Meeting at NSF –NSF/MPS-led, working with GEO, ENG and BIO Directorates through an Underground Science Working Group –NSF Working with DOE to develop mechanisms for reviewing and funding experiments –Series of 3 solicitations to help the community develop proposal(s) #1 Science motivation, experimental programs, synergies, site- independent definition of requirements #2 Site specific investigation of suitability of a site to meet requirements defined in #1 #3 Site specific proposals Currently 8 candidate sites

Solicitation #1 proposals due 9/15/04

Emphasis on finding synergies

For Solicitation 1, attempt to develop a single Proposal within the community

Solicitation 1 Workshop at Berkeley August 11-14, 2004

Sites developing DUSEL Solicitation #2 proposals

The accelerator connection

1000 km < L < 2500 km

Sites developing DUSEL proposals

Lesko-Wang “greenfield” sites

Laughton “additional” potential sites

Flavor of the Workshop Exploration of Modules and Synergies –LBL & Proton decay detectors Large  good synergy Similar depth requirement : not necessarily –Large detectors vs small detectors Deep vs very deep Large caverns vs small caverns  $$$ issue –Geoscience vs Physics Homogeneous vs varied rocks –Geoscientist may benefit most from the site investigation process if they can get organized promptly Drilling & blasting vs running detectors –Laboratory Infrastructure Amenities (dormatories, networks,shops…) Outreach

Detector vs Cavern Size Rock mechanics experts have real reservations about spans of ~100m dimension and >~5000 ft depths; i.e. Hard to guarantee long lifetime

Requirements Matrix Depth, volume, …

Summary The scientific case for construction of a National Underground Laboratory to host a diverse set of experiments has been made repeatedly for many years The scientific case for planning the next generation of long baseline neutrino oscillation experiments continues to get stronger It is well recognized that both of these endeavors are very expensive : –Proposals for the Underground Laboratory have had cost estimates which range from ~$500K - ~$300M (excluding detectors and very large caverns) depending on the amount of excavation and depths required It is therefore also recognized that if we go with the large multi-purpose facility the Laboratory will not get constructed “quickly” –Experiments to use the Laboratory will likely be the next-next generation of experiments : experimental goals and hence requirements need to be set accordingly (need to look ahead and know how to plan the science)

Summary con’t The current DUSEL Process is prescriptive and requires development of “Science Modules”, i.e. a plan for evolution of the DUSEL, perhaps building it in stages Multiple Laboratory sites are possible (i.e. it may not be possible to find compatibility among all current proponents and potential users; NSF wants the options explored before making a multiple site decision) The possible synergy between a detector planned for a long baseline experiment and one planned for proton decay and supernova observation is recognized by both the scientific communities planning the experiments as well as those who review the scientific proposals and policy makers/funding agencies There is not a complete consensus among the DUSEL proponents that a very large detector + neutrino beam is in fact the “flag ship” experiment of the Laboratory (large vs small camps)

Summary con’t Many potential sites are at appropriate distances from Fermilab (and Brookhaven) Most are due West of Fermilab (and BNL) Acknowledged that LBL experiment in the DUSEL assumes that the accelerator lab producing the neutrinos will successfully manage to get an upgrade to produce a MW proton beam. Laboratory and detector requirements –Deep depth not a requirement for accelerator experiments but is a requirement for proton decay Depth vs cavern size is an important consideration –Large/massive detector required for both Water cerenkov - default/baseline because of previous experience Liquid argon - viewed favorably by both communities; Both need R&D to scale to very large size

Conclusions Future Long Baseline experiments need the proton driver : > 1 MW proton power Future Long Baseline experiments should have a Long Baseline : > 1000km Future Long Baseline experiments need a very massive detector : >> 50 ktons Future  >≈ 10 years

Conclusions Now is the time to –Get started with getting the Proton Driver approved –Learn how to handle MW proton beams : heating and radiation protection issues –Work on optimizing proton energy/neutrino flux; develop conceptual designs for extraction and neutrino beam components These may have impacts on layouts of the proton driver which need to be addressed early due to environmental impact analysis (one of the earliest steps in getting a new start approved) –Evaluate appropriate sites; work with the on going process for site selection of an Underground Laboratory; decide if the synergy is real and workable –Continue/increase detector R&D to enable the design of an appropriate, cost & technically efficient detector