East Anglia Construction Safety Group Chris Barrett Training Manager Access.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

CETI Programme.
OHS Safe in the Knowledge Contact OHS on: The Compliance Consultancy Health Safety and Environmental Management Delivering the vision An incident.
Construction Industry
Presenting: Units A1 and A2
Height Aware Campaign. Background Work at height Who the campaign is for What will happen Work at Height Regulations 2005.
Work at Height Regulations 2005
Safe working on or near roofs
Introduction The Company The Construction Industry Site Safety Issues.
A Free Resource From The presentation is from Mark Sutton For SAFEHANDS Health & Safety Consultants Ltd A Free Resource From
Working at Height - Ladders. Legislation The Work at Height Regulations 2005 Ladders can be used for short duration work when: the risk assessment shows.
Capabilities – What we can do for you. Dawsons Training is a part of The Dawsons Group of Companies which is one of Australias largest privately owned.
Hansen – Managing Safely Work at Height Regulations 2005.
Introducing TG20:13 Terry Roberts, CADS
1 Introducing TG20:13. 2 Official launch - 22 nd November 2013 at the NASC AGM, Bristol ‘A comprehensive guide to good practice for tube and fitting scaffolding’
PowerPoint presentation
Fall Protection Falls 4,628 fatal work injuries were recorded in the United States in deaths a week or 12 deaths every day 806 construction related.
SCAFFOLD SAFETY.
FALL PROTECTION.
L2A WaH Training (November 12) Stage Crew L2A WaH Training.
© Serac UK 2013 Checking Contractor Competence Don Glaister.
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
Working At Height. Avoid Avoid working at height if possible. Consider whether the work can be done: At ground level Elsewhere, e.g. at the manufacturers.
Working at Height Learning Lite Module. Why do we need to understand the risks? In 2008/09 there were 35 fatalities, 4654 major injuries and a further.
Working at Height Presented by Nic Carstens Health and Safety Officer Tel:
The Construction Industry’s Leading Certification Card Scheme.
New Fall Protection Rule WAC History of the Rule  Ad Hoc Group – Governs Moratorium  New Rule Combine Part C-1 with Part K  Filed New.
The Construction Industry’s Leading Certification Card Scheme.
CSCS Scheme Changes Gordon Jenkins CSCS Director of Operations.
Temporary Works – What Needs to be Done
Risk Assessment S afe W ork at H eight O peration In Pakistan recorded worker fatalities from falls from height average 80 people each year Over 42% of.
Safety for Working in High Places
Construction Health and Safety Competence John Bissett MCIPD.
The Association of Cost Engineers THE ASSOCIATION OF COST ENGINEERS 3 rd November 2009 Cost Engineers A Tiered Approach to Accreditation.
“Guidance on rescue during working at height” & their role within the “Working at height regulations 2005 Delivered by Daniel McNess Abseil Inspector /
1 Developing and Maintaining Policing at Height Capabilities Jez Hunter MIOSH.
Scaffolding Eric [Baaba Koro] & Pankaj & Ben Group
Appendices Subpart R Steel Erection
Business 21 Publishing © 2006 Fall Protection A user-friendly training module to help supervisors and workers:  Understand fall protection  Prevent injuries.
Fall Hazards.
© CITB CITB Specialist Federation Support John Hallows Specialist Account Co-ordinator Federation of Planing Contractors Annual General Meeting 21 st Jan.
Implementing TG20:13 by Simon Hughes, Simian Risk
Walking-Working Surfaces: Preventing Falls. Start Safe and Stay Safe In order to Start Safe and Stay Safe in the areas where you walk and work, you should.
Work at Height Regulations Health and Safety Executive.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
The Construction Industry’s Leading Certification Card Scheme.
Tutor2u ™ GCSE Business Studies Revision Presentations 2004 Training.
Safety Induction to the Lift & Escalator Industry Part 5 - Working Places and Safe Part 5 - Working Places and SafeAccess.
UNDER CONSTRUCTION II CONFERENCE 13 TH N OVEMBER 2009 CONSTRUCTION SKILLS CERTIFICATION SCHEME 1.
SAFE SCAFFOLDING PRESENTATION BY: Bechtel Scaffolding Department.,
Work at Height The New Regulations. BACKGROUND AND APPLICATION.
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
Guidance on the Working at Height Regulations 2005 (amended). Delivered by Daniel McNess Abseil Inspector / Emergency Rescue Co-ordinator Severn Bridges.
Fire and Rescue Service Manual Volume 2 – Fire Service Operations SAFE WORK at HEIGHT.
BPS3413 CONSTRUCTION SAFETY Lecture 6 : Working at Height.
COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION MEMBER Peter Bennett MANAGING DIRECTOR Safe Working with mobile towers.
Rick Statham HAS Dip, CMIOSH (Joint Managing Director) Safety & Access Ltd SG4:10 Preventing Falls in Scaffolding Revised Industry Guidance.
SAFE WORK at HEIGHT Chris Bilby Station Manager Operational Planning Group Leicestershire Fire & Rescue Service.
Working at Height How to comply with the new Regulations.
Electronic Report of Injuries & Illness
SG4:10 Preventing Falls in Scaffolding Revised Industry Guidance
Height Work Safety.
CPCS A Skills Card for the Plant Industry
Temporary Works Co-ordination
Subpart M Fall Protection.
Somerset Health and Safety Group Work at Height
Click anywhere to get started…
Code of Practice for Access & Working Scaffolds
Drilling and Blasting Toolbox Talk : 03 Updated Aug 2014
Work at Height – Ladders and Step Ladders
Presentation transcript:

East Anglia Construction Safety Group Chris Barrett Training Manager Access

Construction Industry Scaffolders record scheme SG4 – Preventing falls in scaffolding and falsework - Future developments, latest guidance TG20

Construction Industry Scaffolders Record Scheme

History of the Scheme( CISRS) Record Scheme Cards Adult Training Route Training Programmes Vocational Qualifications CITB Grants

History of the Scheme Introduced in 1979 by the Construction Industry Joint Council in conjunction with the NASC Training courses developed by the Construction Industry Training Board in consultation with the Scaffolding Industry A network of accredited Centres established throughout the UK

The Record Scheme Cards Scaffolding Labourer Trainee Scaffolder Scaffolder Advanced Scaffolder Scaffolding Supervisor

Scaffolding Labourers Card For operatives who will be carrying out only labouring/driving duties. Shows holder is a competent labourer and has current up to date Health and Safety knowledge Obtained by: Experience/industry accreditation or achieving an N/SVQ level 1 in Access Operations and Rigging

Trainee Scaffolders Card For operatives who have been accepted by their employer to be trained as a scaffolder. The operative must have passed the Health and Safety test. The first card is issued for 18months. The trainee card can be renewed for a further 18 months if the candidate has attended a Part 1. Trainee cards are only renewable once.

Scaffolders Card For operatives who have satisfactorily completed the approved training courses and achieved an N/SVQ level 2 in Access Operations and Rigging Basic cards have a 5 year expiry date. Basic cards are renewable on proof of passing the Health and Safety test within two years of application.

Advanced Scaffolders Card For Scaffolders who have held card for 1 year and satisfactorily completed the Advanced training course and achieved an N/SVQ level 3 in Access Operations and Rigging Advanced cards have a 5 year expiry date. Advanced cards are renewable on proof of passing the Health and Safety test within two years of application.

Adult Training Route

Experienced Worker Practical Assessment EWPA An alternative to the normal NVQ assessment process Candidates must have completed part 1 and part 2 Candidates must have an appropriate time to develop experience after completing the part 2 (typically 1 year) Only available for level 2 Candidates are nominated by an employer

Basic Part 1 Training Programme Health and Safety awareness SG4:00 Use of fall arrest equipment Inspection and use of harnesses Interpretation of simple drawings Theoretical and practical training : Independent tied Independent with return Mobile tower Static tower Birdcage Putlog

Basic Part 2 Training Programme Recap on SG4:00 Practical and theoretical training: Heavy independent with bridging Truss- out Pavement gantry Protective fans Roof saddle Roof edge protection Structural Alterations Netting and Sheeting

Advanced Training Programme Practical and theoretical training: Tubular drop from steelwork Two –way shore/dead shore Temporary roof scaffold Staircases (Tube & Fitting and prefabricated system) System false-work Risk assessments Method statements Interpretation of design drawings

System 2 day product awareness courses Avaliable for any scaffolder holding at least a trainee card There are six systems approved Haki Layher Turner +8 Kwikstage Plettac Cuplock Not all types will be offered speak to the centre

BASE course Basic access System erector 1 week course Aimed at house building market Only allowed to work on enclosed sites NVQ level 1 Limited range of structures to a maximum of 6m high.

Future developments Scaffold safety Inspection course Ties testing and inspection for supervisors TG20 update

Summary CISRS the only skills card for scaffolders recognised by Industry Four categories available CISRS affiliated to CSCS Obtained by completing NASC approved training courses and achieving an appropriate N/SVQ Renewable every 5 years Training and achievement grants available to CITB levy payers

SG4:05 Preventing Falls in scaffolding and Falsework

AVOID WORK AT HEIGHTS Avoid work at height so far as is reasonably Practicable: Not normally an option for the Scaffolding Contractor Designers and Principal Contractor should Identify opportunities to avoid work at height. Scaffolding and Falsework Contractors should promote Innovations to their client that can avoid work at height. PREVENT FALLS Where it is Not reasonably practicable to avoid work at Height you should consider: Preventing all falls from height where there is a risk of injury regardless of height. Collective protection measures as a priority over personal protection Use equipment (such as guard-rails) to provide collective fall protection & prevent falls occurring before resorting to personal protection such as work restraint harness and lanyards for example

MITIGATE THE DISTANCE AND CONSEQUENCES OF A FALL Where it is not reasonably practicable to avoid Or prevent falls; then, The distance a person can fall and the consequences (potential injury) must be minimised. Consider collective protection measures priority over Personal protection. Collective protection in the form of soft landing systems (e.g. Air-Bags and safety nets) are not commonly a practical Solution for scaffolding. Personal protection systems (safety harness) Must be worn And attached to a suitable anchor point – in accordance With this guide – when at risk of falling. GIVE COLLECTIVE PROTECTION PRIORITY OVER PERSONAL PROTECTION

SG4:05 addendum HSE activity in relation to enforcement of SG4 Manufacturer activity in relation to SG4 Interim guidance Planned updates Rescue procedures Updated guidance on suspension trauma

TG20:05

TG20:0? Introduction of different widths of Working platform Revised the allowable Facade bracing patterns Revised the guidance for the installation of plan bracing Revised guidance for the installation of ledger bracing Guidance on the layout of ties Revised load classes for Putlog scaffolds Revised maximum safe working heights Options for a reduced Bay length intoduced

Conditions for basic scaffolds Is a standard scaffold Load classes, maximum bay lengths comply with Table 1 TG20:0? There are only 2 working lifts,one fully loaded and one 50% loaded Lift height is not greater than 2.0m (1 st lift may be 2.7, maximum The scaffold is not subject to loading of materials by mechanical means. The wind factor S is not greater than 40 Alternate pars of standards are braced At least 50% of ties shall be fixed to ledger braced standards Vertical interval of ties shall not exceed 4m

Conditions for basic scaffolds Plan bracing is fitted every 4lifts and 12 bays unless facade bracing is across braced pairs of standards If sheeted the sheeting is attached to the ledgers and principle guardrails as a minimum When sheeted the top lift is tied at platform level Façade bracing is fitted

Conditions for Free standing scaffolds Not more than 6m high The scaffold must not be sheeted or netted Lift heights must not exceed 2m Bay lengths no more than 2.1m Only one lift boarded ( maximum loading 2kN/m2) Scaffold width is either 4 boards plus one or five boards Alternate pairs of standards are braced Single un-joint tubes used for standards and rakers Façade bracing fitted every five bays Maximum wind factor S=26

Procedure to determine safe height of a Basic scaffold Choose basic wind speed (v b ) using Fig.7Fig.7 Establish critical Direction of wind. Establish topographical factor (T) using Fig.8Fig.8 Establish the altitude Calculate wind factor using S=V b x T x (1+A/1000)

Procedure to determine safe height of a Basic scaffold Establish Town or Country Determine closest upwind distance to sea. Use flowchart 4 for independents to determine safe height.flowchart 4