Overview. >Mobile Broadband, Future Spectrum Needs, a Cynical View. >A planners view of spectrum needs. >Current planning, and waste, in the Digital Dividend.

Slides:



Advertisements
Similar presentations
ITU Regional Development Forum - Warsaw 7 May The Radio Spectrum Policy Programme & the Spectrum Inventory Pearse ODonohue Head of Radio Spectrum.
Advertisements

“Short range, high data rate, nomadic equipment operating in the frequency range to GHz” - BT’s Response to the Consultation Document Johnny.
Restack Status Report 16 October 2012 Digital Switchover Taskforce Housing and Property Working Group Tara Morice Manager, Restack Policy.
1.  The Australian Radio Communications Industry Association represents some 300 commercial entities including approximately 1500 industry professionals.
Submission doc.: IEEE /0010r0 January 2015 Sho Furuichi, SonySlide 1 Coexistence Scenario and Use Cases Date: Authors: Notice: This.
Spectrum 2020 Dr. Andrew Kerans Executive Manager Spectrum Planning Branch.
Digital dividend planning, whitespace and wireless microphones Nevio Marinelli, ACMA.
UK Spectrum Management Strategy: tomorrow’s challenges today Chris Woolford Director, International Spectrum Policy Radcomms 2014.
ACMA Spectrum Strategies 2 March 2006 Optus Networks Perspective Wireless Spectrum Strategies 2006 Peter FERRIS General Manager, Technology and Planning.
Report doc.: IEEE /0547r0 “The NGMN Alliance is an industry organization of world-wide Telecom Operators, Vendors and Research Institutes (see.
Licence Fees RCC Working Group Meeting 17 October 2003.
Intelligent Transport Systems (ITS) - Update on spectrum arrangements Spectrum arrangement options to support ITS in the MHz band in Australia.
New Federal Spectrum Access System - US 3.5GHz bands -
© Copyright THUS Group plc All rights reserved. UK Spectrum update Steve Kennedy NetTek Ltd.
National Science Foundation Symposium Ed Thomas Chief, Office of Engineering and Technology Federal Communications Commission.
Coexistence challenges in the UHF band Bruno ESPINOSA European Communications Office (ECO) Overview of CEPT/ECC actions.
MED Radio Spectrum Policy and Planning Update Brian Miller, Manager Ben Temple, Senior Policy Analyst Cristian Gomez, Planning Engineer.
COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. 1 Latin American Spectrum Conference 2012 Mexico City October 24-25, 2012 Session on The Possibilities.
Spectrum & the ESAP Process ATIF - April 16, 2009 Samer Halawi Vice President, Strategic Corporate Development Inmarsat plc (LSE: ISAT)
GSC: Standardization Advancing Global Communications Review of GRSC3 meeting SOURCE:ETSI TITLE:Review of GRSC3 AGENDA ITEM:GRSC4 3 CONTACT:Karl Heinz Rosenbrock.
Growth in Mobile Broadband and its Implication for Spectrum
Update on the Restack of Digital Television Services Chris Hose Executive Manager, Technical Planning and Evaluation Branch, ACMA.
Satellite spectrum issues Chris Hose Spectrum Engineering Section RadComms /12 December 2006 Australian Communications and Media Authority.
Wireless Broadband Service in Rural America Rural TeleCon ‘06 October 24, 2006 Paul D’Ari Spectrum Competition and Policy Division Federal Communications.
Doc.: IEEE /0023r1 Submission March 2010 Rich Kennedy, Research In MotionSlide 1 Ofcom 600 MHz Consultation Questions Date: Authors:
The $20 Billion Question: Can Satellite and Terrestrial Wireless Co-Exist in C-band? David Hartshorn Secretary General Global VSAT Forum.
Radio Spectrum Strategy Petr Zeman, International Relations Department Czech Telecommunication Office.
Spectrum: a scarce resource Chris Woolford Director, Spectrum and International Policy 2 December 2008.
Wireless Technology - Rural Networks FCC Broadband Plan Workshop Washington, DC August 13, 2009 Brett Glass LARIAT.NET P.O. Box 1693 Laramie, WY
Conselheiro José Leite1 JOSÉ LEITE PEREIRA FILHO Member of the Board PORTO SEGURO, BA 4 JUNE 2001 ITU-T SEMINAR Multimedia in the 21st Century.
Review of the 803 to 960 MHz band Bridget Lally, Senior Radiocommunications Engineer, Spectrum Infrastructure Branch,
1 2 nd INDUSTRY CONSULATION ON PROPOSED UNIFIED LICENSING FRAMEWORK IN KENYA: KCCT 19 th March 2008 Frequency Issues Communications Commission of Kenya.
Wireless Access Services ACMA/ITU International Training Program 5 September 2006 Nevio Marinelli & Christine Allen Wireless Access Services Planning Team.
Spectrum and Mobile Broadband Beyond Mobile Evolution in Australia G CDMA GSM AMPS First fully automatic mobile system Australian.
APCO Western Regional Long Beach, CA March 1, MHz Issues Robert Gurss APCO Director of Legal & Government Affairs (202) ,
Beyond 2020 — A spectrum management strategy to address the growth in mobile broadband capacity Bridget Kerans Senior Radiocommunications Engineer Spectrum.
Doc.: 18-12/108r0 Submission October 26, 2012 Slide 1 FCC TV Band Incentive Auction: Impact on Unlicensed Operation Notice: This document has been prepared.
1 WiMAX and the Canadian Radio Spectrum April 28, 2006 Angela Choi Communications Engineer Pacific Region Industry Canada
©Ofcom The liberalisation of spectrum and its impact on service Business Radio nd November 2007 Charles Jenne Director, Spectrum Policy Group.
Mobile Broadband Strategy Update RadComms 2014 Chris Hose Executive Manager, Spectrum Planning and Engineering.
Finding Spectrum for Technologies Beyond 3G Regulatory challenges as we enter a new world Michele Wakefield Ofcom.
Digital broadcasting— a 2012 roadmap Giles Tanner General Manager Digital Transition Division ACMA.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
Mobile Broadband Strategy and Work Program Update RadComms 2016 Chris Hose Executive Manager Spectrum Planning and Engineering.
Spectrum Sharing in 3.5 GHz Band
Global Regulatory Trends in Spectrum Management
Major topics from ECC strategic plan Spectrum issues Peter Faris 4 th CEPT Workshop on European Spectrum Management and Numbering 5 th April 2016.
Innovation, Science and Economic Development Canada (ISED) 600 MHz Repurposing RABC 600 MHz Working Group Meeting Innovation, Science and Economic Development.
AI MHz MHz ECC DEC (15)01 + CEPT report 53 ECC-FCC-IC Liaison Meeting Maisons Alfort, May 2015 Didier Chauveau ECC PT1 Chairman.
Agenda item 1.16 VHF data exchange system (VDES).
Use of Spectrum Bands Above 24 GHz For Mobile Radio Services ‘5G’…
Spectrum Planning Work Program Tune-up Spectrum Monitoring and Analysis Section Zarko Krusevac Section Manager.
Spectrum Planning Work Program Tune-up Spectrum Engineering and Space Section Mark Arkell Section Manager.
SPECTRUM IN TRANSITION
Impact of WRC-15 Outcomes on Sub-Saharan Africa
Coexistence challenges in the UHF band
Realizing the Full Potential of Government-Held Spectrum to Spur Economic Growth PCAST May 25, 2012 Update.
Current and Future Directions in Spectrum Sharing
Session 3: Major topics on Spectrum
5G Is 5G the next thing? Rail Technology Summit, 26 April 2018
Radio Spectrum Policy in Europe
Presented by Mohamad Haidar, Ph.D. May 13, 2009 Moncton, NB, Canada
Ofcom 5 GHz Consultations Questions and Answers
Ofcom 5 GHz Consultations Questions and Answers
FCC Spectrum Sharing in the 3.5GHz Band Comments Approval
Ofcom 5 GHz Consultations Questions and Answers
Telecommunications Spectrum Policy and Planning Regional Workshop on Efficiency of the Frequency Spectrum Use in the Arab Region 5 – 7 December 2011.
April 24, Study Group 1 A Regulatory Framework for Use of TV Channels by Part 15 Devices John Notor, Cadence Design Systems, Inc.
Ofcom 5 GHz Consultations Questions and Answers
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Presentation transcript:

Overview. >Mobile Broadband, Future Spectrum Needs, a Cynical View. >A planners view of spectrum needs. >Current planning, and waste, in the Digital Dividend. >The 3GPP Standard and 850 MHz Expansion. >New sharing paradigms. >Underlay Technologies and Technical Approaches. >Overlay, Whitespace and Cognitive. >National Interest Planning. >Use of ‘Private Parks’ for Smart Infrastructure. >Government use and harmonisation.

Obligatory data demand curve. (Source, just about everyone) 2007 used as benchmark, normalised to 1. Spectrum in market known at that point. 30 times increase in data demand between 2007 and Indicates 30 x increased need for spectrum if no other factors come into play. Not sustainable!!!! Note, ‘in market’ means the spectrum is available to the market. Actual use is not considered.

Demand for spectrum decreases as coding, modulation and MIMO improves with time. Assumes 3 fold improvement in coding efficiency. That is three times more bit/Hz in 2014 than 2007 Obviously not sustainable, thanks to Prof Shannon. ACMA research shows 4 fold increase possible, but at the margins.

Clearing existing users can cost money. If this were reflected in spectrum price then more infrastructure could be the answer. (This example; halving cell radius) As spectrum becomes scarcer the ACMA will need to set its price accordingly. As Shannon’s limit is reached, infrastructure will become the only variable. This curve shows the outcome for a ½ cell radius. (Simplistic). Use of layered approach, down to femto cells may be needed soon.

Combining all of these, spectrum demand increases by 2.45 between 2007 ‘in use’ holdings and 2014 From 30 x to 2.45 x (say 2.5). Would decrease with greater use of infrastructure instead of spectrum. ‘Out of use’ spectrum must be taken into account (10 MHz at 825 MHz and ~ 100 MHz at 2.3 GHz). Problem exists primarily in cities (Syd and Melb). Spectrum cannot be wasted via overly conservative spectrum planning (guard bands). ACMA spectrum planners do not like guard bands. Once spectrum is put to market it is the industry’s responsibility to trade it and use it properly.

>In MHz was in market and used. >Current plans deliver additional 398 MHz into market (includes 2.3 GHz coming into service and expanding to 100 MHz). >‘850 MHz Expansion’ could deliver up to 40 MHz >900 MHz (ex GSM) could be re-farmed for UMTS and put into market (not ‘additional’) >Approx 445 MHz ‘extra’ gained from new spectrum and putting old blocks to better use. (x2.2) >Suggests about 100 MHz of ‘new’ spectrum may be needed. (agrees closely with FCC figures).

Digital Dividend Planning to date: Region 3 Harmonisation primary goal; economies of scale in equipment. US Model not satisfactory from spectral efficiency point of view. Australia strongly proposed 2 x 50 MHz plan. Differences in band edge and concerns over mid band gap means 2 x 45 MHz likely.

Extending 850MHz Study Looking at spectrum above 806 MHz Extends current PMTS band (Primarily Telstra ‘Next G’) Pairs with various services (some unused like 45 MHz duplex.

Proposed 850 MHz Expansion Bands. Additional 2 x 20 MHz enabled by Digital Dividend. Total amount of spectrum enabled by Dig Div = 130 MHz (2 x 65 MHz paired). Will not be available at same time due to work needed to replan 900 MHz band plan.

Underlay >What is ‘Underlay’. >Low transmit power where power limitations protect licensed receivers. Examples, LIPD and UWB. UWB is here already.

UWB. An ‘underlay’ device. Very low power thus very low interference potential. Devices may operate to these levels without considering interference issues. Note very low levels around GPS bands.

Overlay devices. >Not power limited. >Limited by need to protect ‘core’ licensed receivers. >Example. I/N < -6dB for < 0.1% Time (mean power in 30 kHz) I/N < 0 dB for < 0.01% Time Where N = 10Log(kTB) + NF. NF = 5 dB. >This sort of licence could be all bands, however natural exclusions would be evident in ‘ubiquitous’ receiver bands such as GPS, Ku Satellite Receive and possibly in RADAR bands. >Would cover both cognitive and whitespace devices. >‘Virtual Occupancy’ may occur via inter-modulation products close to receivers. This will make the cognitive problem more difficult. >Responsibility to protect receivers falls on transmitter.

Example cognitive access using previous protection figures.

TV Whitespace??? Similar rules to cognitive, but must protect Dig TV Rx Plenty out bush, but why bother?? Restricted in cities, perhaps low power only (wireless microphones) N.B. This map is BEFORE restack. It will get more crowded.

400 MHz, the last word. Final paper released 30 April. Band replan decisions now final. Band pricing subject to comment. Prime objectives, emergency services harmonisation and congestion relief.

Government use, a holistic approach. >State Government entities use a multitude of bands to deliver services. >400 MHz just one band, but one where harmonisation is key. >New bands coming, such as 4.9 GHz PPDR ‘WiFi’ band. >Other bands in HF and VHF. >Licensing is the next consideration. >A single State entity, band use being subject to signing up to (and applying) NCCGR National Framework??

400 MHz Roadshow. >ACMA staff will be speaking to affected parties in every capital and Townsville Northern Leg Monday 19 July Sydney Roadshow Tuesday 20 July Brisbane Roadshow Wednesday 21 July Townsville Roadshow Thursday 22 July Darwin Roadshow 400 MHz Roadshow- Tentative Schedule Southern Leg Tuesday 27 July Hobart Roadshow Wednesday 28 July Melbourne Roadshow Thursday 29 July Adelaide Roadshow Friday 30 July Perth Roadshow

National Smart Infrastructure. A pause for thought. Appropriate method of making bands available?? Spectrum licence, multiple parties?? Private park?? But why not a single network meeting (radio) needs of all (i.e. Rail, Electricity, BoM, water etc) using a single band.

Conclusions. >ACMA actively monitoring future spectrum needs. >ACMA leading in Region 3 Dig Div planning. >ACMA actively engaged in 850 MHz expansion. >ACMA is ahead of the pack on Cognitive Radio Access, having developed proposed Protection Factors for Auxiliary Access (PFAA). >ACMA monitoring ‘whitespace’ issue, but access will depend on restack and wireless microphones. >ACMA with the leaders on UWB. >ACMA ahead of the pack in closely studying broadband spectrum needs, but expects industry to ‘soften the blow’ to incumbents. >Harmonisation and congestion in 400 MHz, paper released. >ACMA is a leader in thinking about the spectrum needs of intelligent infrastructure projects.

Contact Andrew Kerans Executive Manager Spectrum Infrastructure Branch T: