National Aeronautics and Space Administration www.nasa.gov 1 GRC All-Hands Meeting 1 May 2006.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

MSFC Partnerships Office Function, Organization, and Operation
Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Neil F. Albert MCR, LLC 12 May 2010.
Advances in Thermal Protection System Instrumentation for Atmospheric Entry Missions Johnny Fu Sierra Lobo, Inc. NASA Ames Research Center Presentation.
Charles Nola Lisa Blue June 21, 2006 Charles Nola Lisa Blue June 21, 2006 Crew Launch Vehicle (CLV) Upper Stage Avionics & Software Acquisition Planning.
National Aeronautics and Space Administration Systems Engineering (SE) Tools National Aeronautics and Space Administration Example.
PRE-DECISIONAL DRAFT; For planning and discussion purposes only 1 1 March 4-5, 2008 Evolution of Lunar to Planetary Landing A.Miguel San Martin Mars Science.
Federal Aviation Administration Next Generation Air Transportation System (NextGen) Briefing to COMSTAC Kelvin Coleman May 16, 2008.
National Aeronautics and Space Administration DEVELOP National Program 2.
Mission Directorate Exploration Systems MSFC CD Chief S&MA Officer MSFC SMA DART Project Office (J. Snoddy) DART Contract (CPIF) 17 Mission Directorate.
International Space Station: National Laboratory Development Brad Carpenter Space Operations Mission Directorate NASA Headquarters.
University of Wisconsin-Madison Space Science and Engineering Center (SSEC) 26 October 2005 SSEC/CIMSS Administrative Overview from Wenhua Wu, Tom Achtor.
Elements of Planning and Decision-Making
National Aeronautics and Space Administration The Future of Space Exploration Orion, Ares and Beyond.... AIAA / NSC / JPL Town Hall Meeting 26 April 2007.
Programs without software- intensive system research elements Where most of the software- intensive system safety research resides Aeronautics Research.
Self Declaration Protocol EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
CONSTELLATION National Aeronautics and Space Administration Ares Project Overview – Quality in Design Chris Cianciola Kenneth Crane.
Level 1 - LRO Requirements ESMD-RLEP-0010
Federal Aviation Administration 1 COE CST Overview August 16, 2011 Introduction to the FAA Center of Excellence for Commercial Space Transportation August.
Module 2.1 Finance and Administration Cabinet Organizational Changes and Agency Impact March
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Matching IT to People & Organizations
A3 Altitude Test Facility
Ares I-X Status July 30, Ares I-X Flight Test Overview  Ares I-X is a Constellation Program developmental flight test for the Ares.
Aeronautics Exploration Systems Space Flight Biological & Physical Physical Earth Science Space Science Education To Understand and Protect Our Home.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
2011 Key Issues Review Harnessing Aerospace Experience for Modern Earth and Climate Information Systems and Services Rick Ohlemacher Energy & Environment.
Path to Mission Concept Review
The Architecture Lecture September 2006 Cem Kaner CSE 1001.
Federal Aviation Administration 0 Certification Standards for New Technologies June 9, 2005 Certification Standards for New Technologies Presentation to:
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
Breakout Group 2: Software Quality Assurance Objectives and Goals 8/18/10 1.
 Management ◦ The activities and tasks undertaken by one or more persons for the purpose of planning and controlling the activities of other in order.
Lynn Garrison MSFC SBIR Program Manager NASA’s Mission To understand and protect our home planet To explore the Universe and Search for Life To Inspire.
National Aeronautics and Space Administration NASA Goddard Space Flight Center Software Engineering Division Space Weather Tools Update Marlo.
NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team)
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Constellation Space Transportation Planning Office July 30, 2009.
Federal Aviation Administration 1 COE CST Overview May 11, 2011 Introduction to the FAA Center of Excellence for Commercial Space Transportation May 11,
Federal Aviation Administration 1 COE CST Overview Presentation Federal Aviation Administration Introduction to the FAA Center of Excellence for Commercial.
SPACE SHUTTLE PROGRAM Space Shuttle Business Office NASA Johnson Space Center, Houston, Texas Presenter Date Page 1 Space Shuttle Program Flight and Ground.
Information Security IBK3IBV01 College 3 Paul J. Cornelisse.
Adrian Gardner, NASA GSFC CIO August 16, 2011 Strategic Computing Strategy for Goddard Space Flight Center.
NASA ARAC Meeting Update on Next Generation Air Transportation System May 3, 2005 Robert Pearce Deputy Director, Joint Planning & Development Office.
Decision Making Process Program Planning and Control Deana Hackfeld Management Systems Office November 17, 2006.
National Aeronautics and Space Administration Marshall Space Flight Center Launching the Future of Exploration and Science Robert Lightfoot.
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
Marshall Space Flight Center
Roadmap for Long Term Sustainable Space Exploration and Habitation Defining the Functional Requirements for Early Phase of Space Habitation AIAA 2015-????
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
SAS_05_Contingency_Lutz_Tal1 Contingency Software in Autonomous Systems Robyn Lutz, JPL/Caltech & ISU Doron Tal, USRA at NASA Ames Ann Patterson-Hine,
1 JAMSS - Japan Manned Space Systems Corporation Safety and Product Assurance Department Software IV&V team Haruka Nakao ISERN Head.
1 SAS ‘04 Reducing Software Security Risk through an Integrated Approach David P. Gilliam and John D. Powell.
IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center
1 Federal Emergency Management Agency Charlie Hoffman Disaster Operations Directorate Chief, DEC Programs Disaster Emergency Communications National Public.
Apollo was a three-part spacecraft: 1. Command Module (CM)- held the crew's quarters and flight control section 2. Service module (SM)- for the propulsion.
Federal Aviation Administration 1 COE CST Presentation at ESIL-1 October 26, 2011 Federal Aviation Administration Introduction to the FAA Center of Excellence.
1 Jefferson Lab Organization – December 2009 Director Accelerator Science Advisory Comm. Nuclear Physics Program Adv. Comm. Photon Science Program Adv.
Engineering and Science Directorate Organization Structure June 2016.
A&AE 450 – Senior Design Avionics March 6, 2001 Wiyan Wong.
Software and Systems Integration
GASS Organizational Structure
Level 2 Requirements (MRD)
Systems Engineering Management
LRO SRR Planned for 8/16-18/2005.
Key Benchmarks in a LEO Economy Robert L. Curbeam Jr.
An Assessment of Space Shuttle Flight Software Development Processes
DOE Review of the LCLS Project October 2006
GLAST Large Area Telescope:
Presentation transcript:

National Aeronautics and Space Administration 1 GRC All-Hands Meeting 1 May 2006

National Aeronautics and Space Administration 2 Organizational Issues Lack of focus for advocacy and execution of space-related projects within and outside of GRC Current matrix organization requires PM to coordinate with too many managers to get the work organized and executed. Redesign the GRC Organizational structure to consolidate discipline expertise and establish clear lines of communication, responsibility, and authority necessary to perform a major space flight development assignment Flight software is embedded in the CIO Office (unique to GRC).

National Aeronautics and Space Administration 3 Restructuring Guidance Form a Space Flight Systems Development Directorate (addresses a concern in the GRC assessment). Consolidate all systems engineering in a new Engineering Directorate (addresses concerns in the assessment). Move Software Engineering to Engineering Directorate (addresses concern in the assessment). Move Computing Science from CIO to appropriate organizations in Engineering and in Research and Technology (addresses concern in the assessment). Merge Aeronautics program management structure into Research and Technology.

National Aeronautics and Space Administration 4 Space Flight Systems Directorate CEV Projects Office CLV Projects Office Constellation Level II Support Office Advanced Plans & Programs Office Advanced Cryogenic Propulsion Office Nuclear Propulsion & Power Projects Office Business & Operations Future projects

National Aeronautics and Space Administration 5 Space Flight Systems Directorate CEV Projects Office CLV Projects Office Constellation Level II Support Office Advanced Plans & Programs Office Advanced Cryogenic Propulsion Office Nuclear Propulsion & Power Projects Office Business & Operations Future projects SE&I T&V SR&QA Service Module Command Module Subsystems & integration Spacecraft Adaptor US SE&I US Avionics US structure/Thermal US TVC J-2 Testing MSFC Engr Support ADFT-0 Lvl I support External Partnerships Integration & Strategy Adv Concept studies RLEP, EDS. LSAM Communications/outreach Green Propulsion Cryo Fluid Management Surface Power Nuclear Thermal Prop Future projects RLEP

National Aeronautics and Space Administration 6 GRC CEV Project Office (DRAFT) Requirements, I/F & Validation Integrated Design and Analysis Program Integration (1.1) GRC Project Lead Manager: Deputy: Matrix Direct (16) (1.2) Vehicle Integration Manager: Deputy: (1.1) Program Planning & Control Manager: Administrative Schedule Integration Business/Resource Integration Procurement (1.6.1) Crew Module Manager: Deputy: (1.10) Vehicle Test & Verification Manager: Deputy: Integrated Testing Abort System Flight Tests IV&V Seal Dev. for CEV TPS CM Thermal Protection CM Flight Software ADBS/LIDS CM Fire Det. and Suppress. Displays and Controls SM Integration Thermal Propulsion Mechanics and Pyro Power Structures Flight Dynam / GN&C ECLSS CE: (1.6.2) Service Module Manager: Deputy: GRC CEV Project Office (DRAFT) v1.1 C&DH SW Comm and Track Spacecraft Adapter Test and Verification Production and Assembly Ops (Ground & Flight) Safety and Mission Assurance Manager:

National Aeronautics and Space Administration 7

National Aeronautics and Space Administration 8 Next Steps Complete design of Engineering Directorate Complete consolidation of Aeronautics research and program management into Research and Technology Move personnel in appropriate organizations …