Measure L Program Implementation Management Considerations Report to the Board of Trustees San Joaquin Delta Community College District July 13, 2004.

Slides:



Advertisements
Similar presentations
Presenters Scott Gaudineer, Program Executive Caldwell Flores Winters
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Construction Project Coordination Presented by: Philip H
Organization of Primary Entities
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Bond Program Planning Imperatives Study Session October 12, 2004.
P ROJECT M ANAGEMENT The FORE SIGHT Partners. The FORE SIGHT Partners 2 Owner Support Professional Services The FORE SIGHT Partners.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Facilities Excellence Project Delivery Methods Board of Trustees April 12, 2005.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Click here to add text The Single Prime Contractor Delivery Method Ohio School Facilities Commission Ohio Construction Reform.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
A Match made in Heaven? Connecting you with a builder.
Building a Special Education Infrastructure Through a Joint Power Authority.
Your Deliver Method... …Pick it Early
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Delivering School Construction Successfully Regardless of the Delivery Method Presented by: Doug Sitton, PE, LEED AP Sitton Construction Group.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Construction Engineering 221 Drawings and Specifications.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Project Delivery Options in the California Construction Market CSI Fresno Chapter - February 16, 2010 PROJECT DELIVERY OPTIONS in the CALIFORNIA CONSTRUCTION.
Construction Contracts and Project Delivery Methods
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
Agency Construction Management :CM NOT AT-RISK
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Alternate Procurement & Funding in Washington State Erin L. Anderson Stoel Rives LLP February 12, 2008.
You passed the Bond or secured some funds What do we do now? 2014.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
UTILIZING CONSTRUCTION MANAGER AT RISK IN GREENSBORO, NORTH CAROLINA.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Alternate Project Delivery Systems for Governments.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Capital Facilities Program Update San Rafael City Schools 10 May 2016.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, all rights reserved.
CHANGING PROJECT DELIVERY SYSTEMS
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
2016 SAME Small Business Conference - Atlanta
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Lease-Leaseback Project Delivery Method
Enterprise Content Management Owners Representative Contract Approval
CHANGING PROJECT DELIVERY SYSTEMS
Design-Build Process Utilizing Negotiated Selection
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
Design-Build Acquisition and Contract Incentives July 19, 2018
Construction Project Delivery Methods
Design-Build Acquisition and Contract Incentives May 9, 2019
Presentation transcript:

Measure L Program Implementation Management Considerations Report to the Board of Trustees San Joaquin Delta Community College District July 13, 2004

Areas of Discussion  I.Program Management  II.Project delivery options  III.Program Planning Process

Source: CMAA I. What is Program Management?  Program Management is the practice of professional construction management applied to a capital improvement program of one or more projects from inception to completion. Comprehensive construction management services are used to integrate the different facets of the construction process - planning, design, procurement, construction and activation - for the purpose of providing standardized technical and management expertise on each project.

I. What is Program Management? Major Program Elements Construction Design Cost Ed Specs Finance Risk O&M Safety Sites Master Plan Com- munity Schedule DSA Program Management Technology

Characteristics of Large Programs  Large and complex, focused on deferred needs Dozens to hundreds of simultaneous projects or activities Multifaceted client with multiple agenda  Administrators, teachers, students, community Complicated entitlement process  State Architect  Fire Marshall  Environmental compliance…

Program Management  Provides staff resources and management expertise Pre design planning & Programming Design mgmt. Schedule Control Quality oversight Web-enabled MIS Public Relations Vendor outreach Budget Control Procurement mgmt Const. Oversight Move management Startup and Commissioning

II.Project Delivery Methods  Traditional Design-Bid-Build  Multiple-Prime Contracting  At-Risk Const. Management  Design-Build  Design-Build with Bridging  Lease – Lease Back Many variations on each major theme No single delivery method is best under all circumstances Most methods can be tailored to fit local procurement laws GC selection thru Low Bid CM/GC selection thru QBS process

Written requirements Design drawings Construction Drawings Occupancy The cost of a change in a project increases by a significant factor each time the project changes its state. Construction The cost of making changes

City Planning EPA Agency Chamber of Commerce Department Streets & Highways Beautification Commission Unions OSHA Fire MarshallPublic Works Street and Highways ADAEPAHistorical Preservation The Information exchange process

Change Orders  Change orders are not a function of the delivery method.  Change orders are a function of: Clear and concise plans and specifications Early involvement and interaction between A/E and CM Pre-project planning: programming, logistics, scheduling, budget development, and design review

Design-Bid-Build

Source: CMAA Design-Bid-Build  Pros Easy to Manage Roles are clear Most common and widely understood methodology Greatest amount of control for Owner.  Cons Little designer-constructor collaboration Implicit warranty to contractor in plan content Greater risk to Owner for claims Contractor pursues a least-cost approach. No incentive for repeat business Defined: The Owner engages a designer to prepare the design of the complete facility, including construction drawings, specifications and contract packages.

Agency based Construction Management

Design-Build

Design-Build with Bridging

Design-Build  Pros One contract with both designer and builder. Construction practicality added to design process. Owner gets enforceable price sooner Time frame can be compressed.  Cons Less Owner Control as price is agreed upon prior to completion of final design documents. A Paradox:  It’s hard to define work to be done for an agreed upon price without design.  If design is done, it’s not Design-Build Solution = Bridging  Owner hires initial A/E to “scope” project prior to hiring Design-Build team. Note: Limited availability within CCC system. Defined: Following an extensive project definition phase, the Owner procures one contract for both design and construction.

Multi-Prime Contracting

Source: CMAA Multi-Prime Contracting  Pros more control over the project schedule CM hired thru QBS process. Greater local participation (thru individual trade contracts) Owner can realize savings by directly procuring major material items,  Cons final cost of the project is not known until the final prime contract is procured Areas of Risk:  absence of overall authority and coordination once construction is underway  Often results in delay issues arising. Defined: Owner holds separate contracts with contractors of various disciplines, such as general construction, structural, mechanical, and electrical. Owner, or its CM, manages the overall schedule and budget during the entire construction phase

At-Risk Construction Management

Source: CMAA At-Risk Construction Management  Pros Fosters collaboration between contractor and designer. CM carries Risk of Trade Contractor Performance Greater local participation (thru individual trade contracts)  Cons CM role evolves once construction is underway from Agency to Vendor role Interests and stake holding can become similar to the traditional design-bid-build system Defined: CM provides advisory professional management assistance to the owner during the project planning phase. CM then guarantees completion of the project for a fixed, negotiated price following completion of the design

Lease / Lease-Back Owner CMDeveloper DesignerBuilder

Lease / Lease-Back Defined: A project finance concept whereby the Public Entity leases the site to a contractor/developer and the contractor/developer leases the site back to the agency.  Pros  Contractor/Developer can be selected thru QBS  Can facilitate early contractor involvement in design  Agreement can carry a GMP  Can ease funding problems  Cons  Many Districts utilizing this method have sought Court validation  Some funding agencies may not allow capital funds to be used in lease type arrangement  Not widely used within CCC system.  Potential Public Policy issue Other: Trade Contractors can be privately bid

III. Program Planning Process