Integrated Visual Design (IVD)  Cam Campbell  P.Ag.  MBCSLA  University of Reading Presentation - February 18 th 2002 The Bear Lake Integrated Visual.

Slides:



Advertisements
Similar presentations
Forest Legacy Assessment of Need Identifying Future Forest Legacy Areas Governors Commission for Protecting the Chesapeake Bay through Sustainable Forestry.
Advertisements

Project L.O.F.T. Report May 2007 through October 2007 Creating a design to meet stakeholder desires and dissolve our current set of interacting problems.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Maines Sustainability Solutions Initiative (SSI) Focuses on research of the coupled dynamics of social- ecological systems (SES) and the translation of.
Marmot Creek Research Basin 50 th Anniversary Workshop March , 2013 John Diiwu Forest Management Branch Alberta Environment and Sustainable Resource.
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
Identify Problems, Planning Objectives and Constraints.
1 Landscape Unit Planning Guide Training 2 Agenda for the day 8:30 AM - 4:30 PM - opening remarks - introduction - wildlife tree retention - review principles.
Lesson 1 ODOT Simple Models. Simple Models Learning Outcomes As part of a group, develop conceptual models of REC, stressors, and a highway project Identify.
LECTURE XIII FORESTRY ECONOMICS AND MANAGEMENT. Introduction  If forestry is to contribute its full share to a more abundant life for the world’s increasing.
Ecosystem Approaches To Conservation Photo from Wikimedia Commons.
Principles of Landscape Ecology ENVS*3320 Instructors: Dr. Shelley Hunt (Module 1) Rm. 2226, Bovey Building x53065 Dr. Rob Corry (Module.
The German Administration Basic structure NATIONAL LEVEL ADMINISTRATION MUNICIPAL (LOCAL) LEVEL ADMINISTRATION STATE LEVEL ADMINISTRATION.
1 OLD GROWTH RETENTION. 2 Planning for Old Growth Retention Goals –Spatially locate and map OGMAs based on – maximizing biological effectiveness within.
FNR 407 Forest Economics William L. (Bill) Hoover Professor of Forestry
Usability 2004 J T Burns1 Usability & Usability Engineering.
ESRM 450 Wildlife Ecology and Conservation ECOSYSTEM-BASED MANAGEMENT CONCEPTS AND APPLICATIONS.
A Toolkit Approach to Modeling Sustainable Forestry Maximize innovation and minimize re-invention Andrew Fall Landscape Systems Ecologist School of Resource.
9 1 Chapter 9 Database Design Database Systems: Design, Implementation, and Management, Seventh Edition, Rob and Coronel.
Notice: The views expressed here are those of the individual authors and may not necessarily reflect the views and policies of the United States Environmental.
Community-based Education K-12 students serving as a resource for meeting community needs.
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
An overview of a few of the methods used in landscape ecology studies.
Problem Definition Exercise. U.S. Fish & Wildlife Service General Summary Responses from ½ of those surveyed (n=14/31) Broad and narrow in scope Narrow.
GENERAL AWARENESS TRAINING BCTS SFM Commitments BC Timber Sales is committed to managing and administering forest management activities on our operations.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
Burl Carraway. Purpose of Redesign Shape and influence use of forest land on a scale and in a way that optimizes public benefits from trees and forests.
US FOREST SERVICE REGIONAL ROUNDTABLE Planning Rule Revision Photographer: Bill Lea.
Measuring Habitat and Biodiversity Outcomes Sara Vickerman and Frank Casey September 26, 2013 Defenders of Wildlife.
1 Cumulative Impact Management: Cumulative Impact Indicators and Thresholds Presented by: Salmo Consulting Inc. and AXYS Environmental Consulting Ltd.
Northeast Landscape Plan Update Trends Exploration University of Minnesota Boreal Forest and Community Resilience Project June 12, 2012.
Proposed Action Purpose and Need A proposal to authorize, recommend, or implement an action in response to the need identified in the Purpose and Need.
Atlin/Taku Land Use Planning Forestry Chapter Presentation to Multiparty Workshop #4 June 19, 2009.
Methods and Tools to Integrate Biodiversity into Land Use Planning
Flintstone-Oldtown Planning Region Comprehensive Plan Kick-Off Meeting June 23, 2010 Insert pictures.
The WLP must be consistent with these objectives 1.maintaining or enhancing an economically valuable supply of commercial timber from the woodlot licence.
Points made in discussions What interests and values in the landscape do we want to monitor? Integrated landscape approach takes account of different landscape.
Watershed Assessment and Planning. Review Watershed Hydrology Watershed Hydrology Watershed Characteristics and Processes Watershed Characteristics and.
 Goals & Objectives ◦ Goal is to set a general framework for the project  develop the expected result or outcome of the project  (e.g.) The trail design.
Elkhorn Slough Tidal Marsh Plan: Possible Lessons from the Bay Area Wetland Ecosystem Goals Project Joshua N. Collins San Francisco Estuary Institute
Role-Based Guide to the RUP Architect. 2 Mission of an Architect A software architect leads and coordinates technical activities and artifacts throughout.
Ecological rationale for determining buffer width Forest Ecosystem Management and Assessment Team (FEMAT) Report.
Wisconsin’s Forests and the Comprehensive Planning Law Preserving forests in the wilderness of Smart Growth.
Decision-making 2: Dilemmas in Designing Forest Practices Rules 1
Illustrations and Answers for TDT4252 exam, June
1  Updated themes  Decision-making theories Case: 6% solution  policy design  Tools - instrument choice  Configuration  Forest.
Critical Loads and Target Loads: Tools for Assessing, Evaluating and Protecting Natural Resources Ellen Porter Deborah Potter, Ph.D. National Park Service.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Atlin-Taku Land Use Plan Resource Chapters Update Presentation to Multiparty Workshop #6 Atlin Rec Centre, Nov 27-28, 2009.
Jonathan Long and Carl Skinner With Contributions from the Science Synthesis Team USDA FS Pacific Southwest Research Station SocialEcological.
Landscape Ecology: Conclusions and Future Directions.
Forest Practices Code Transition Protection of Environmental Values Rod Davis Manager, Ecosystem Planning and Standards Ministry of Water, Land and Air.
MODEL-BASED SOFTWARE ARCHITECTURES.  Models of software are used in an increasing number of projects to handle the complexity of application domains.
12 July 2010 NYS Department of Environmental Conservation Division of Environmental Permits Critical Environmental Areas Under SEQR What Do They Mean?
Landscape ecology methods
UNIT IV JOB CHALLENGE. DEFINITION According to McCauley et al, “Job challenge is being in dynamic setting with problems to solve and choices to make under.
1 ABCFP Policy Review Seminar 2009 Forest and Range Practices ABCFP Policy Review Seminar 2009: Forest and Range Practices.
The Concept of the “CLIOS Process”: Integrating the study of physical and policy systems using Mexico City as an example Presentation to the Engineering.
1 RESULTS BASED CODE. 2 Results Based Code Timeframes Introduce “package” this session –F&RPA –Amendments to FPC (streamlining) –Biologist’s Act –Amendments.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Introduction to Environment. Environment : from the French word ‘environner ‘- to encircle or surround Whatever is around us constitutes our Environment.
Restoration Under a Future Climate Understanding and managing climate change effects on federal lands Dr. Cynthia West, Director Office of Sustainability.
Highlights  Describe Our Missoula Growth Policy Project  Relationship to Rattlesnake Neighborhood Plan  Next Steps.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Introduction to Environment. Environment : from the French word ‘environner ‘- to encircle or surround Whatever is around us constitutes our Environment.
Grade 6 Outdoor School Program Curriculum Map
Landscape Approach to Resource Management
RPTS 402 Park Planning & Design
Landscape ecology methods
Presentation transcript:

Integrated Visual Design (IVD)  Cam Campbell  P.Ag.  MBCSLA  University of Reading Presentation - February 18 th 2002 The Bear Lake Integrated Visual Design Plan Case Study BC Ministry of Forests Forest Practices Branch Penticton Forest District

Context – Why Integrated Visual Design? Catalysts  Strategic land and resource planning initiatives  BC Forest Practices Code 1995 (et al)  And now --- FRPA (2002) Issues  Licensees avoiding VSA’s– Realization its not business as usual!  Conventional forest planning approaches were not working well in VSA’s (short time horizons, poor designs, not optimising timber op’s etc.)  Recognized an approach / tools required that addressed the visual design component in an integrated manner (e.g. functional considerations, etc resolved at same time.) Genesis of IVD  Mof / Forestry Commission collaboration (Simon Bell et al)

Integrated Forest Design - Antecedents  Integrated landscape analysis methods (McHarg, Hill et al – 1960’s)  Forestry Commission - Forest Landscape Design Process (Crowe, Lucas and Bell)  USDA Forest Service - Landscape Analysis and Design Process (Diaz and Apostal)  Total Chance Planning / IRM (various jurisdictions)  BC Ministry of Forests - Integrated Visual Design / Total Resource Design Processes (Marc, Bell, Campbell, Rennie et al).

The IVD Process  Follows a classic landscape planning approach of setting objectives, inventory, analysis, design, evaluation and documentation / revisions.  Incorporates TRD / Total Chance Planning concepts  Considers all dimensions of landscape simultaneously (functional / economic / ecological / aesthetic)  Incorporates both creative and analytical decision making processes  Uses plan and perspective design methods simultaneously to aid in design / understanding for impacts

The Bear Lake IVD Case Study

Aims 1.To test / evaluate the IVD process in action 2.To provide strategic direction for the long-term development / optimisation of timber resources adjacent to Bear Lake given visual and other constraints. Desired Outputs:  1 st pass harvest / landscape development concept that achieved visual quality and other HLP objectives

Project Context Institutional Context  Situated in South Central BC, 20 km. from the City of Kelowna in the Okanagan Valley  Area part of BC. Ministry of Forests Small Business Programme  Land use / resource management governed by higher level plan (Okanagan LRMP)  Broad range of recreational, visual, environmental, wildlife and timber resources and values.  Plan assembled by Ministry of Forests team and consultant designer

Project Context 1600 ha. Planning area Visually sensitive steep, west facing slopes along lakeshore IDF / MS BGSZ NDT 3 (frequent stand initiating events) Extensive Pl and Fd Commercial recreation interests MoF recreation site Community Watershed Moose Winter Range Fish resources (stream and lake)

Project Context Viewpoint A (Rec. Site – North End of Bear Lake Viewing East Viewpoint D (South End of Bear Lake Viewing North)

Phase 1:Setting Design Objectives

Higher Level Planning  Direction derived primarily from Okanagan / Shuswap LRMP and FPC– this includes objectives relating to:  Biodiversity / ecosystem function  Recreation  Forest Health  Visual Landscape (VQO R-PR / M in backcountry)  Fish and wildlife  Access management  Community water supply / quality  Riparian management  Timber development  Other area specific objectives were identified by members of the design team. (e.g 1 st pass volume)

Phase 2:Landscape / Resource Inventory Disassembling the Landscape 1.Inventory of Key Influences 2.Mapping 3.Visibility 4.Landscape Character

Abiotic, Biotic and Cultural Influences  Forest cover (age class, species, volume, density, site index)  Operability criteria  Harvest criteria  Biogeoclimatic zones  Forest Health  Natural disturbance types  Recreation  Visibility / landscape character  Fish and wildlife habitat  Terrain hazards  Riparian influences  Existing use  Adjacent land uses  Archaeology  Access  Slope  Regulatory  Community watershed  Soils  Stand dynamics  Hydrology  Aspect  Trails  Trap-lines

Inventory / Mapping of Landscape Influences

Visibility Analysis

Landform and Landscape Character Analysis -

Phase 3:Landscape Analysis Defining Landscape Structure / Understanding Interactions Re-assembling the Landscape 1.Composite Constraints 2.Design Units 3.Opportunities and Limitations 4.Area Specific Issues / Objectives Strategies 5.Design Guidelines Often Known as the So What! Phase

Composite Constraints Aim - to define broad patterns in operability -- the fixed / variable aspects of landscape

Composite Constraints Design Planning Units Aim – Organize inventory information in a meaningful manner – identifying areas of relatively homogeneous site characteristics and then describing each in terms of inventory information Forms the basis for an Opportunities and Limitations analysis

 For each Design Unit, interactions among landscape influences are made explicit in terms of opportunities or limitations to development  Suggests how landscape design is constrained / enhanced by landscape influences  Begins to suggest strategies / ideas for how specific areas might develop and change over time Opportunities and Limitations

 Design Issues, objectives and strategies specific to each design unit were identified. These: 1.formed the basis of the design programme; 2.guided the scope and nature of the design exploration occurring in subsequent phases of the project. 2.Expressed strategies for addressing issues / objectives Issues, Objectives and Strategies

Phase 4:Landscape Design Phase Translating Design Direction into Physical Form

Design Concept Composite Constraints Conceptual Design Diagram Documents the loose ideas about how the area might develop formed during the analysis phase Serves as a bridge between the analysis and detailed design phases Expressed quickly as bubble diagrams / sketch plans. – includes annotation about harvest and silvi. Systems, access, levels of retention within stands etc.

Harvest Design Studies The issues / strategies identified in the previous stage informs the design exploration of individual cut-blocks – The Design Concept provides a broad framework within which this occurs Aim – design of a complete pattern of harvest shapes to a reasonable level of resolution and detail (paper location / design) It is an iterative process involving much trial and error – quickly exploring and testing ideas to arrive at a balanced solution

Unit Design Guidelines When designing the individual harvest units, ideas form about how to employ retention patches, boundary configuration etc. to address visual quality or other objectives. These are captured as design guidelines that can assist the engineer in their detailed paper / field design and layout.

Conceptual Harvest Design (Total Chance) Ultimately, a workable pattern of harvest units is developed to a reasonable level of detail (scheduling, boundaries, possible access, harvest system, outputs) This can be modeled and evaluated to test its fitness in the context of project objectives

Evaluating and Testing the Design

1 st Pass Development

Summary of IVD Relationship Between Phases and Steps

Observations and Summary – The Good  Organizes, summarizes and manages large amount of information in meaningful manner  Design decisions occur in an integrated manner rather than the traditional approach of “taking the landscape to bits” and then prescribing an action for each element (as per current practice); - Design evolves from landscape / cultural influences  Reduces complexity of problem by breaking the larger problem down into smaller more manageable problems which, when solved, contribute to the resolution of the whole  Process is transparent and graphic allowing for public / agency / NGO scrutiny  Process is versatile and can be employed at varying scales – from site to landscape scale  Well suited to FRPA structure (strategies and results)  Provides managers with greater operational flexibility in constrained areas by identifying all possible development opportunities (in context of resource / regulatory constraints)

Observations and Summary – The Challenging  Demands longer term thinking  Requires visual communication and modelling technology / expertise  Requires expertise that is not traditionally part of the profession of forestry (e.g. design methods) – suggests additional expertise required (e.g. Larcs) .