CENTRAL EUROPE PROGRAMME 2007-2013 SUCCESS FACTORS FOR PROJECT DEVELOPMENT: focus on activities and partnership JTS CENTRAL EUROPE PROGRAMME.

Slides:



Advertisements
Similar presentations
TVET working group contributions. What are the possible options for obtaining decent living and working conditions without joining the informal economy?
Advertisements

WP4 – 4.1 and 4.2 Preparatory activities for the creation of the WATERMODE permanent network 1 Technical Committee Meeting Venice, June 24-25, 2010 VENETO.
Building Capitalisation in MED TNC Naples, 16 November 2009 Andrea Stocchiero, CeSPI.
The Operational P The Operational Programme adopted by the European Commission The ESPON 2013 Programme EUROPEAN UNION Part-financed by the European Regional.
The concepts/mechanisms/tools for developing a Joint Programme: Critical issues and UNDG Joint Programme Guidance and formats.
Main project Calls How to Apply Seminar 29th February 2012 – Copenhagen Christopher Parker.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Launch of the 2 nd call for proposals CENTRAL EUROPE PROGRAMME Barbara Di Piazza JTS CENTRAL EUROPE PROGRAMME National Info Day Bologna, Italy.
Implementation of Axis 4 Leader Programme Measure 421 In Romania 2012.
Regional Policy Managing Authorities of the ETC programmes Annual Meeting W Piskorz, Head of Unit Competence Centre Inclusive Growth, Urban and.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
Application Form – Part C Kirsti Mijnhijmer, Secretariat How to Apply Seminar 4th February 2015, Copenhagen, Denmark.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
CENTRAL EUROPE PROGRAMME SUCCESS FACTORS FOR PROJECT DEVELOPMENT: focus on finances Partner Search Forum Poznań, Poland 16 – 17 December 2008.
Cooperation in the mainstream programmes / article 37-6b example of Limousin (France) ‏ inhabitants inhabitants 43 inhab / km² 43 inhab.
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
Innovation in the Rural Development Networks Directorate General for Agriculture and Rural Development Matthias Langemeyer & Iman Boot.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Application Form Part 1, Sections 4-9 How to Apply Seminar 16 th September 2010 – Copenhagen Kirsti Mijnhijmer.
Contribution of the Territorial Cooperation Programmes to the EU Strategy for the Danube Region Kiril Geratliev, Director General “Territorial Cooperation.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
Cooperation in the mainstream programmes / article 37-6b example of Limousin (France) inhabitants inhabitants 43 inhabitant / km2 43 inhabitant.
PROSPECTS FOR FUTURE COOPERATION WITHIN LATVIA-RUSSIA ENI CBC PROGRAMME ILZE KRIEVA EST-LAT-RUS Annual event, Gatchina, 2014.
1 European Union Regional Policy – Employment, Social Affairs and Inclusion The new architecture for cohesion policy post-2013 High-Level Meeting on the.
CENTRAL EUROPE PROGRAMME Barbara Di Piazza JTS CENTRAL EUROPE PROGRAMME CENTRAL EUROPE INFODAY Venice, 4 March 2008.
European Commission Enterprise and Industry | | ‹#› Public Procurement Networks and the Lead Market Initiative Tallinn, 25 November 2008 European.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Assessment of project proposals within EU grant schemes 17 & 18 December 2013 Government Office for Cooperation with NGOs Zagreb VLADA REPUBLIKE HRVATSKE.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
Strategic project Call and themes for the Seventh Call How to Apply Seminar 16 th February 2011 – Copenhagen Christopher Parker.
Result Orientation in Interreg CENTRAL EUROPE Annual Meeting, Luxemburg, 15 September 2015 Monika Schönerklee-Grasser, Joint Secretariat.
National Info Day 1st call of Interreg DANUBE 9 th October 2015 Prague.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October/December2008.
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October 08/January 09.
1 EUROPEAN FUNDS IN HALF-TIME NEW CHALLENGES Jack Engwegen Head of the Czech Unit European Commission, Directorate General for Regional Policy Prague,
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
Results Focus & Partnership Kirsti Mijnhijmer, Secretariat How to Apply Seminar 1st October 2014, Strathpeffer, Scotland.
"The challenge for Territorial Cohesion 2014 – 2020: delivering results for EU citizens" Veronica Gaffey Acting Director EUROPEAN COMMISSION, DG for Regional.
Leader+ Observatory Seminar ‘The Legacy of Leader+ at local level: Building the future of rural areas’ April 2007 Cap Corse, Nebbiù è Custera, Corse,
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
04/2007 THE EUROPEAN ENVIRONMENT POLICY & ITS INSTRUMENTS OF IMPLEMENTATION Preparation & Draft of environmental projects THE EUROPEAN ENVIRONMENT POLICY.
The EU Water Initiative and the EU ACP Facility New Instruments to promote sustainable development of water resources and affordable access Antonio Garcia-Fragio.
1 Second call for proposals – National Information Day EUROPEAN REGIONAL DEVELOPMENT FUND Benoît Dalbert, Project Officer, Joint Technical Secretariat.
CENTRAL EUROPE PROGRAMME PROJECT DEVELOPMENT FINANCIAL ISSUES Project development seminar Prague, 1 st February 2010 Luca FERRARESE JTS CENTRAL.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
Project design – Activities and partnership CENTRAL EUROPE PROGRAMME Project development seminar Prague, 1-2 February 2010 Monika Schönerklee-Grasser.
EUROPEAN NEIGHBOURHOOD AND PARTNERSHIP INSTRUMENT - ENPI CROSS-BORDER COOPERATION PROGRAMMES.
CENTRAL EUROPE PROGRAMME WORKSHOP A: Preparing an application – focus on activities and partnership Project development seminar Prague, 1-2 February.
Exploitation means to use and benefit from something. For Erasmus+ this means maximising the potential of the funded activities, so that the results are.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Eligibility and evaluation
EUSDR Strategic Projects & Seed Money Facility in DTP
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
Interreg V B Adriatic-Ionian Seminar for Applicants
Cross-Border-Cooperation in
Application Form Sections 4-9 Christopher Parker & Kirsti Mijnhijmer 28 January 2009 – Copenhagen, Denmark European Union European Regional Development.
The ERA.Net instrument Aims and benefits
Application Form – Part C
The Role of Bilateral Donors in supporting capacity-building in the area of ICT Open Consultations on Financing Mechanisms for Meeting the Challenges.
Helene Skikos DG Education and Culture
ENI CBC Joint Operational Programme Black Sea Basin
EU Cohesion Policy : legislative proposals
Juan Gonzalez eGovernment & CIP operations
Commission proposal for a new LIFE Regulation CGBN meeting
Project intervention logic
INFORMATION SEMINAR Interreg V-A Latvia-Lithuania programme
Project intervention logic
Presentation transcript:

CENTRAL EUROPE PROGRAMME SUCCESS FACTORS FOR PROJECT DEVELOPMENT: focus on activities and partnership JTS CENTRAL EUROPE PROGRAMME

OVERVIEW Expected projects characteristics Key success factors for project development – Assessment criteria Source of information for applicants

EXPECTED PROJECT CHARACTERISTICS (1/2) Transnational thematic focus and partnership Coherent approach Effective management (including communication strategy, knowledge creation and transfer) Strive for concrete and visible outputs and results and actual implementation Clear added value

CENTRAL EUROPE will not support: Projects not addressing an issues of transnational relevance or that can be funded under one single cross- border programmes Pure research and technology development without clear links to other actors Mere continuation of past co-operation project without clear added value Mere networking and exchange of experience Project fundable under or other Structural Funds programmes EXPECTED PROJECT CHARACTERISTICS (2/2)

1.Relevance (what for?) 2.Partnership technical and operational capacity (who?) 3.Implementation and methodology (how?) 4.Quality of the outputs and sustainability of the expected results (what?) 5.Budget and cost effectiveness (how much?) TECHNICAL AND FINANCIAL ASSESSMENT CRITERIA

How relevant is the proposal to the overall programme goals and objectives? Does the proposal contribute to Lisbon and/or Gothenburg goals and how relevant is it to other EU and national policies? RELEVANCE: ASSESSMENT CRITERIA (1/2)

RELEVANCE: ASSESSMENT CRITERIA (2/2) How relevant to the need and constraints of the target regions and Areas of Intervention is the proposal? How clearly defined are the beneficiaries of the project results ? Does the proposal contain specific added value in terms of innovation?

Is the proposed partnership appropriate and relevant to the issues to be addressed? Does the partnership have sufficient technical expertise (notably knowledge of the issues to be addressed)? Does the Lead Partner have sufficient experience of project management? PARTNERSHIP: ASSESSMENT CRITERIA

Partners involved in the project should be relevant bodies actually competent for the development, implementation and dissemination of outputs and results. All partners should be involved in the project in a balanced way and be able to credibly outline benefits derived from the partnership and transnational cooperation. As a general rule, the bigger the number of partners, the more complex it is to manage the project. Therefore, only partners necessary to achieve the project objectives should be brought on board. Even if larger partnerships will not be excluded, the recommended maximum number of partners is from 8 up to 12. PARTNERSHIP: CHARACTERISTICS

Is the Project design (proposed methodology) appropriate? Are the work plan and timetable realistic, coherent and transparent? (When applicable: coherence and feasibility of the preparation of pre-investments; coherence and feasibility of the preparation of investments) Are management and coordination structures efficient and transparent? IMPLEMENTATION & METHODOLOGY: ASSESSMENT CRITERIA

IMPLEMENTATION & METHODOLOGY: WORK PLAN STRUCTURE WORK PACKAGE – ACTION - OUTPUTS – CORE OUTPUTS WP: WP0: Pre-defined, WP1, WP2: Pre-defined & compulsory o WP3-WP6: self-defined by project Actions: o WP1-2: up to 4 actions o WP3-6: up to 6 actions Outputs: o 1-20 per action o Tangible deliverables (studies, seminars, folders, etc.) Core Outputs and their results: o 0-4 per action (at least 1 per work package) o Major outputs produced by project o Have to correspond to „Types of Action“

IMPLEMENTATION & METHODOLOGY: TYPE OF ACTION Type of ActionStandard Core Output Indicators Joint transnational strategy and action plan  No. of strategies/policy documents developed/ improved  No. of strategies/policy documents implemented/adopted Transnational tool development  No. of new tools developed  No. of new tools implemented  No. of trainings for new tools prepared or implemented Joint management establishment  No. of permanent cooperations established  No. of permanent management structures established Investment preparation  Volume of investment prepared  No. of jobs to be created through these investments  Volume of private/public funds leveraged Pilot Actions including investments  No. of Pilot Actions implemented (including No. of investments realized)  Volume of investment realised through Pilot Actions  No. of jobs created through Pilot Actions

IMPLEMENTATION & METHODOLOGY: PATHWAYS TO INVESTMENT Pre-investment refers to the preparation of investments (Type of Action “Investments Preparation”) later to be funded through complementary sources. Pilot investments (Type of Action: “Pilot Action”) demonstrate the viability and effectiveness of an investment in order to pave the way for subsequent investments at a larger scale. The results of the pilot investment should be transferable and the transfer of results should form part of the project. Both pre-investments and pilots have to show a clear transnational added value.

Are Core outputs clearly defined and assumptions on the use of outputs (target groups, process assumptions) realistic? Are outputs and results transferable, replicable and useful beyond the partnership and the transnational boundaries? Are the expected results of the proposed action sustainable at institutional and financial level? Are the Communication and knowledge management strategies clearly defined and effective? OUTPUTS & RESULTS: ASSESSMENT CRITERIA

OUTPUTS & RESULTS: CORE OUTPUTS … provide the basis to communicate project achievements … should be supported by several sequential outputs. … are directly used by their target groups in order to achieve the intended results. … must be clearly related to one Type of Action It is not important to have a high number of CORE outputs, It is much better to have a few provided that they are meaningful.

OUTPUTS & RESULTS: SUSTAINABILITY OF RESULTS A distinction between the following 3 dimensions of sustainability has to be made: Financial sustainability - Financing follow up activities, sources of revenue for covering all future operating and maintenance costs; Institutional sustainability - Which structures will allow, and how, the results of the project to continue to be in place after the end of the action? Address issues about the local "ownership" of project outputs; Political sustainability - What structural impact will the project have? - e.g. will it lead to improved legislation, codes of conduct, methods.

Thank you for your attention!