Workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany 1 Future Communication between Outstations.

Slides:



Advertisements
Similar presentations
Delivering solutions Applying the Future Today - Intelligent Transport Systems (ITS) Presentation by Dr Adrian Withill Technical Director - WSP.
Advertisements

Migration Considerations and Techniques to MPLS-TP based Networks and Services Nurit Sprecher / Nokia Siemens Networks Yaacov Weingarten / Nokia Siemens.
Dr.-Ing. Lutz Rittershaus Federal Highway Research Institute ITS Standardisation in Germany CEDR COTS Team 1 st Meeting November 10, 2006 Amsterdam, the.
Overview What is the National ITS Architecture? User Services
Software Quality Assurance Plan
Hanover-Fair 2002 IEC The world-wide standard for communication in substations HM IEC   Substation Protocols Benefits Customer.
Chapter 3 Project Initiation
CNRIS CNRIS 2.0 Challenges for a new generation of Research Information Systems.
Environmental Council of States Network Authentication and Authorization Services The Shared Security Component February 28, 2005.
Workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany 1 Future Communication between Outstations.
Internet Protocol Security An Overview of IPSec. Outline:  What Security Problem?  Understanding TCP/IP.  Security at What Level?  IP Security. 
Lesson 11-Virtual Private Networks. Overview Define Virtual Private Networks (VPNs). Deploy User VPNs. Deploy Site VPNs. Understand standard VPN techniques.
A summary of the PSS-05 URD template
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
AMA FiT4HANA Designed for Big Data
Notes: For the installation of a PB network, you can use shielded twisted pair copper cable, glass or plastic FO and infrared components. And you can mix.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for Security.
Just a collection of WS diagrams… food for thought Dave Hollander.
Part-financed by the European Union Priority 2 of the BSR Programme External and internal accessibility of the BSR Ryszard Toczek, City of Gdynia.
1 The SpaceWire Internet Tunnel and the Advantages It Provides For Spacecraft Integration Stuart Mills, Steve Parkes Space Technology Centre University.
Intranet, Extranet, Firewall. Intranet and Extranet.
Michal Rapco 05, 2005 Security issues in Wireless LANs.
Section 11.1 Identify customer requirements Recommend appropriate network topologies Gather data about existing equipment and software Section 11.2 Demonstrate.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Chinese-European Workshop on Digital Preservation, Beijing July 14 – Network of Expertise in Digital Preservation 1 Trusted Digital Repositories,
Computers & Employment By Andrew Attard and Stephen Calleja.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
Security Baseline. Definition A preliminary assessment of a newly implemented system Serves as a starting point to measure changes in configurations and.
Supported byAn Executive Agency of Open Data applied to ITS : An overview of cities 29 th October 2013, Madrid An Introduction to UTMC Simon Beasley UDG.
ACM 511 Chapter 2. Communication Communicating the Messages The best approach is to divide the data into smaller, more manageable pieces to send over.
Federal Aviation Administration Federal Aviation Administration 1 Presentation to: Name: Date: Federal Aviation Administration AMHS Security Security Sub-Group.
European Corridor - Austrian Testbed for Cooperative Systems P4ITS Workshop, Vienna, 20/05/2015.
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
SCSC 311 Information Systems: hardware and software.
1 Section 10.9 Internet Security Association and Key Management Protocol ISAKMP.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Margherita Forcolin (Insiel S.p.A.) Thessaloniki, 13 October 2011.
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
O Meeting: o Presented By: o Date: This project is co-financed by the ERDF and made possible by the INTERREG IVC programme. Guías nacionales en Reino Unido.
Innovative data transfer in monitoring Urban Stenberg.
Information: Policy, Strategy and Systems Module Overview
Activities of BASt in the area of ITS Dr. Christhard Gelau Bundesanstalt für Straßenwesen/Federal Highway Research Institute (BASt) Department “Automotive.
Transboundary Trust Space February 16, 2012 Ensuring trust in information exchange – proposal and approaches from Russia and CIS-states (RCC states) National.
OS Services And Networking Support Juan Wang Qi Pan Department of Computer Science Southeastern University August 1999.
11 SECURING NETWORK COMMUNICATION Chapter 9. Chapter 9: SECURING NETWORK COMMUNICATION2 OVERVIEW  List the major threats to network communications. 
Grids - the near future Mark Hayes NIEeS Summer School 2003.
Expert Group 4 (EG4) on Certification of the Equipment related to the Directive 2004/52/CE Francisco R. Soriano LISITT- Univ. of Valencia.
11/24/2015Dr. SASTRY-PROJ SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D.
Intelligent Highways Infrastructure
Promoting excellence in social security Building on sector wide commonalities to enhance the benefits of Information.
S imple O bject A ccess P rotocol Karthikeyan Chandrasekaran & Nandakumar Padmanabhan.
David Smiley SOA Technology Evangelist Software AG Lead, follow or get out of the way Here Comes SOA.
Web Security Introduction (Some of the slides were adapted from Oppliger’s online slides at
Chapter 19: Building Systems with Assurance Dr. Wayne Summers Department of Computer Science Columbus State University
ICSTI Conference Innovation infrastructure of the CR Pavel Švejda Association of Innovative Entrepreneurship of the CR Prague,
Road Information System / Road Data Bank 10 April 2013 Lars Bergman M. Sc. In Civil Engineering Long Term Planning Swedish Transport Administration.
© Copyright 2002 TEM Consulting, LP - All Rights Reserved Presentation To GTRI Voting Technology WorkshopRev – 05/31/02 - HSB GTRI Future of Voting Technology.
SDLS Protocol Green Book initiation Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Web Services. Web Service: Simple definition : “ Service Offered On the Web “ Technically : “ A Web Service is a programmable application component that.
© International Road Transport Union (IRU) 2005Professional Driver Training Seminar Sep 2005Page 1 Professional Driver Training Seminar Driver Training.
Discussion on oneM2M and OSGi Interworking Group Name: ARC Source: Jessie, Huawei, Meeting Date: Agenda Item:
EasyWay - conclusion.
Chapter 1 Computer Technology: Your Need to Know
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
DATEX II Truck Parking from Scratch
Chapter 19: Building Systems with Assurance
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Presentation transcript:

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany 1 Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus Federal Highway Research Institute - BASt

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt Implementation of an ITS-system in Germany since about 30 years. 1975: VRZ Aichelberg 2005: VZ Hessen

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt Average daily traffic (ADT) on German highways.

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt Current and planned (till 2007) systems: km Section Management km Network Management Programme on traffic management for the federal motorways in Germany.

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt Foreign Traffic Centre Traffic Control Centre Sub-Centre Outstation Detectors, Variable Message Signs,... Directives TCC SC OS SC OS Regional Traffic Information Centre Communication interface to external Systems (e.g. Datex) Instructions for the Equipment of Traffic Control and Sub Centres (MARZ), "AK VRZ" Instructions for the Equipment of Traffic Control and Sub Centres (MARZ), "AK VRZ" Technical Specifications for Outstations (TLS) Traffic Control System Germany.

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt Roadside Outstation Traffic Control Centre / Sub-Centre TLS:Technische Lieferbedingungen für Streckenstationen / Technical Specifications for Outstations Basic idea of the TLS: n to define functional groups for roadside equipment, n to standardise the interfaces and communication protocols, n to create a common data modelling, n to make the equipment of different suppliers compatible, n to define and test performances and n to allow open and clear tendering and system operation. Interface between Outstations and TCCs.

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt Structure of TLS. n FG 0: Reserved for testing purposes n FG 1: Traffic data acquisition n FG 2: Weight in motion n FG 3: Environmental data acquisition n FG 4: Variable message sign and variable direction sign control n FG 6: Operational messages and control n FG 7: Control of external systems n FG 8: Speed control systems n FG 9: Ramp metering n FG 10 to 127: Reserved for subsequent universal definitions n FG 128 to 253: Res. for manufacturer defined function groups n FG 254: System control (internal) n FG 255: Reserved for special applications

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt Example of an Outstation.

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt n Preliminary Issue in 1988, content: Traffic data acquisition n Issue in 1990 with additional features on communication n Issue 1993: first complete edition, compulsory for roadside traffic control equipment n Main Draft in 1997 n Issue 2002: optimised, revised edition n Issue 2007 in preparation: new communication technique and additional features History of TLS.

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt n Communication restricted by infrastructure of the 80´s n Partyline n 1200 Baud n datagram size <256 bytes n Research projects: Recommendations for a new TLS u Communication technology u Technical u Organizational Constraints of todays TLS

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt n Recommendation: „TLS goes TCP/IP“ n Todays standard communication protocol n Austrian ASFiNAG: Adoption of TLS, but with TCP/IP extensions n NTCIP (USA) based on TCP/IP (UDP) n In-field communication: PROFIBUS -> PROFINET n TT: DATEX(2) TCP/IP

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt n With introduction of TCP/IP broad range of technologies available u Fiber optics u Twisted pair u WLAN u GSM/GPRS n Hard- and software vendors n Conclusion: Motorway communication infrastructure as network Hardware Infrastructure

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt n TLS-ISO/OSI Layer 7 n Actual TLS-datagramm description u Bits&bytes u Paperwork, not toolbased u Ambigous u Error-prone interpretation u Weak modelling Data Modelling (1/3)

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt Data Modelling (2/2) n Tool: UML as platform independent modelling language n TLS-datagrams as UML packages and class diagrams n TLS procedures as UML sequence diagrams n UML profiling for various aspects possible u XML profiles u SOA profiles (e.g CORBA, SOAP) u „old TLS“ profile (->backward compatibility)

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt n TCC/SC networks firewalled n IP communication between outstation and TCC/SC n Outstations become part of TCC/SC network n Potential breach of security n Recommendation: Tunneling (ssh/ssl) n Point-to-point communication: Portforwarding n Strong encryption: Verifies data integrity n Public-private-key authentication Security aspects

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt TCC/SC Applications SOAP/ TCP/IP application level gateway TLS-OSI 1-7 Migration Strategy TLS-OSI 1-7 outstation functional groups SOAP/ TCP/IP outstation applications field bus / party line network infastructure

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt n Concept based on TCP/IP n OTS communication hard- and software n Exact data modelling n Backward compatibility: Migration concept allowing for integration of old and new TLS infrastructure n Recommendation: Concept study of a TCP/IP/SOA(P)- based TLS system Consistent TLS-communication concept

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt This working group consists of representatives from: n Road operators (German road administrations) n Sensor and VMS manufacturer n Traffic control centre manufacturer n Engineering and consulting companies Creation of TLS. The further development of the TLS is be done by the AK TLS (Working Group TLS).

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt A modular loose-leaf document system allow the actualisation and release of single chapters without releasing a complete new edition. Updates and corrections should in the future be initiated by any member of the TLS community using a RFP/RFC procedure, moderated by BASt. Updating of TLS.

workshop Best practices in monitoring deployment Thursday, 15th and Friday, 16th of March 2007, Hamburg, Germany Future Communication between Outstations and Centres – A Concept for the German Motorways Eike Pögel, Heusch/Boesefeldt GmbH Dr. Lutz Rittershaus, BASt Thank you for your attention Dr.-Ing. Lutz Rittershaus Federal Highway Research Institute Telematics, Traffic Management Brüderstraße Bergisch Gladbach Germany Eike Pögel Heusch/Boesefeldt GmbH Transport Telematics Tempelhofer Straße Aachen Germany