ACTAR WORKSHOP BORDEAUX

Slides:



Advertisements
Similar presentations
JRA01: ACTAR Collaboration : GANIL, DAPNIA Saclay, CENBG Bordeaux, Univ. Liverpool, Daresbury, GSI, Univ. Santiago de Compostela Objectives: Investigate.
Advertisements

Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
ACTAR Nov 05 Lolly Pollacco CEA Saclay Front End Electronics for ACTAR.
Bordeaux Meeting June 6-7th, 2005 Meeting starts at 2:30 pm, Monday June 6th 1)Summary of EURONS meeting (February 2005, Madeira) 2)Discussion of ACTAR.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
ACTAR - EURONS Collaboration meeting Project Coordinator: H. Savajols / P. Roussel-Chomaz Participating Institutions: 1.GANIL (AC) / DAPNIA (AC) / CENBG.
General Electronics for Time projection chambers GET a Multi-Project for IRFU/SPhN, GANIL, GSI, Compostela, CENBG, NSCL/MSU, Darsebury, York General Electronics.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
UTA, Jan. 9-11, 2003M. Ronan LC-TPC R&D1 LC-TPC R&D GEM, MicroMEGAS and MWPC techniquesGEM, MicroMEGAS and MWPC techniques Preliminary studiesPreliminary.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
- Frédéric Druillole - Présentation du SEDI 1 30/06/2015 Complete electronic Readout for Active Target (CERAT) Project Project Physicist’s demands Physicist’s.
Systems for Nuclear Physics Today 1.Number of Channels Approx. 1,000 2.Short & Reconfigurable Experimental Setups with variety of Detector Types 3.Human.
GANIL Meeting November 29th, ) Discussion of ACTAR Yellow book (30 mn) 2)Simulations : Lola, Hector, Roy, Beatriz (2 h) 3)Tests with MAYA-ITO: Fanny,
Mainz: Contributions to the LArg-Calorimeter Purity monitoring of the liquid argon and temperature measurement in the three cryostats - Old electronics.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Synergy Program for Front-End, Electronics, Data Acquisition & Control JRA 30 Emanuel Pollacco CEA Saclay SGFDC for Nuclear Physics KVI, STFC Daresbury,
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
S.Vereschagin, Yu.Zanevsky, F.Levchanovskiy S.Chernenko, G.Cheremukhina, S.Zaporozhets, A.Averyanov R&D FOR TPC MPD/NICA READOUT ELECTRONICS Varna, 2013.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, E. Delagnes, M. Dixit, M. Riallot, Y.-H. Shin, S.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
ICPPA-2015 Moscow Oct ASIC for calorimetric measurements in astrophysical experiment NUCLEON (overview) E. Atkin1, A. Voronin1,2, D. Karmanov2,
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
November, 7, 2006 ECFA06, Valencia, Spain LumiCal & BeamCal readout and DAQ for the Very Forward Region Wojciech Wierba Institute of Nuclear Physics Polish.
GET is a relatively unique project in data capture for Nucl. Phys. because:- – G : for Generic – Multi national lab collaboration – Multi project application:-
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
Jim Thomas - LBL 1 SSD News and Integration Notes Jim Thomas Lawrence Berkeley National Laboratory September 11 th, 2007.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
TRTViewer: the ATLAS TRT detector monitoring and diagnostics tool 4 th Workshop on Advanced Transition Radiation Detectors for Accelerator and Space Applications.
Status of hardware activity in CNS Taku Gunji Center for Nuclear Study University of Tokyo 1.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
Lukens - 1 Contingency Reduction Review – 27 May 2005 The Run IIb CDF Detector Project Contingency Reduction Discussion Patrick T. Lukens Fermilab 27 May.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Digital Acquisition: State of the Art and future prospects
Emanuele Leonardi PADME General Meeting - LNF January 2017
Rainer Stamen, Norman Gee
Objective of the Meeting
FEE for TPC MPD__NICA JINR
2007 IEEE Nuclear Science Symposium (NSS)
A General Purpose Charge Readout Chip for TPC Applications
JEDI polarimetry – Developments at SMART|EDM_Lab
Front-end and VME / VXI readout electronics for ASICs
Mini-Summary of the CAEN 10-12th March Meeting
Large Area Endplate Prototype for the LC TPC
Synergy Program for Front-End, Electronics, Data Acquisition & Control
CMS Preshower: Startup procedures: Reconstruction & calibration
HLT & Calibration.
Toward a costing model What next? Technology decision n Schedule
TPC Large Prototype Toward 7 Micromegas modules
Status of n-XYTER read-out chain at GSI
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Active Target for the low-energy short-lived radioactive beams
TPC electronics Atsushi Taketani
ECAL Electronics Status
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

ACTAR WORKSHOP BORDEAUX Emanuel Pollacco

From: Particle Physics To: Nuclear Physics Big is beautiful To: Nuclear Physics Small is mignon David Robert Nygren Lawrence Berkeley National Laboratory First TPC 1978 PEP-4 detector, e+e- at SLAC. Emanuel Pollacco

ACTAR Workshop A workshop to provide the international NUCLEAR PHYSICS community with an electronic instrumentation for Time Projection Chambers. General Electronics for TPC: GET Possible extension to other instrumentation. A workshop for Engineers & Physicists organized by Engineers. Emanuel Pollacco Emanuel Pollacco

Multi-Project & Multi-Laboratory ACTAR Darsebury, GANIL, Santiago, Saclay, CENBG… CENBG Saclay R3B collaboration MSU RIKEN Project General Electronics for TPC (GET) Covers Front End Electronics to DAQ Most Projects Lab1 Lab2 Lab3 Lab4 Project GET Projects Lab1 Lab2 Lab3 Lab4 ACTAR MSU-TPC R3B Emanuel Pollacco CENBG-TPC

What should YOU be doing at Bordeaux? Organization Organigram Partitioning of Tasks Who will construct (S&H) what? Milestones Budget Who will pay for what? Who is going to ask for what? ANR, … Adopt Budget Model Conceptual Phase Drawing Specifications Conceptual Design Building Pro-type Testing Pro-type Construction Phase Building of units Testing of units “ Nuclear Physics Needs A multi-project => multi-design => multi-requirements ==>Scale-Free Through-Put & Ch. N° NOT USUAL! Emanuel Pollacco

Must Construct an Organigram Work Packages? To inscribe in? A Discussion with conclusions before we are leave Bordeaux. Emanuel Pollacco

When are our target dates for the experiments? j When are our target dates for the experiments? Availability of manpower? Budget constrains? Have numbers for Wednesday morning. Emanuel Pollacco

Budget Model How are we going to pay for this project? When do you expect to have a response from the financial body? How are we to share the costs? Please prepare a slide for discussion on Wednesday morning. Emanuel Pollacco Emanuel Pollacco

Some suggestions Emanuel Pollacco Emanuel Pollacco

Other Instrumentation Bardelli ACTAR Workshop Ljubljana 2008 To what can we apply the GET electronics apart from TPC oriented instrumentation? Complete or Partial applications? Ge (higher resolution-HiSPEC/FAIR) Si for particle ID (high sampling-GASPARD, HYDE, EXL) Bragg detectors (VAMOS/GANIL) RDT (MUSETT-VAMOS/GANIL) … Is GET DAQ a possible “standard” for high data through-put for GANIL? What must we do to make it so? Emanuel Pollacco Emanuel Pollacco

Front End Electronics & DAC W Detector – Electronics interface. Data Registering Amplification/Digitizers Data Concentrators Data Selection (Trigger) Compression Event Processing Event Builders Routers Data Control (Detector & Electronics) Network-Based Run Control Data Flow Control OnLine Monitoring Parameter Control Test Functions/Diagnostics Calibration Online Control Control Management I assume that physicists have thought of:- Different modes of data taking Calibration, Trigger, Detector ensemble Analysis Criteria & Specifications Resolution, dynamic range, through-put, … Emanuel Pollacco

Electro - mechanics Discussion Tomorrow “Topology” of the electronics will depend significantly on the electro-mechanics layout Integrated amplification stage, with spark protection: • with 20 μm resistive layer, silicon survives breakdowns now gating grid anode wire Spark Protection Detector: Radiation environment Pre-Amp A-A ADC Discussion Tomorrow CoBo NIKEFF DAQ Emanuel Pollacco

What "Topology"? End CAP TPC Discussion Tomorrow A B C D anode wire gating grid Spark Protection Spark Protection Spark Protection Spark Protection Detector: Radiation environment Discussion Tomorrow Pre-Amp A-A ADC A-A A-A : ASIC+ADC card CoBo: COmpression BOard A-A ADC A-A ADC CoBo CoBo CoBo ADC CoBo Emanuel Pollacco, CEA Saclay DAQ DAQ DAQ DAQ Options Emanuel Pollacco A B C D

Need for a CONTROL Strategy FEB FEB FEB FEB FEB FEB FEB A-A ADC CoBo TPC Emanuel Pollacco, CEA Saclay Spark Protection Need for a CONTROL Strategy A-A ADC FPGA - Control Temperature Slow Control Relay Data Transfer Dead time etc Optic link transfer … CoBo– FPGA – Memory – Optic Links Data Compression Base-line Computation Computation of time, energy and shape Choice of algorithms Temporary Storage Optic link transfer Board Cooling Trigger Options By Sector/Event Shape/Multiplicity … CoBo Control DAQ Emanuel Pollacco B

Some work has been done. Information & Discussion needed. Data Concentration Base Line adjustment? Zero removal? Time Calibration & Time Stamp? Charge? … What is the latency for a give given FPGA for all these calculations? Emanuel Pollacco, CEA Saclay Where shall we do the data reduction? In CoBo? Some work has been done. Information & Discussion needed. A-A 288 ch A-A 288 ch A-A 288 ch A-A 288 ch S Disc CoBo 1152 ch A Signal S Disc ADC A S Disc FPGA ADC A ADC ADC Scale-Free ? N(A-A)/channels = 1, 2, … N(A-A)/N(Cobo) = 1, 2 or … 8 N(CoBo)/N(PCI-Express) = 3, 2 or 1 PCI-EXPRESS Emanuel Pollacco

Possible System External & Internal Trigger Scale Free Architecture Number of Channels Through-Put Data Treatment Emanuel Pollacco, CEA Saclay Spark Protection Pre-Amp A-A ADC CoBo DAQ A-A** ROD** A-A* CoBo* End-Cap EVENT BUILDER ROD CoBo** 6 CoBo*** A-A*** Emanuel Pollacco

Do we have an agreed upon timing-diagram (at least)? Spark Protection Pre-Amp A-A ADC CoBo DAQ A-A** ROD** A-A* CoBo* End-Cap Si EVENT BUILDER ROD CoBo** 6 Emanuel Pollacco, CEA Saclay Do we have an agreed upon timing-diagram (at least)? It will be useful ... Emanuel Pollacco

A Trigger Architecture Inspect What do we want for this? B5 B6 B7 B8 TRIGGER Logic Unit A-A 288 ch Some work has been done. Discussion needed. B0 B1 B2 B3 B4 A-A 288 ch A-A 288 ch A-A 288 ch CoBo 1152 ch S Disc A4 A S Disc S Disc A3 A S Disc A2 A S Disc A1 Inspect A1 A0 Emanuel Pollacco

END Emanuel Pollacco

How Long? How Much €? Development Production How long for an AFTER+ - 2 FTE How long for a A-A – 2.5 FTE How long for a FEM – 2.5 FTE How long for a DCC – 4.0 FTE Total 9 FTE Production Testing  you will do it, no? Emanuel Pollacco, CEA Saclay Emanuel Pollacco

ASIC-on-Pad? MAPS? DREAM-Land? 64 pads 2x2mm² 16 mm 6,400 pads ADC 6,400 pads ADC 6,400 pads 160 mm Emanuel Pollacco

TPC Work to be Done. Set Task & Date. B A-A CoBo FEB FEB FEB FEB FEB ADC CoBo TPC Emanuel Pollacco, CEA Saclay Spark Protection A-A ADC Control Temperature Slow Control Confirmation Signal Visualization Cooling Security Automat parameters … A-A – AFTER + ADC + Pulser + Multiplicity … 288 ch/A-A Multiplicity sum for 1152 channels Event Pattern Board cooling Calibration Ext & Int - Pulsers Time, Energy & Shape Slow Control Dics Level Gain Shape … Work to be Done. Set Task & Date. CoBo Control DAQ Emanuel Pollacco B

€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€€ Need to have slide: Need To Make Estimates of the Engineering Times involved. Need to Make Estimates of the fixed costs involved. From 1 & 2 we can obtain Price/Channel. Provide a bases for the individual demands to the different authorities. The Contribution in engineering time will be reduced from the final bill. Travel costs etc – to be paid by each laboratory. The final bill – how do we pay for it? Proportional to the number of channels? A fixed cost part + the number of channels? We pool all the money together … ? Common funding from say ANR? Need to have a kitty or money pool to perform the developments. Emanuel Pollacco

Drift Time for Hydrogen Emanuel Pollacco

Costing Exercise Engineering Costs Fixed Costs Items Considered:- Software & Hardware Fixed Costs Items Considered:- AGET (AFTER+) A-A (FEC+) CoBo (FEM+) Router (DCC+) Engineering costs for Industrialized Production Testing – done by the laboratory in question Facilities on card & bench test to allow this procedure AGET – not included Spark Protection A-A ADC CoBo Router Emanuel Pollacco