Mod 219 - Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.

Slides:



Advertisements
Similar presentations
Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
IFIEC’s view on Transparency in Electricity Markets Christoph Bier ERGEG Public Hearing on Guidelines of Good Practice on Transparency and Information.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Information Transparency Proposal Transmission Workstream 2 nd November 2006 Presentation by Abid Sheikh, energywatch and Angela Love, Poyry Energy.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NTS Update Gas Customer Forum 25 th September 2006.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
DEVELOPMENT OF GAS HUBS South Gas Regional Initiative Madrid, 29th October 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘
Gas Regional Initiative North-West Transmission Transparency Transmission Transparency Project GRI North-West Operators‘ Group Stakeholder Group Meeting.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
MIPI European Transparency Project (ETP) Transmission Workstream 7 th October 2010.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
“Amendment of Network Entry Provisions at the European Interconnector NTS sub- terminal at Bacton" Transmission Workstream 1 st December 2005.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
Trades and Transfers Workshop, 6 th November 2007.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
Implementation progress – second stage Transmission Transparency Workshop London, 14 November 2008.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
UNC Modification Proposal 0097: Modification to release aggregated ex-post information for pipeline interconnector offtake flows Christiane Sykes E.ON.
CUSC Panel – 19th July 2016 Binoy dharsi
UNC Modification Proposal 0202 National Grid Distribution
Introduction of Code Contingency Guidelines Document
GRI NW TRANSPARENCY PROJECT
UNC Trader User – Licence obligations
Amendment to NEA & NExA Measurement Provisions Change Process
NTS Entry Charging Review Update
Publication of Historical Gas Operational Data by National Grid NTS
Richard Fairholme Transmission Workstream, 2nd October 2008
Exit Capacity Substitution and Revision
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Introduction of Code Contingency Guidelines Document
MOD Deemed applications – User pays initial thoughts.
Transmission Workstream – Partial Assignment
Publication of UK Wholesale Gas Market Liquidity Data TR 1099/1100
Richard Fairholme E.ON UK
Richard Fairholme Transmission Workstream 4th September 2008
Information Provision for Transitional Exit Capacity
Revised Tender Timescale for DN Interruption Arrangements
Presentation transcript:

Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008

© 2007 E.ON01 June 2015, E.ON UK, Page 2 Introduction Typically, the amount traded daily between shippers on the NTS is around TWh, but the amount that actually ends up as a supply flow is around 2-3 TWh. This includes both spot trades and forward trades for the gas day. “The UK gas market is one of the most liquid in the world and the most liquid in Europe.” Source: BERR Guide to Gas Market Liquidity (2007)

© 2007 E.ON01 June 2015, E.ON UK, Page 3 Background House of Commons Business and Enterprise Committee Report (July 2008) Increased public scrutiny of the UK wholesale gas market… Consumer Representatives Ofgem Enquiry

© 2007 E.ON01 June 2015, E.ON UK, Page 4 The Mod Proposal “One measure of liquidity is the ratio of the volumes of gas traded over the volumes of gas consumed.” Source: BERR Guide to Gas Market Liquidity (2007)  We propose publication of aggregated NBP traded volumes (‘Total Gas Traded at NBP’) compared to physical daily gas flows (‘Total Daily Physical’).  Makes liquidity data more accessible, in one location for all market participants.  Makes more efficient use of existing data already collected by National Grid and provided by Shippers.

© 2007 E.ON01 June 2015, E.ON UK, Page 5 Example Data

© 2007 E.ON01 June 2015, E.ON UK, Page 6 The Reports 1.Headline figures to be presented on National Grid’s Prevailing View section of their website. 2.6 months of historical data to be presented on the National Grid website Daily Summary Page in a graphical format displaying ‘Total Gas Traded at NBP’ vs. ‘Total Daily Physical’ for the day D+1. 3.A new User report to be created on National Grid NTS’s Operational Data section of their website to show ‘Total Gas Traded at NBP’ vs. ‘Total Daily Physical’ with search parameters to specify the range of Gas Days for which data is required. Reports to be updated daily and published no later than 13:00 GMT at D+1 on National Grid NTS’s website.

© 2007 E.ON01 June 2015, E.ON UK, Page 7 Benefits of the Mod Proposal Helps address misunderstandings from some quarters about the liquidity (and competitiveness) of the UK wholesale gas market. Provides customers / consumers and other market participants with highly visible, transparent market liquidity data. Helps provide a “health check” for the market. May remove barriers to entry for potential market participants.

© 2007 E.ON01 June 2015, E.ON UK, Page 8 Next Steps…  Comments welcome!  Open to suggestions for improvements / additions, but only if it this involves information that is already freely available to National Grid.  Any proposal involving collecting information that is not already captured, may be better dealt with as part of another Mod or Review Group?  Proposed implementation date 1 st January 2009.

© 2007 E.ON01 June 2015, E.ON UK, Page 9