MANAGING A GIS PROJECT. Starting Points for GIS: Do your homework: GIS, RS, GPS Get familiar with the terminology Gain general knowledge of spatial analysis:

Slides:



Advertisements
Similar presentations
Geographic Information Systems “GIS”
Advertisements

The Role of Error Map and attribute data errors are the data producer's responsibility, GIS user must understand error. Accuracy and precision of map and.
Geographic Information Systems GIS Data Models. 1. Components of Geographic Data Spatial locations Attributes Topology Time.
Geographic Information Systems
WFM 6202: Remote Sensing and GIS in Water Management © Dr. Akm Saiful IslamDr. Akm Saiful Islam WFM 6202: Remote Sensing and GIS in Water Management Akm.
Managing Error, Accuracy, and Precision In GIS. Importance of Understanding Error *Until recently, most people involved with GIS paid little attention.
Raster Based GIS Analysis
1 CPSC 695 Data Quality Issues M. L. Gavrilova. 2 Decisions…
Lecture 24: More on Data Quality and Metadata By Austin Troy Using GIS-- Introduction to GIS.
West Hills College Farm of the Future. West Hills College Farm of the Future Where are you NOW?! Precision Agriculture – Lesson 3.
Geographic Information Systems and Science SECOND EDITION Paul A. Longley, Michael F. Goodchild, David J. Maguire, David W. Rhind © 2005 John Wiley and.
The Precision-Farming Guide for Agriculturalists Chapter Six
Department of Geography University of Portsmouth Fundamentals of GIS: What is GIS? Dr. Ian Gregory, Department of Geography, University of Portsmouth.
GIS Overview. What is GIS? GIS is an information system that allows for capture, storage, retrieval, analysis and display of spatial data.
GTECH 201 Lecture 05 Storing Spatial Data. Leftovers from Last Session From data models to data structures Chrisman’s spheres ANSI Sparc The role of GIScience.
Lecture 16: Data input 1: Digitizing and Geocoding By Austin Troy University of Vermont Using GIS-- Introduction to GIS.
Fundamentals of GIS Materials by Austin Troy © 2008 Lecture 18: Data Input: Geocoding and Digitizing By Austin Troy University of Vermont NR 143.
NPS Introduction to GIS: Lecture 1
Getting the Map into the Computer Getting Started with Geographic Information Systems Chapter 4.
It’s the Geography, Cupid!. GTECH 201 Lecture 04 Introduction to Spatial Data.
Geographic Information Systems
Data Input How do I transfer the paper map data and attribute data to a format that is usable by the GIS software? Data input involves both locational.
Week 16 GEOG2750 – Earth Observation and GIS of the Physical Environment 1 Lecture 13 Error and uncertainty Outline – terminology, types and sources –
Spatial data quality February 10, 2006 Geog 458: Map Sources and Errors.
GIS Development: Step5 - DB Planning and Design Step6 - Database Construction Step7 - Pilot/Benchmark (Source: GIS AsiaPacific, June/July & August/September.
GI Systems and Science January 23, Points to Cover  What is spatial data modeling?  Entity definition  Topology  Spatial data models Raster.
9. GIS Data Collection.
Data Acquisition Lecture 8. Data Sources  Data Transfer  Getting data from the internet and importing  Data Collection  One of the most expensive.
Introduction to the course January 9, Points to Cover  What is GIS?  GIS and Geographic Information Science  Components of GIS Spatial data.
Data Quality Data quality Related terms:
IT Job Roles Task 20. Software Engineer Job Description Software engineers are responsible for creating and maintaining software of various different.
Intro. To GIS Lecture 4 Data: data storage, creation & editing
©2005 Austin Troy. All rights reserved Lecture 3: Introduction to GIS Understanding Spatial Data Structures by Austin Troy, Leslie Morrissey, & Ernie Buford,
Developing Health Geographic Information Systems (HGIS) for Khorasan Province in Iran (Technical Report) S.H. Sanaei-Nejad, (MSc, PhD) Ferdowsi University.
Data Quality Issues-Chapter 10
Ref: Geographic Information System and Science, By Hoeung Rathsokha, MSCIM GIS and Remote Sensing WHAT.
September 18-19, 2006 – Denver, Colorado Sponsored by the U.S. Department of Housing and Urban Development Using Geographic Information Systems (GIS) as.
Chapter 2 The Origins of Software Modern Systems Analysis and Design.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
Chapter 3 Sections 3.5 – 3.7. Vector Data Representation object-based “discrete objects”
Fundamentals of GIS Materials by Austin Troy © 2008 Lecture 18: Data Input: Geocoding and Digitizing By Austin Troy University of Vermont.
Introduction to Rasters In ArcGIS 9.2. What can you do with Rasters Lots….
GIS Data Quality.
Copyright 2010, The World Bank Group. All Rights Reserved. COVERAGE, FRAMES & GIS, Part 2 Quality assurance for census 1.
Data input 1: - Online data sources -Map scanning and digitizing GIS 4103 Spring 06 Adina Racoviteanu.
Computing Fundamentals Module Lesson 19 — Using Technology to Solve Problems Computer Literacy BASICS.
How do we represent the world in a GIS database?
Chapter 2 The Origins of Software Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
DATA QUALITY AND ERROR  Terminology, types and sources  Importance  Handling error and uncertainty.
GIS Data Structures How do we represent the world in a GIS database?
Building Simulation Model In this lecture, we are interested in whether a simulation model is accurate representation of the real system. We are interested.
NR 143 Study Overview: part 1 By Austin Troy University of Vermont Using GIS-- Introduction to GIS.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
1 Overview Finding and importing data sets –Searching for data –Importing data_.
INTRODUCTION TO GIS  Used to describe computer facilities which are used to handle data referenced to the spatial domain.  Has the ability to inter-
Integrating Geographic Information Systems (GIS) into your Curriculum Teaching American History Meg Merrick & Heather Kaplinger Year 2 GIS Inservices.
Cis339 Chapter 2 The Origins of Software 2.1 Modern Systems Analysis and Design Fifth Edition.
Definitions of GIS Works with geographic information Performs data input, management, manipulation/analysis, and output functions Composed of hardware,
Chapter 10.  Data collection workflow  Primary geographic data capture  Secondary geographic data capture  Obtaining data from external sources 
Mobile GIS CHAPTER 1: GIS AND THE INFORMATION AGE The Information Age:  The world changing and the methods of meeting the needs of those changes are also.
“It’s Not a Sprint – It’s a Marathon” GIS 101 For Local Government ICIT Midyear Conference June 17, 2010 Jeff Miller, Dubuque County Matt Boeck, Story.
Systems Development Process Developing our own software The Business Perspective Copyright © 2016 Curt Hill.
Geocoding Chapter 16 GISV431 &GEN405 Dr W Britz. Georeferencing, Transformations and Geocoding Georeferencing is the aligning of geographic data to a.
Data Quality Data quality Related terms:
Geographic Information Systems “GIS”
GIS Basic Training June 7, 2007 – ICIT Midyear Conference
GEOGRAPHICAL INFORMATION SYSTEM
INTRODUCTION TO GEOGRAPHICAL INFORMATION SYSTEM
Computer Literacy BASICS
Presentation transcript:

MANAGING A GIS PROJECT

Starting Points for GIS: Do your homework: GIS, RS, GPS Get familiar with the terminology Gain general knowledge of spatial analysis: Georeferencing, Topology, and Map Projections and Coordinate Systems Talk to people who have implemented GIS View / Interact with working GIS projects

Getting Started with a GIS Project Begin at the End –what kind of outputs will be needed from the GIS –what kind of questions will be asked of the GIS Do you really need GIS or is DBMS enough Identify the needed resources –data, technology, people –do the resources exist for your project

Getting Started with a GIS Project Define level of accuracy needed –how to track: QA/QC/ metadata schema –costs grow exponentially with accuracy Prototype your project! –Take 5-10% of the total budget and prototype, from beginning to end, the project with a limited but varied subset of the data. –The problems that you head-off should more than compensate for the cost of the prototype. Complex system needs careful management –Mistakes cost money and time

COST Building a GIS from scratch is very expensive. The 90/10 Rule: 90% of the work gets you 10% of the solution. But it is that last 10% of the project that gets 90% of the reward. Unfortunately (or perhaps due to bad management), most projects run out of money just as they are about to move into the last 10% zone. Quality control is usually where people shave the costs. But at what expense?

Identify Needed Resources: Data Define data parameters –geographic extent –currency / time frame –geographic coordinate system and projection (one or more?) –which data model: raster or vector or both? –scale of the source data –grid data spatial resolution will you be mixing scales and resolution

Identify Needed Resources: Data Identify Desired Data Themes –if you want to implement specific models, you must collect data needed for input: USLE = A = R*K*L*S*C*P For each data theme, determine: –Entity model or continuous data theme –how will attribute information be encoded: ordinal (ranked), nominal (text), interval (numeric), ratio, unique –how will the data be used in the GIS? If data is used in a model, then it must be input in form that is supported by the model. Sometimes this can be recalculated, sometimes not. (High, low cannot be converted to exact values).

How to Obtain Desired GIS Data? Get it from another source Create it yourself / in house

How to Obtain Desired GIS Data? Get it from another source –How to find out who has wha t? Browse / Search online Contact likely producers –Free data vs. buying data –Hiring a consultant or firm to produce custom data

How to Obtain Desired GIS Data? Create it yourself / in house –point data with GPS –digitizing maps –scanning maps and photos Hybrid methods –post-process pre-existing data Interpolation: DEMS -> contour lines Geocoding vs. address matching Processing satellite imagery Cons: additional hardware / software / expertise needed Pros: ability to continue to create, edit your data

Identifying Needed Resources: technical Software Hardware –These were reviewed earlier in the lecture. The key is to evaluate these factors once you have a better sense of your project and your needed data resources. Network –large files + low bandwidth = poor GIS performance –particularly important for large-scale projects or distributed, online GIS systems

Identifying Needed Resources: People Working with GIS requires a combination of GIS-related technical skills and project subject skills. Need to strike a balance between the types of skills needed as they can provide checks/balances on each other. Very slow learning curve, even for technical people due to need to work spatially. Without an understanding of basic geographic principals, may not notice or understand logical errors or inconsistencies. Making use, not taking advantage of local GIS community

Identifying Needed Resources: People Possible roles for Consultants? –Prototyping the GIS project –One-time / specific tasks, like data creation, especially tasks that require expensive equipment and software or very specific expertise. –Reviewing the GIS project

Identifying Needed Resources: People What to Expect from Consultants? –Help clarifying the project goals, inputs, analysis –Info on data: availability, appropriate scales and formats –Ability to explain data models (vector, raster) and which data themes and attributes most suitable and how this relates to the queries and models that will be run in the GIS –Familiarity with one or more GIS software packages –Experience working on GIS projects from concept to completion

Evaluating the Quality of Spatial Data in GIS: Currency / Timeliness: is the data up-to-date? Completeness: any holes in the data? Consistency: map scale, metadata Accessibility: format, copyright, cost Accuracy & Precision: Sources of error in the data Sources of error in derived data and in the results of modelling and analysis * From: Burrough, P.A. and R.A. McDonnell, Principles of Geographic Information Systems, 1998

Evaluating Quality: Accuracy and Precision density of observations positional accuracy attribute accuracy - qualitative & quantitative topological accuracy

Evaluating Quality: Sources of Error Data entry or output mistakes Choice of the original data model Natural variation and uncertainty in boundary location and topology Observer bias

Pitfalls: what can undermine a GIS Project Inability to think spatially Lack of understanding the nature of error in spatial data and GIS. Hiring the wrong people or consultants. or Not training the staff. Lack of understanding of the nature of GIS: overestimating it, underutilizing it, not getting it. Failure to understand that GIS is a model of the real world not the real world. Underestimating the costs and needed resources, particularly data and staff.

Pitfalls: what can undermine a GIS Project: Failure to plan before the plunge. Not knowing when to cut your loses! More money won't make a bad design / bad software / bad data better. Failure to set boundaries / limits to extent of project Failure to set and adhere to timelines Failure to document data and processing procedures Failure to train users on how to use the final GIS product. Failure to share results of the GIS with entire org.