U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.

Slides:



Advertisements
Similar presentations
Why we need to learn a second language? Because its a ruff world out there.
Advertisements

Alabama State Port Authority Infrastructure for Tomorrows Market October 2005.
MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
Planned Expansion of the Panama Canal a brief discussion of the potential effects Western Dredging Association, Eastern & Gulf Chapters 2007 Fall Meeting,
St. Joseph Harbor FY 2014 Dredging. St. Joseph Harbor Entrance to the Channel (Prior to Dredging) Areas to be dredged 53,000 Cubic Yards to be removed.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
MOBILE DISTRICT DREDGING PROGRAM MOBILE DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
US Army Corps of Engineers BUILDING STRONG ® COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers United States Army.
HYCROFT RESOURCES & DEVELOPMENT INC. Allied Nevada Gold Corp.
50,000 sq. miles, LA to Mexico, 100 miles inland 400 miles of coastline $200 Million Program.
TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia River Channel Port Sutton Channel TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia.
1 Presentation for the 11th Annual Atlantic Intracoastal Waterway Conference By David B. Sanford Director, Navigation Policy & Legislation American Association.
South Atlantic Regional Biological Assessment Update on Status of Re-initation of Consultation under Section 7 of the Endangered Species Act Terri Jordan.
Civil Works Baltimore District River and Harbor Projects.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD.
Facilitating trade growth and optimising operations at Port Hedland.
US Army Corps of Engineers BUILDING STRONG ® West Onslow Beach/ Topsail Beach West Onslow Beach/ Topsail Beach Coastal Storm Damage Reduction Project Town.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Navigation Partnership Meeting “ A Unified Voice for Navigation, Project Prioritization, and.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Port of New Orleans Pat Gallwey Chief Operating Officer Port of New Orleans Counselors of Real Estate Oct. 13, 2009.
Coastal & Port Engineering Considerations of the Jacksonville Harbor Deepening Study Kevin Bodge, Ph.D., P.E. Port & Coastal Engineer Senior Vice President.
PORT EVERGLADES. 3.7 MILLION CRUISE GUESTS 6 MILLION TONS OF CARGO AND 924,000 CONTAINERS The total value of economic activity at Port Everglades in FY.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
Port Financial Management Challenges Financing Freight Transportation Improvements St. Louis, Missouri April 29 to May 2, 2001 Financing Freight Transportation.
Savannah Harbor Expansion Project
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Marketing/ Business Development Committee Presentation Board of Commissioners Session 351 May 28, 2013.
GEORGIA PORTS AUTHORITY: Preparing for Tomorrow’s Demands Today Planning Associates Course Savannah Harbor Expansion Project Planning Associates Course.
US Army Corps of Engineers BUILDING STRONG ® Charleston District Charleston Harbor Post 45 Deepening Feasibility Study Barbara Melvin Senior Vice President.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
NAD/SAD REGIONAL DREDGING MEETING/WEDA Jacksonville Harbor and Other Developments U. S. ARMY CORPS OF ENGINEERS COASTAL NAVIGATION BRANCH 10 October 2007.
Dredging Engineering: Building & Maintaining Underwater Highways
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
US Army Corps of Engineers BUILDING STRONG ® CORPS OF ENGINEERS NAVIGATION PROGRAM David Martinson Alaska District Corps of Engineers Elmendorf.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Opening of the Panama Canal in 2016 Its Anticipated Impact on Global Soy and Grain Transportation Ken Eriksen Senior Vice September.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Building Strong! May Deep Draft Navigation Module 2011 Planning Associates Class Jeremy LaDart Office of Water Project Review HQUSACE Mission Overview.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Middle Harbor Redevelopment Project WEDA Conference November 5, 2009.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Wilmington Harbor Project - 96 Act Brannon Quel. Port of Wilmington The Cape Fear River serves as the shipping channel to the State Port in Wilmington,
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Kwasi Badu-Tweneboah, Ph.D., P.E. – Geosyntec Consultants Jacksonville, Florida, USA Kenneth W. Cargill, P.E. – KW Cargill, P.A.. Punta Gorda, Florida,
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Update LTC Timothy Vail Oct 15, 2014.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
CALCASEIU RIVER AND PASS DREDGED MATERIAL SEDIMENTATION STUDY.
North Georgia Water Resources Partnership
Panama Canal Expansion
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
GBANS - Steps 4, 5 & 6 NOTE TO INSTRUCTOR: Offer to the team to display this slide for the team’s presentation.
DMMO ANNUAL REVIEW (2004) May 25, 2005.
Beneficial Use of Dredged Material
Memphis District PROCUREMENT OPPORTUNITIES
Breaches.
Presentation transcript:

U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project

U.S. Army Corps of Engineers  CARGO GROWTH  NEED FOR THE PROJECT  DESCRIPTION OF THE PROJECT  SEDIMENT VOLUMES  PLACEMENT AREAS  CARGO GROWTH  NEED FOR THE PROJECT  DESCRIPTION OF THE PROJECT  SEDIMENT VOLUMES  PLACEMENT AREAS Savannah Harbor Expansion

U.S. Army Corps of Engineers  SEDIMENT VOLUMES  PLACEMENT AREAS  EQUIPMENT LIMITATIONS  STUDY SCHEDULE  CONSTRUCTION SCHEDULE  SEDIMENT VOLUMES  PLACEMENT AREAS  EQUIPMENT LIMITATIONS  STUDY SCHEDULE  CONSTRUCTION SCHEDULE Savannah Harbor Expansion

U.S. Army Corps of Engineers CARGO GROWTH Savannah Harbor Expansion Georgia Ports Authority Total Tonnage 16-year History FY ,428,755 1,819,552 13,296,336 15,310,037 Millions of Tons  7.3% FY04 over FY03  11.7% FY05 over FY04  15.% FY03 over FY02 Between the 5 years FY02 through FY06, GPA’s total tonnage grew by 52%. Source: GPA Marketing 20,222,  9.9% FY06 over FY05 06

U.S. Army Corps of Engineers CARGO GROWTH Savannah Harbor Expansion FY Source: GPA Marketing (In Thousands of TEU’s) 1,572,734  4.5% FY04 over FY03  12% FY05 over FY04  31.5% FY03 over FY02 1,761,102 1,145,016 Between the 5 years FY02 through FY06, Savannah’s throughput has grown by 78%. Port of Savannah Container Throughput 16-year History In Thousands of TEUs 2,041,  15.9% FY06 over FY ,505,379 USWC Labor Unrest

U.S. Army Corps of Engineers NEED FOR THE PROJECT Savannah Harbor Expansion ForecastCapacity Staying Ahead of the Growth Curve Fiscal Year 2006 Throughput 2.04 million TEUs Current Annual Throughput Capacity 2.62 million TEUs Future Annual Throughput Capacity 5.07 million TEUs (by 2018) In Millions of TEUs FY Actual

U.S. Army Corps of Engineers DESCRIPTION OF THE PROJECT  Deepen 2 to 6 feet (from 42-feet)  Inner harbor – 20 miles  Entrance channel – 6 miles  Deepen & widen one turning basin  Construct a passing area  Construct four bend wideners  Nearshore placement of bar channel sediments  Mitigation  modify tidal creeks  dissolved oxygen improvement system DESCRIPTION OF THE PROJECT  Deepen 2 to 6 feet (from 42-feet)  Inner harbor – 20 miles  Entrance channel – 6 miles  Deepen & widen one turning basin  Construct a passing area  Construct four bend wideners  Nearshore placement of bar channel sediments  Mitigation  modify tidal creeks  dissolved oxygen improvement system Savannah Harbor Expansion

U.S. Army Corps of Engineers SEDIMENT VOLUMES ENTRANCE CHANNEL INNER HARBOR 2-Foot Deepening 7 MCY 3 MCY 6-Foot Deepening17 MCY10 MCY Savannah Harbor Expansion

U.S. Army Corps of Engineers PLACEMENT AREAS  Inner Harbor – existing CDFs  Entrance Channel – open water PLACEMENT AREAS  Inner Harbor – existing CDFs  Entrance Channel – open water Savannah Harbor Expansion

U.S. Army Corps of Engineers Inner Harbor

U.S. Army Corps of Engineers Nearshore Sediment Placement

U.S. Army Corps of Engineers EQUIPMENT LIMITATIONS  Inner Harbor – existing CDFs  Long pumping distances  Controls on depth  Entrance Channel – open water  Shallow water at placement sites  Window for hopper dredges EQUIPMENT LIMITATIONS  Inner Harbor – existing CDFs  Long pumping distances  Controls on depth  Entrance Channel – open water  Shallow water at placement sites  Window for hopper dredges Savannah Harbor Expansion

U.S. Army Corps of Engineers STUDY SCHEDULE  Draft GRR & EIS – Oct 07  Final GRR & EIS – Mar 08  Agency approvals –Apr 08  Agency approvals – Apr 08  ROD signed –  ROD signed – Apr 08 STUDY SCHEDULE  Draft GRR & EIS – Oct 07  Final GRR & EIS – Mar 08  Agency approvals –Apr 08  Agency approvals – Apr 08  ROD signed –  ROD signed – Apr 08 Savannah Harbor Expansion

U.S. Army Corps of Engineers CONSTRUCTION SCHEDULE  Sign PCA – late FY08  Construction contracts  Entrance channel – FY09 (3 years)  Inner harbor – FY10/11 (two)  Mitigation – FY10/11  Dissolved oxygen system – FY10/11  Dike raising – FY12 CONSTRUCTION SCHEDULE  Sign PCA – late FY08  Construction contracts  Entrance channel – FY09 (3 years)  Inner harbor – FY10/11 (two)  Mitigation – FY10/11  Dissolved oxygen system – FY10/11  Dike raising – FY12 Savannah Harbor Expansion

U.S. Army Corps of Engineers QUESTIONS ?