NOAA COMMAND AND DATA ACQUISITION STATION

Slides:



Advertisements
Similar presentations
1 April 27, 2004 Santos Rodriguez, NWS EMWIN CURRENT EMWIN OVERVIEW.
Advertisements

A new Network Concept for transporting and storing digital video…………
Alert radio repeater automated backup, failover, recovery David Leader HydroLynx Systems.
1 National Environmental Satellite, Data, and Information Service (NESDIS) Low-Rate Information Transmission (LRIT) IMPLEMENTATION and TRANSITION PLAN.
DADDS DCS LRIT Prototype LRIT Latency Results Presented by Microcom Design, Inc. May 2014.
NWS Use of Direct Broadcast Geostationary Weather Satellite Data
Spacecraft Constellation GOES-12 scheduled for de-commissioning in Dec 2013 –GOES-12 still supporting South American mission –GOES-12 DCS is turned on.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
GOES Direct Services. Topics  Direct Broadcast Services  GOES Data Collection Services  Search and Rescue.
Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility.
DCS Alternate Data Distribution System (DADDS) Database Development Status Presentation to the STIWG/TWG July 9, 2008.
1 GOES DCS Status and Information Dan Schwitalla – th Meeting of the STIWG– 18 – 20 May 2009.
Services Tailored Around You® Business Contingency Planning Overview July 2013.
1 EDDN Status and Information Dan Schwitalla – 2009 USGS STIWG/TWG – 6-8 May 2014.
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
NOAA’s NWS Telecommunication Gateway RTH Washington
Agency, version?, Date 2012 Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the slide master) Coordination Group.
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
Indian Ocean METOC Imager (IOMI) Operational Concept Demonstrates Military Operational Utility and Enables Improved Global Weather Prediction Data to Naval.
L ow R ate I nformation T ransmission Product Suite Satellite Direct Readout Conference for the Americas in Miami, Florida December 9-13, Charles.
Himawari Overview Mike Johnson & Joe Zajic (NWS/OST)
Coordination Group for Meteorological Satellites - CGMS NOAA Response to Action Presented to CGMS-41 plenary session.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
Chapter 8 Implementing Disaster Recovery and High Availability Hands-On Virtual Computing.
LRGS Enhancements for LRIT NOAA TWG Meeting May 12, 2011 Sutron Corporation Davis Drive, Sterling VA Tel: (703)
Tuesday, October 06, 2015 Santos Rodriguez NWS EMWIN HRIT/EMWIN.
SSEC Data Center Data 2010 MUG Meeting Jerrold Robaidek.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 2, 2012.
Upcoming Frequency Topics: Future GOES-R Concerns
1 National Satellite and Information Service Geostationary Operational Environmental Satellites (GOES) Mary E. Kicza Deputy Assistant Administrator for.
Kay Metcalf NOAA GOES DCS Program Manager Office of Satellite Data Processing and Distribution NOAA’s Satellite and Information Service GOES DCS: NOAA.
NOAA Satellite Proving Ground/User Readiness Meeting
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or is with copies to
LRIT Testing at NOAA/CO-OPS STIWG Oct CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS operates a DOMSAT system at its two regional.
Page 1 of 35 Achieving Over-The-Horizon Requirements Using Low Earth Orbit Satellites (LEOS) Presented by Eric Saikin.
A Proposal to Update LRIT to Provide Reliable Rebroadcast Tool for GOES DCS Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
DEC.10,20061 Santos Rodriguez, NWS EMWIN CURRENT EMWIN OVERVIEW.
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451  Contact Phil Whaley at (757) or Al McMath.
APSDEU-6, 1-3 June 2005, KMA HQ 1 Introduction to Future COMS Met. Operational Center KWON O-Ung Korea Meteorological Administration.
EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group for Meteorological Satellites - CGMS EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group.
NOAA Satellite and Information Service: Dissemination Systems Update George Jungbluth Senior International Relations Specialist NOAA Satellite and Information.
LRIT Project Status Update STIWG/TWG, Boise, ID Mark Bushnell NOAA/NOS/CO-OPS May 02, 2012 Definitions LRIT – Low Rate Information Transmission LRGS –
March 15, NWSTG Critical Infrastructure Update Fred Branski Telecommunication Operations Center February 2, 2006 NOAA’s National Weather Service.
Project to Develop GOES DCS User Requirements TWG Presentation By Ernest Dreyer October 28, 2009.
National Centers for Environmental Prediction: COPC Data Distribution Systems – IDP & NWSTG Michelle Mainelli Deputy Director, NCEP Central Operations.
Annie Griffith & Chris Fears September 2007 UK Link Technology Refresh.
GOES Program October 1, 2002 Steven P. Kirkner GOES Program Manager, NOAA/NESDIS.
NOAA Satellite Direct Readout Conference Welcome! – to the 2011 NOAA Direct Readout Conference! Kathleen Kelly Director, Office of Satellite Products and.
Geostationary Operational Environmental Satellite (GOES) User’s Conference Current Status of the NOAA GOES Direct Services Paul Seymour – Broadcast Services.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
1 THE EMWIN TRANSITION April 27, 2004 Angelo Wade, NESDIS Ground Systems.
GOES Data Collection System Status of Version II Transmitter Implementation Information Brief for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report WMO ISS September 2002.
Top Recommendations GOES POES Services Frequencies.
DADDS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 6, 2014.
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report Satellite Direct Readout Conference for the Americas Miami, Florida.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager November 17, 2010.
GOES Program Review Satellite Direct Readout Conference for the Americas Miami, Florida December 9, 2002 Gerald Dittberner Advanced Systems Planning.
Agency, version?, Date 2012 Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the slide master) Coordination Group.
DADDS New Features Tuesday, May 3, 2016Sioux Falls, SD Letecia Reeves, GOES DCS Customer Service Specialist NOAA/NESDIS/OSPO/SPSD.
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
1 DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 Peter Woolner Mitretek Systems /300 Auto Detect.
Plan for Test with Customers regarding EXTURE + -linked Information Distribution System.
DCS Alternate Data Distribution System (DADDS)
GOES DCS Customer Interaction/Access Training
Presentation transcript:

NOAA COMMAND AND DATA ACQUISITION STATION

DCS POINT OF CONTACT WCDA Station’s first point of contact for help is the DCS Help Desk at 757-824-7450 or 7451 Email is WCDADAPS@NOAA.GOV with copies to michael.b.galeone@noaa.gov Contact Phil Whaley at (757) 824-7331 or Al McMath at (757) 824-7316 Wallops supports 24/7 operations

DCS Configuration Wallops now supports demods for two complete spacecraft (120 channels each) One spare drawer on site (40 channels) To date three demod failures Preliminary testing has been conducted on the 100/300 baud concept (using the spare demods).

Wallops LRGS Configuration The demodulators for both East and West continue to feed the LRGS directly. This means that the primary LRGS (cdadata) is not dependent on DAPS. Use this as primary. The receive site (drot) gets its data from the DOMSAT downlink which is heritage DAPS data. We now have a third site (cdabackup). Wallops supported the STWIG sub-committee considering LRGS configuration, distribution, etc. Sites and IPs: http://cdadata.wcda.noaa.gov (205.156.2.174) http://drot.wcda.noaa.gov (205.156.2.186) http://cdabackup.wcda.noaa.gov (205.156.2.189)

LRIT Status LRIT traffic to Suitland is dependent on the Internet Transfer of data to Suitland continues to be a “double” single point failure LRIT data is returned to Wallops via T-1 lines. LRIT is an advantage to international users because DOMSAT is limited to CONUS. LRIT now has full East/West data streams An automatic re-transmission (one time) has been implemented. 1 meter antenna receives full LRIT stream There are no re-occurring costs associated with LRIT reception.

Current Spacecraft Status GOES-12 remains primary (75) for East GOES-11 has been transitioned as primary West (135) spacecraft GOES-10 is positioned (60) for the South American mission. Imagery operations began in Nov 06 GOES-9 was de-commissioned on 14 Jul 07 GOES-13 was tested and placed in storage. It was brought out of storage in July 07 for testing. GOES-O launch is scheduled for Summer 08.

Wallops Backup A second pilot remains active (channel 0) at the WBU. The frequency is 401.7MHz. Wallops staff has remote control/status capability of the WBU systems including the pilot from Wallops.

DOMSAT Frequency Change The final transition to the new DOMSAT frequency was June 13, 2007 New frequency is 11,817.5Mhz. All other parameters (pointing angles, modem settings, etc.) remain the same. Transition went smoothly.

DAPS Wallops has experienced data base issues (mid November). Updates had to be re-entered. DAPS-B is now primary and has been since November. Still supporting telnet (205.156.2.173/178) Working with OSDPD in the migration to 300/1200 baud channels. The Weather Service link has been transitioned to the MPLS (8 Jan 08). We are seeing fewer dropouts. Wallops Operations verifies the DCS pilot daily. No problems during the end-of-year transition.

GOES-12 Anomaly A North/South maneuver in November resulted in an anomaly of GOES-12. A leak in a thruster line resulted in the spacecraft being out of service for more than a week. During this time GOES-10 was used for DCPR In addition EMWIN and LRIT products were transmitted through GOES-10

DADDS The DCS Alternate Data Distribution System (DADDS) provides a separate means to distribute data from the demods should DAPS A & B fail. Testing was conducted at Wallops Oct 07. The system has been used on an as-needed basis. Currently DADDS will support NWSTG and DOMSAT traffic. Training for Wallops Operations staff is scheduled for the week of 4 Feb.

Multiple Data Sources We currently support- DOMSAT (primary) LRGS (cdadata, cdabackup, drot) Telnet (data base updates) LRIT NWS Telecommunications Gateway Dial-in