County Bridges Falling Down SDACC – County Commissioners Spring Workshop Thursday, March 17, 2011.

Slides:



Advertisements
Similar presentations
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Advertisements

Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
The Highway Bridge Program An Overview of the Program Details for Federal Agencies Edgar P. Small, Ph.D. Senior Structural Engineer FHWA - Office of Bridge.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
LHTAC Overview of LPA in Idaho July 24, 2013 Local Public Administration.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
District Information Session For the American Recovery and Reinvestment Act.
Federal Fund Exchange Training. What is the Federal Fund Exchange? This is a voluntary program in which a Local Public Agency can trade its federal obligation.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Transportation Infrastructure Technical Assistance Survey (oil counties)
Gilbert Road Light Rail Extension Transportation Project Advancement Agreement City Council Study Session December 4, 2014.
PROCESS OVERVIEW. Route Transfer Process – How it Evolved  2011 Study evaluated:  Processes  Procedures  Policies  Researched “best practices” 
North Dakota Association of County Engineers 2015 Annual Conference January 22, 2015 FHWA Update.
MODULE 2 By Vit Troyan. TRANSPORTATION: Right-of-Way Traffic Operations Street Maintenance One-Call Centers.
1 6-Year Transportation Improvement Program ( ) Kit Baker, Chair ( Citizen’s Transportation Advisory Committee ) Desiree’ Winkler, P.E. ( Transportation.
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
National Bridge Inspection Standards (NBIS)
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Golden Triangle Blvd. Progress Report March 27, 2007.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
1 SDDOT SAFETY PROGRAM. 2 Who Am I ??? CLIFF REUER TRAFFIC & SAFETY ENIGNEER SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION OFFICE OF PROJECT DEVELOPMENT
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Design Standards For Local Agency Bridges Statewide Local Agency Project Delivery Conference May, 2006 Design Standards For Local Agency Bridges Statewide.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 3, 2013.
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Federal Highway Administration Emergency Relief (ER) Program Brian Hogge Field Operations Team Leader July 2013.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Ron Hall Tribal Technical Assistance Program Colorado State University
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
IRRPCC Meeting Albuquerque, NM November 8,  Clarification needed on applicability of these roads into the IRR Inventory  Assignment given to IRRPCC.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
State Transportation Bonds. State Aid Bond Programs LBRP – Local Bridge Replacement Program ◦State Bridge Bond Funds LRIP - Local Road Improvement Program.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
Council Policy Forum Feb. 23, 2015 CAPITAL PLANNING & INFRASTRUCTURE.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Phase 2: 30% Design Plans September 4 th, 2012.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Bridge Maintenance and Inspection Responsibilities Technical.
LPA Certification Casper, WY October 14, Purpose of Certification To ensure a sub-recipient agency has a fundamental understanding of the requirements.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Needs What is it? Needs What is it?. Minnesota Statute Apportionment of money to counties. Subd. 2. Money needs defined. For the purpose of this.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
MISSOULA SCHOOL ZONE SPEED LIMITS PUBLIC WORKS COMMITTEE NOVEMBER, 9, 2011.
Prospective Rural Additions Meeting JULY 15, 2015.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
MnDOT Budget Overview House Transportation Finance Committee Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer February.
Dave Kuhn Assistant Commissioner
State Aid Programs.
Completing the State Aid Payment Request
Local Bridge Hydraulics 101 Planning & Funding Considerations
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
State Infrastructure Bank
I Street Bridge Replacement Project
Presentation transcript:

County Bridges Falling Down SDACC – County Commissioners Spring Workshop Thursday, March 17, 2011

Noël J. Clocksin Local Government Engineer Involved in all county road and bridge projects, STIP programming, technical assistance, project management, design guidance, etc. SDDOT/Local Transportation Programs 700 East Broadway Avenue Pierre, SD Phone: (605) FAX: (605)

SDDOT – Local Transportation Programs (LTP)  Aeronautics  Local Government  Railroads  Transit LTP Program Manager Bruce Lindholm

Local Government Section  Bridge Replacement/Rehabilitation  Bridge Inspections  County Roads  Grants  Urban Systems  Consultant Services

What signs?

How did that happen??

Local Bridge Statistics  3987 Structures (NBIS Length) 1085 Structurally Deficient & Sufficiency Ratings ≤ Structurally Deficient & Sufficiency Ratings ≤ 80  Nearly two-thirds of county structures need treatment. (2008 Local Roads Needs Study)  Life-span of Bridges

Bridge Inspection Program  All Highway Bridges Located on Public Roads Required to be Inspected Federal Codified Regulation Federal Codified Regulation Title 23 Section 650 Subpart C – National Bridge Inspection Standards (NBIS)Title 23 Section 650 Subpart C – National Bridge Inspection Standards (NBIS) NBIS Qualifications NBIS Qualifications Public Road Definition - 23 USC 101 (a) (27) “…..The term ‘public road’ means any road or street under the jurisdiction of and maintained by a public authority and open to public travel.”Public Road Definition - 23 USC 101 (a) (27) “…..The term ‘public road’ means any road or street under the jurisdiction of and maintained by a public authority and open to public travel.” Length – A structure is considered a bridge when its length, measured along the center of the roadway, is more than 20’ from abutment to abutment, or extreme ends of openings for multiple boxes and pipes where the clear distance between the openings is less than half of the smaller opening.Length – A structure is considered a bridge when its length, measured along the center of the roadway, is more than 20’ from abutment to abutment, or extreme ends of openings for multiple boxes and pipes where the clear distance between the openings is less than half of the smaller opening.

NBIS Length

Bridge Inspection Program  Funding 80% Federal Bridge Funds 80% Federal Bridge Funds 20% Local Match 20% Local Match LTP Bridge Inspection Engineer Cody Axlund

Bridge Inspection Program  Annual Sufficiency Report – Spring

Bridge Inspection Program  Individual Structure Repair Recommendations

Out of sight, out of mind….

Bridge Inspection Program  Consequences of Unaddressed Recommendations

Consequences of Debris

Funding  Local  Federal Highway Bridge Funds via SDDOT  ER / FEMA

Federal Highway Bridge Replacement & Rehabilitation Program - Local  $7.9 million annually (50% of Total) 66 Counties 66 Counties All Cities All Cities  20% Local Match Required

Local Bridges in Statewide Transportation Improvement Program (STIP)  219 Structures Currently Programmed  25 Projects Let Annually via this Program  2018 / 2019 First Years with Available Funding (Depends on Structure Cost) Important to have “Reservations” Important to have “Reservations”

Local Bridge Program  Funding Breakdown 80% Federal Bridge Funds 80% Federal Bridge Funds 20% Local Match – cash 20% Local Match – cash  Purpose Replacement or Rehabilitation of Eligible Structures Replacement or Rehabilitation of Eligible Structures

Local Bridge Program  Eligible Structures Must be NBIS Length Must be NBIS Length Must be a “Candidate” in PONTIS Must be a “Candidate” in PONTIS ReplacementReplacement RehabilitationRehabilitation Federal Aid & Non-Federal Aid Route Federal Aid & Non-Federal Aid Route

Local Bridge Program  Replacement Structure Types Bridges Bridges Box Culverts Box Culverts Metal Pipe Metal Pipe Low-Water Crossings Low-Water Crossings  Rehabilitation Types Deck Replacement Deck Replacement Abutment Replacement Abutment Replacement Etc. Etc.

Local Bridge Program  Details Eligible Costs Eligible Costs Preliminary EngineeringPreliminary Engineering ConstructionConstruction Construction EngineeringConstruction Engineering Ineligible Costs Ineligible Costs Grading Beyond “Touch Down” PointsGrading Beyond “Touch Down” Points Right-of-WayRight-of-Way UtilitiesUtilities Final Surfacing Off of Structure (includes Curb & Gutter, Sidewalk)Final Surfacing Off of Structure (includes Curb & Gutter, Sidewalk) FencingFencing

Local Bridge Program  Details (continued) Required Process Due to Federal Standards & Regulations Required Process Due to Federal Standards & Regulations Design by Consultant Selected from SDDOT Retainer ListDesign by Consultant Selected from SDDOT Retainer List 3-Party Work Order 3-Party Work Order Scope of Services by SDDOT Scope of Services by SDDOT Federal & SDDOT Design Requirements Federal & SDDOT Design Requirements Environmental Coordination by SDDOTEnvironmental Coordination by SDDOT 404 Permit Required – Application by SDDOT 404 Permit Required – Application by SDDOT Geotechnical Investigation by SDDOTGeotechnical Investigation by SDDOT Bid Letting by SDDOTBid Letting by SDDOT Construction Administration by SDDOTConstruction Administration by SDDOT

Local Bridge Program  Details (continued) Required Documents Required Documents Resolution Signed by Local CommissionResolution Signed by Local Commission Contains Maintenance Agreement Language Contains Maintenance Agreement Language SDDOT Right-of-Way Forms RequiredSDDOT Right-of-Way Forms Required Approved by SDDOT ROW, Legal, and FHWA Approved by SDDOT ROW, Legal, and FHWA Certifications for Utilities, ROW, and Letting AuthorizationCertifications for Utilities, ROW, and Letting Authorization

 Local Involvement Prioritization of Structures Prioritization of Structures Selection of Consultant from SDDOT Retainer Selection of Consultant from SDDOT Retainer Structure Type Selection Structure Type Selection Letting Authorization Letting Authorization Construction Phase Construction Phase Local Bridge Program

 Project Timing 2 – 3 Years (“Normal” Projects) 2 – 3 Years (“Normal” Projects) Survey, Hydraulics, Design, ReviewsSurvey, Hydraulics, Design, Reviews Environmental CoordinationEnvironmental Coordination On-site Inspection (TS&L)On-site Inspection (TS&L) Right-of-WayRight-of-Way

Local Bridge Program  What if Priorities Change?? Federal Funding Not Authorized Federal Funding Not Authorized No ProblemNo Problem Federal Funding Authorized Federal Funding Authorized Codified Federal RegulationsCodified Federal Regulations “10-Year” Regulation “10-Year” Regulation “Inactivity” Regulation “Inactivity” Regulation

Local Bridge Program  When Does Federal Funding Get Authorized?? Once a Consultant is Selected Once a Consultant is Selected

Where do we go from here?  Make a Plan – Prioritize Skeleton System – Main Routes Skeleton System – Main Routes Traffic Volume and Type Traffic Volume and Type ADTADT Cars vs. TrucksCars vs. Trucks Road Use Road Use Farm to MarketFarm to Market Emergency Vehicles (Ambulance, Fire)Emergency Vehicles (Ambulance, Fire) School Bus RouteSchool Bus Route

Where do we go from here?  Tools Bridge Inspection Reports Bridge Inspection Reports Proper Signing Proper Signing Proper Maintenance Proper Maintenance Program Eligible Structures Program Eligible Structures Commit Portion of Budget Commit Portion of Budget