Team West Pharmaceutical Services December 12, 2012.

Slides:



Advertisements
Similar presentations
Introduction to CAD/CAM/CAE
Advertisements

1.Twist top casing to release top platform 2.Turn switch to on position 3.Wait 12 seconds for full injection 4.Turn switch to off position 5.Wait 4 minutes.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Beth Francis, M.Ed., M.S. Gifted Intervention Specialist Felicity Franklin Schools.
TAREK A. TUTUNJI Rapid Prototyping. Prototype A prototype can be defined as a model that represents a product or system. This model is usually used for.
EPA Pesticide Container and Repackaging Regulations, Flow Chart 2: Can I fill this large portable refillable container (greater than 119 gallons)? (end.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
10 Software Engineering Foundations of Computer Science ã Cengage Learning.
Chapter 39 Types of Packaging. Objectives Reasons for packaging (packing) products. Common types of packaging. Aseptic packaging.
Chapter 18 Working Drawings.
SE 555 Software Requirements & Specification Beyond Requirements Based on Weigers Chapter17.
ME104Q PAPER RIVER CHASM BRIDGE Team Boomerang Mechanical Engineering University of Rochester Executive Summary The premise of this experiment is built.
Senior Design: Validation of Design December 15, 2008.
Automatic Dental Bur Loader NCDA Dental Products Development Group Progress Review Team 99.06: Jason Dickey, Greg Frantz, Allison Martin, Nancy Meyer Sponsor:
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
COMPACT MOBILE LIFTING DEVICE Team 3 Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Customer: FraunhoferAdvisor: Dr. Michael Keefe Mission: To design.
Estar Wide Format Shipping Container RIT MSD I PRELIMINARY DESIGN REVIEW RIT MSD Team: Thomas Benner Brandon Kilbury Phillip C. McKee Justin Mintz Jason.
Chapter 1 The Product Design Process
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Release & Deployment ITIL Version 3
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
P14311: PCB Isolation Routing System Final Presentation Team Members: Matthew Clark, Marley Collier Sears, Sarah Duman, Richard Kalb, Joseph Post, Zoe.
Team West Pharmaceutical Services Sponsors: Reginald Motley and Chris Evans Advisor: Dr. Singh BMEG: Ryan O’Boyle, Madison DeFrank, and Derek Hunter MEEG:
Loading Apparatus for High Velocity Tissue Rupture Mechanical Engineering Dalhousie University Senior Design Project Winter 2010.
Project Life Cycle Lecture - 18.
Goal: Understand the stages in design process and the role of computer aided design. Objectives: After this chapter, you should understand the following.
T.M.F.T: Thermal Mechanical Fatigue Testing
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Industrial Engineering Roles In Industry
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
 Test on cases:“Case Shipping Unit” Test  Used standards  Selection Chart  Test Plans  Test on pallets:“Pallet Shipping Unit” Test  Used standards.
Ch 3-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
COMPACT MOBILE LIFTING DEVICE Team 3 Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Sponsor: Fraunhofer Advisor: Dr. Michael Keefe Innovative Lifting.
Software Development Cycle What is Software? Instructions (computer programs) that when executed provide desired function and performance Data structures.
Project Life Cycle.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
13-January-2003cse LifeCycle © 2003 University of Washington1 Lifecycle CSE 403, Winter 2003 Software Engineering
Feasibility Analysis P Thermoforming Quote- CJK.
Systems Analysis and Design in a Changing World, Fourth Edition
Team West Pharmaceutical Sponsor: Tim Miller Adviser: Dr. Harris.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Team: Charlie Haggart, Gabriel J. Martínez-Díaz,
Sponsor Preview Final Presentation Advisor: Dr. James L. Glancey Sponsor Contacts: James Brooks, Chris Nagele, and Jeff Mlynarski Team Superior Tube 12/06/2013.
© Institute for International Research, Inc All rights reserved. Module 6: Manufacturing Throughput.
EPT 221 CONFIGURATION DESIGN. Objective of This Lecture Describe the configuration design phase Describe ways to generate product and parts configurations.
ENGR 211 Bridge Design Project
CW Thomas Thermoforming. CW Thomas Custom manufacturer of heavy gauge thermoformed plastic parts. ( START THICKNESS TO ) No proprietary products.
Dog Grooming tool Team 17 Justin Proctor, Roy Mason, Jordan Chupp, Dennis Pugh Sponsor: Engineering To Go.
Joel Gerber Zachary Reaver Kurt Schilling.  Provides physical proof of development  Maintains product design knowledge base  Meets government and corporate.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Air Conditioning Experiment Department of Mechanical Engineering University of Delaware.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
1 TCS – Internal Use ILP Training Material New Product Development (NPD) Process.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
Project Final Presentation Joe Featherall.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
SteriTite Instructions for use
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
LIFECYCLE OF A UK BRAND The Knowledge 1 day Conference 19 th May 2006.
Systems Analysis and Design in a Changing World, Fifth Edition
Stress and Strain – Axial Loading
ArcWorks Process Improvement P08008
Chapter 5: Project Scope Management
Chapter 2 The Process of Design.
ArcWorks Process Improvement P08008
Fiber Reinforced Polymer Systems
Presentation transcript:

Team West Pharmaceutical Services December 12, 2012

1 PhaseDeliverables 1 Definition of Customers and their Needs/Wants/Constraints Project Scope definition refinement Identification of science and technology relevant to project Identification of key performance and cost metrics Initial benchmarking results 2 Conceptual design to satisfy sponsor’s requirements Design specifications necessary to purchase components, manufacture, and assemble the proof-of-concept prototype Project cost 3 Conceptual design to satisfy sponsor’s requirements Design details for solution to sponsor’s project Updated Project Plan with allocation of needed resources Updated test plan that is based on a credible set of experiments and uses valid measurement methodologies 4 A viable prototype A transition plan that facilitates the implementation of the project results into the sponsor’s business

2 PhaseDeliverables 1 Definition of Customers and their Needs/Wants/Constraints Project Scope definition refinement Identification of science and technology relevant to project Identification of key performance and cost metrics Initial benchmarking results 2 Conceptual design to satisfy sponsor’s requirements Design specifications necessary to purchase components, manufacture, and assemble the proof-of-concept prototype Project cost 3 Conceptual design to satisfy sponsor’s requirements Design details for solution to sponsor’s project Updated Project Plan with allocation of needed resources Updated test plan that is based on a credible set of experiments and uses valid measurement methodologies 4 A viable prototype A transition plan that facilitates the implementation of the project results into the sponsor’s business

Background 3 West Pharmaceutical Services is a manufacturer of pharmaceutical packaging and injectable drug delivery system components for pharmaceutical and medical device companies RU packaging systems must have at least 3 removable packaging bags to comply with West RU packaging standards Ready to use (RU) products have multiple layers of packaging and packaging is shed as it goes through clean rooms prior to use Products are sterilized, packaged, and are ready to be used without any further preparations

Current Design - Westar RU for Lyo Stoppers 3 layers –Foil (Tertiary) –PE, Tyvek (Secondary) –PE, Tyvek (Primary) Primary and secondary bags are autoclaved Packaging integrity risks with removing the secondary bag Poor ergonomics 4 Figure 1: Current primary bag

To develop an innovative, sterile packaging system that adds value to West’s products and improves customer handling. Project Scope

Prioritized Sponsor Wants 1 Compatible with steam sterilization (minimum of 122 ℃ for 60 minutes) 2Maintain package integrity 3 Durability compared to current packaging: meet ASTM F390 standards for Gelbo testing 4Meet minimum shelf-life requirements 5Multiple layers that are able to be shed 6Easy to handle 7 Easy access to package contents without compromising packaging integrity 8Visibility of Package Contents 9Maintain cost to manufacture 10Aesthetic

WantTarget Value (s) Compatible with steam sterilization (minimum of 122 ℃ for 60 minutes) Yes Maintain package integrityMeets all applicable ASTM standards Durability compared to current packaging: meet ASTM F390 standards for Gelbo testing 900 strokes with < 7 pinholes Meet minimum shelf-life requirements6 months Multiple layers that are able to be shed> 3 layers Easy to handle<15 lbs-25 lbs Easy access to package contents without compromising packaging integrity Time to remove 1 layer: < 15 seconds Maintain cost to manufacture$6-$10 Aesthetic 80% of test subjects respond ‘Yes’ to improvement over current design Verify Contents of ContainerVisible from outer bag: Yes/No Metrics

3 Major Categories were considered for Concept Generation Sealing / Access Methods # / Type of Bags Rigid / Non- Rigid 8

Non-Rigid Concepts 9 3-Layers composed of PE / Tyvek. Heat-sealed. Ripcord opening method. 3-Layers composed of PE / Tyvek. Handles on each layer. Heat-sealed.

Updated Sponsor Wants 1 Compatible with steam sterilization (minimum of 122 ℃ for 60 minutes) 2Maintain integrity 2.5Rigid 3 Durability compared to current packaging: meet ASTM F390 standards for Gelbo testing 4Meet minimum shelf-life requirements 5Multiple layers that are able to be shed 6Easy to handle 7 Easy access to package contents without compromising packaging integrity 8Visibility of Package Contents 9Maintain cost to manufacture 10Aesthetic

3 Variations of Rigid Containers were Considered 11 Rigid Multiple Rigid Containers Rigid Primary Container Rigid Tertiary Container

12 Rigid Multiple Rigid Containers Not cost-plausible Rigid Tertiary Container Rigid Primary Container

13 Rigid Multiple Rigid Containers Not cost-plausible Rigid Tertiary Container Rigid Primary Container

Rigid Tertiary Container 14 Outer container – Rigid PE/Tyvek Primary and secondary deformable PE/Tyvek bags inside

15 Rigid Multiple Rigid Containers Not cost-plausible Rigid Tertiary Container Sponsor Veto Rigid Primary Container

16 Rigid Multiple Rigid Containers Not cost-plausible Rigid Tertiary Container Sponsor Veto Rigid Primary Container

17 Initial Rigid Primary Container Concepts Figure 1: RipcordFigure 2: Access Hole Figure 3: Peel-able Heat Seal

18 Selected Model for Prototype: Primary Container

Final Prototype 19 Figure 4. Final primary container design. Heat-sealed Tyvek® 1073B with 24AL Xhale® adhesive top Makrolon GP Polycarbonate rigid container Prototype container can hold roughly 4,500 Lyo stoppers

Final Prototype 20 Figure 5. Final packaging system featuring 2 removable layers around a rigid primary container. Primary container surrounded by Tyvek/Polyethylene secondary bag Secondary bag surrounded by a Nylon/Polyethylene tertiary bag Secondary bag vacuum-sealed around primary container to conform outer bags to primary container for improved ergonomics

Budget Breakdown 21 TOTAL BUDGET: $10,000 Test Materials$400 Manufacturing Cost$3,500 Initial Fees$1,500 TOTAL COST$5,400

Testing Preliminary Tests: (6) 1”x11” Polycarbonate samples –Tension –Peel –Material Integrity Final Testing: Final prototype –Stacking –Material Integrity –Peel 22

Testing Preliminary Tests: (6) Polycarbonate samples per test –Tension –Peel –Material Integrity Final Testing: Final prototype –Stacking –Material Integrity –Peel 23

Tension Testing of Polycarbonate Specimens 24 Prepare Specimen to height and thickness dimensions of final container with arbitrary width. Reduce load displacement data to obtain stress and strain information. Extrapolate stress results to determine maximum stacking load of the final container. After the required autoclave cycle, strength increased by ~10%

Tyvek / Polycarbonate Interface Peel Strength Test 25 Prepare Specimens of Polycarbonate and Tyvek to equal but arbitrary dimensions. Bond Tyvek to Polycarbonate as instructed by PacTech. Measure force to separate Tyvek layer from polycarbonate with instron testing machine. Determine strength to peel based on area of sealant. Minimum Peel Strength was determined to be 3.3lbf/in

Steam Autoclave Material Integrity Test 26 Prepare Specimen to arbitrary dimensions. Measure Dimensions of Specimen with caliper. Place specimen in autoclave and run at specified cycle. After run is complete, measure sample and document and changes. Vary orientation of specimens in autoclave. No relevant change in geometry due to the required autoclave cycle

Testing Preliminary Tests: (6) 1”x11” Polycarbonate samples –Tension –Peel –Material Integrity Final Testing: Final prototype –Stacking –Material Integrity –Peel 27

Stacking Test 28 Stacking tests resulted in a maximum stacking load of 110 lbf

Material Integrity Test – Steam Autoclave Still to be performed 29

Thermoform vs. Injection Molding 30 Example quote from Advanced Plastics, NY AttributeThermoformInjection Mold Mold fabrication time4-6 weeks18-24 weeks Parts per year (per mold) Up to 100,000 Cost of mold$ 3,000$ 22,000 Thermoform was best choice for a rapid prototype with reduced prototyping costs Costs would have been ~7x more and not been delivered until mid- February For actual production of larger unit numbers, injection molding is obvious choice.

Path Forward On production of >10,000 parts, Injection Molding is recommended as process choice. –Faster production time –Cheaper per part cost –Less downtime as mold lasts for more cycles. Opinion of group that trays were thicker than needed, future optimization of dimensions would drive materials cost down. 31 *Model used to produce costs assumed 2.00$ / lb material (medium engineering grade). Actual research shows an expected 1.60$ / lb Polycarbonate. Estimated costs (using Injection Molding calculator from University of Massachusetts) shown below in table. Based on empirical data.

Path Forward (Testing Next Steps) 32 Samples Processed and Subjected to Simulated Distribution Conditioning Run autoclave sterility cycle per current procedure Visually inspect seals for gross defects per ASTM F1886. Subject filled cartons to simulated distribution conditioning per ASTM , Distribution Cycle 2 (single parcel).  Schedule A Manual Handling-First Sequence Set  Schedule B Vehicle Stacking-Compression  Schedule F Loose Load Vibration, Method A1- Truck 40 min  Schedule E Vehicle Vibration- Truck 30 minutes, Air 120 minutes, Truck 30 minutes (column stacked)  Schedule A Manual Handling- Second Sequence Set  Schedule I Low Pressure ft f0r 60 minutes Perform integrity testing on package system:  Visually inspect seals for gross defects per ASTM F1886.  If there are any questionable seals, use methylene blue dye penetration to confirm seal quality (per ASTM 1929)  Perform integrity testing via vacuum decay testing (ASTM F2338) or other suggested method.

Acknowledgments West Team Mark Launer Tim Miller Monica Habash Pactech Frank Colombo Chad Buchta 33 UD Dr. Buckley Jim Farmer Center for Composite Materials

Questions? 34