2007. 6. 7. Ⅱ Ⅱ Ⅲ Ⅲ Ⅳ Ⅳ Ⅰ Ⅰ Ⅰ Ⅰ To increase Efficiency for EIA implementation. 1.1 General purpose of Post-Project management To meet within the levels.

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

1 Welcome Safety Regulatory Function Handbook April 2006.
Managing the Health and Safety of Contractors
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
The Aged Care Standards and Accreditation Agency Ltd Continuous Improvement in Residential Aged Care.
1 Auditing in the Public Interest Records Management in the Victorian Public Sector Audit objective Audit had two objectives : The first objective was.
Scoping in the EIA process Proposal Identification Screening
Contractor Safety Management
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Monitoring.
Contractor Management and ISO 14001:2004
Jump to first page EIAMonitoring9.07(Gajaseni,20 07) 1 Monitoring Monitoring = check of actions Monitoring plan =environmental management plan.
IS Audit Function Knowledge
ENVIRONMENTAL MANAGEMENT PLAN
Quality evaluation and improvement for Internal Audit
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Legal & Administrative Oversight of NGOs Establishing and Monitoring Performance Standards.
1 Performance Auditing  In IT Environment  Evidence Gathering & Analysis Techniques  Computer Assisted Techniques  Use of IDEA.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Environmental Impact Assessment (EIA): Overview
Approaches for forest certification System versus performance ? Presentation prepared by Pierre Hauselmann for the WWF / WB Alliance Capacity building.
ISO EMS OVERVIEW May ISO EMS OVERVIEW TRAINING Contents What is an EMS? Why ISO & Certification? EMS Basic Elements Environmental.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Ship Recycling Facility Management System IMO Guideline A.962
Continual Service Improvement Process
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
TRAINING SOLUTIONS SHERQMAT For more information contact Victoria: (Tel) (Fax) ( )
Course Outline MAIL.PPT/1 © All Rights Reserved by TQMI TQMI, India's leading training and consultancy organisation, with its network of offices across.
Basics of OHSAS Occupational Health & Safety Management System
UNEP Training Resource Manual Topic 13 Slide 1 Aims and objectives of SIA are to: F analyse how proposals affect people F identify and mitigate adverse.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Overview report of a series of FVO fact- finding missions and audits carried out in 2012 and 2013 in order to evaluate the systems put in place to give.
Implementation of the Essential Standards The Australian Quality Framework (AQTF) is the national set of standards which assures nationally consistent,
2008 New York - Member Forum Council for Responsible Jewellery Practices, Ltd. Overview of CRJP.
USING THE PUBLIC PROCUREMENT MODEL OF EXCELLENCE (PPME) TOOL TO IDENTIFY CAPACITY DEVELOPMENT NEEDS A PRESENTATION BY A.B. ADJEI CHIEF EXECUTIVE – PUBLIC.
UNEP Training Resource Manual Topic 11 Slide 1 Aims of EIA implementation and follow up are to: F carry out conditions of approval F ensure they work effectively.
Environmental auditing
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Health and Safety Policy
1 February 2005 Briefing Sessions Draft Regulations Using Water for Recreational Purposes.
Discussion Topic 2 Discussions TOPIC 2: Implementation costs.
Environmental Management System Definitions
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
UNEP Training Resource ManualTopic 2 Slide 1 The EIA process The EIA process comprises:  screening - to decide if and at what level EIA should be applied.
Introduction 1. Purpose of the Chapter 2. Institutional arrangements Country Practices 3. Legal framework Country Practices 4. Preliminary conclusions.
Programme Objectives Analyze the main components of a competency-based qualification system (e.g., Singapore Workforce Skills) Analyze the process and.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
Mitigation and Impact management
1 The Future Role of the Food and Veterinary Office M.C. Gaynor, Director, FVO EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
LECTURE 2 EIA/EIS. Proposed Undertaking (> 10 hectares) Determine whether there are environmental, health and safety impacts Application for environmental.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Energy Energy comes in many forms including electricity, gas, oil and steam and is a resource used by organisations worldwide Energy is becoming increasingly.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
An exposure to COMPLIANCE AUDIT By- Vishal Chawre DAG(A/c & VLC) O/o AG(A&E), Nagpur.
CHAPTER 3 Management Systems. Learning Objectives Describe the basic business activities and tools necessary to implement successful industrial hygiene.
Your partner in service delivery and development
Callist Tindimugaya and Gareth James Lloyd
EIA approval process, Management plan and Monitoring
Health and Safety Policy
Importance of Law and Policies in the Environmental Management System
Strategic Environmental Assessment (SEA)
EIA- Concept and Practice
How to conduct Effective Stage-1 Audit
Presentation transcript:

Ⅱ Ⅱ Ⅲ Ⅲ Ⅳ Ⅳ Ⅰ Ⅰ

Ⅰ Ⅰ

To increase Efficiency for EIA implementation. 1.1 General purpose of Post-Project management To meet within the levels predicted and required by EIA law (regulation) Almost 150 projects are consulted annually. In Korea, EIA implementations are undertaken for more then 1,000 sites. 1.2 Environmental Impact Assessment in Korea 1.3 Significance of this Study To improve the Korean post-EIA system comparing with UNEP EIA Training Resource Manual in aspect of legislation system and implementation of EIA To determine that mitigation plan should be implemented and worked effectively.

1.4 UNEP EIA Training Resource Manual What is UNEP EIA Training Resource Manual - The EIA Training Resource Manual is intended to support capacity development in Environmental Impact Assessment. - It is a tool for trainers who have some background experience and understanding of EIA. - It is designed to assist them in preparing and delivering training courses that provide an understanding of, and basic capability in the application of EIA. - The EIA Training Resource Manual is intended to support capacity development in Environmental Impact Assessment. - It is a tool for trainers who have some background experience and understanding of EIA. - It is designed to assist them in preparing and delivering training courses that provide an understanding of, and basic capability in the application of EIA. Manual design and content - Section A : The manual in perspective - Section B : Capacity building and the environment - Section C : Training needs analysis - Section D : Course design, delivery and evaluation - Section E : Training Topics - Section A : The manual in perspective - Section B : Capacity building and the environment - Section C : Training needs analysis - Section D : Course design, delivery and evaluation - Section E : Training Topics

1.4 UNEP EIA Training Resource Manual Training Topics are structured provide ; - background materials in the form of session outlines - training a activities including detailed group activities and themes for discussion or speakers - references and resource materials - background materials in the form of session outlines - training a activities including detailed group activities and themes for discussion or speakers - references and resource materials Training Topics content - Topic 1 : Introduction and overview of EIA - Topic 2 : Law, policy and institutional arrangements for EIA systems - Topic 3 : Public involvement - Topic 4 : Screening - Topic 5 : Scoping - Topic 6 : Impact analysis - Topic 7 : Mitigation and impact management - Topic 8 : Reporting - Topic 9 : Review of EIA quality - Topic 10 : Decision-making - Topic 11 : Implementation and follow up - Topic 12 : EIA project management - Topic 13 : Social Impact Assessment - Topic 14 : Strategic Environmental Assessment - Topic 15 : Future directions - Topic 1 : Introduction and overview of EIA - Topic 2 : Law, policy and institutional arrangements for EIA systems - Topic 3 : Public involvement - Topic 4 : Screening - Topic 5 : Scoping - Topic 6 : Impact analysis - Topic 7 : Mitigation and impact management - Topic 8 : Reporting - Topic 9 : Review of EIA quality - Topic 10 : Decision-making - Topic 11 : Implementation and follow up - Topic 12 : EIA project management - Topic 13 : Social Impact Assessment - Topic 14 : Strategic Environmental Assessment - Topic 15 : Future directions

1.5 Training Topic 11-Implementation and follow up Aims of EIA implementation and follow up are to ; - carry out conditions of approval - ensure they work effectively - verify impacts are as predicted or permitted - take action to manage unforeseen changes - optimize environmental benefits - improve EIA practice in the future Key components of EIA implementation and follow up include ; - surveillance and supervision - effects or impact monitoring - compliance monitoring - environmental auditing - evaluation of EIA effectiveness and performance - post-project analysis - surveillance and supervision - effects or impact monitoring - compliance monitoring - environmental auditing - evaluation of EIA effectiveness and performance - post-project analysis

Tool box for environmental management and performance review - Internalizing the environment in policy and planning (use SEA, technology assessment, comparative risk assessment) - Planning and designing environmentally sound projects (use EIA, SIA, risk assessment, environmental benefit cost assessment) - Environmental management of the impacts of an operating facility or business enterprise (use EMA (ISO series), total quality environmental management (TQEM), industrial codes of practice) - Internalizing the environment in policy and planning (use SEA, technology assessment, comparative risk assessment) - Planning and designing environmentally sound projects (use EIA, SIA, risk assessment, environmental benefit cost assessment) - Environmental management of the impacts of an operating facility or business enterprise (use EMA (ISO series), total quality environmental management (TQEM), industrial codes of practice) - Eco-design of processes and products (use environmental design, life cycle assessment, cleaner production) - Monitoring, audit, and evaluation of performance (use effects and compliance monitoring, site, energy, waste, health and safety audits, benchmarking, performance review, environmental auditing)` - Eco-design of processes and products (use environmental design, life cycle assessment, cleaner production) - Monitoring, audit, and evaluation of performance (use effects and compliance monitoring, site, energy, waste, health and safety audits, benchmarking, performance review, environmental auditing)` 1.5 Training Topic 11-Implementation and follow up

Guiding principles of EIA implementation and follow up ; - carry out conditions of approval - undertake routine surveillance and inspection - other activities should be commensurate with significance - monitoring and auditing should be undertaken when * potential impacts are potentially significant * mitigation measures are untried/ outcomes uncertain * new aspects of EIA introduced - carry out conditions of approval - undertake routine surveillance and inspection - other activities should be commensurate with significance - monitoring and auditing should be undertaken when * potential impacts are potentially significant * mitigation measures are untried/ outcomes uncertain * new aspects of EIA introduced Aspects to consider in design of EIA implementation and follow up ; - what is required ? * identify the scope and components - who will carry out the activities ? * specify roles & responsibilities - how will these be implemented ? * allocate resources, define procedures & arrangements - what is required ? * identify the scope and components - who will carry out the activities ? * specify roles & responsibilities - how will these be implemented ? * allocate resources, define procedures & arrangements 1.5 Training Topic 11-Implementation and follow up

Monitoring is used to ; - establish baseline conditions - measure actual impacts and trends - verify they comply with agreed conditions - facilitate impact management - determine the accuracy of impact prediction - review the effectiveness of mitigation measures - establish baseline conditions - measure actual impacts and trends - verify they comply with agreed conditions - facilitate impact management - determine the accuracy of impact prediction - review the effectiveness of mitigation measures Monitoring requirements in the EIA/EMP - impacts to be monitored - objectives and data requirements - arrangements for conduct of monitoring - use of the information collected - response to unanticipated impacts - measures for public reporting and involvement - impacts to be monitored - objectives and data requirements - arrangements for conduct of monitoring - use of the information collected - response to unanticipated impacts - measures for public reporting and involvement 1.5 Training Topic 11-Implementation and follow up

For scientifically credible monitoring ; - use methods of a relevant discipline - establish impact and reference sites - result in time series data which can be analysed by * assembling the data in tabular or graphic format * testing for variations that are statistically valid * determining rates and directions of change - use methods of a relevant discipline - establish impact and reference sites - result in time series data which can be analysed by * assembling the data in tabular or graphic format * testing for variations that are statistically valid * determining rates and directions of change Steps to develop an effective monitoring programme ; - define the scope and objectives (for each impact) - identify the boundaries and select sites - choose the key indicators - determine the level of accuracy required in the data - consider how the data will be analysed - establish a data and reporting system - specify thresholds of impact acceptability - set requirements for action on exceedences - define the scope and objectives (for each impact) - identify the boundaries and select sites - choose the key indicators - determine the level of accuracy required in the data - consider how the data will be analysed - establish a data and reporting system - specify thresholds of impact acceptability - set requirements for action on exceedences 1.5 Training Topic 11-Implementation and follow up

Actions to address excessive impacts or unanticipated changes ; - stop or modify the causal activity - impose penalties if legal standards are breached - add or scale up mitigation measures (if feasible) - stop or modify the causal activity - impose penalties if legal standards are breached - add or scale up mitigation measures (if feasible) EIA audits are used to ; - identify impacts and results - verify conditions of approval are being met - test the accuracy of impact predictions - check the effectiveness of mitigation measures - improve compliance and performance - identify impacts and results - verify conditions of approval are being met - test the accuracy of impact predictions - check the effectiveness of mitigation measures - improve compliance and performance 1.5 Training Topic 11-Implementation and follow up

EMS audits include ; - site audits - compliance audits - sector & issue audits, e.g. * waste * energy * health and safety * supply chains - site audits - compliance audits - sector & issue audits, e.g. * waste * energy * health and safety * supply chains Difficulties commonly experienced in EIA Audits - limited baseline information - qualitative and non auditable predictions - changes to project design and mitigation - long lead times for some types of impact - limited baseline information - qualitative and non auditable predictions - changes to project design and mitigation - long lead times for some types of impact 1.5 Training Topic 11-Implementation and follow up

Ⅱ Ⅱ

Legislation 3 categories for topic 11 according to UNEP EIA Manual. 2.2 Method Introduction of the cases in Korea that has a good accordance with UNEP EIA Manual. Well accordance Partial accordance Discordance Improvement needed for the cases which not meet UNEP EIA Manual. 2.3 Evaluation Implementation in site Individuals in charge of post-project sites (How post-EIA standard meets the UNEP guideline) Use of legislation in Korea Legislation of EIA in Korea Post-project sites undertaken post-monitoring of EIA 2.1 Objects of this Study

Ⅲ Ⅲ

3.1.1 Classification of Topic 11 Classification of Topic 11 (UNEP EIA Training Resource Manual) Post-project in General Monitoring EIA Auditing The number of items categorized by Topic 11 - Post-project in general Section : 24 items - Monitoring Section : 26 items - EIA Auditing Section : 12 items 26 items24 items12 items

3.1.2 EIA related Laws in Korea Laws for EIA Laws of Strategy Environment Assessment (SEA) - Fundamental law of Environmental policy (2006) - Enforcement Ordinance of Fundamental law of Environment policy (2006) - Fundamental law of Environmental policy (2006) - Enforcement Ordinance of Fundamental law of Environment policy (2006) - Laws of Impact Assessment for Environment and Traffic, Disaster (2006) - Enforcement Ordinance of Impact Assessment for Environment and Traffic, Disaster (2006) - Enforcement regulations of Impact Assessment for Environment and Traffic, Disaster (2006) - Laws of Impact Assessment for Environment and Traffic, Disaster (2006) - Enforcement Ordinance of Impact Assessment for Environment and Traffic, Disaster (2006) - Enforcement regulations of Impact Assessment for Environment and Traffic, Disaster (2006)

3.1.2 EIA related Laws of Korea Promulgate for EIA Promulgate for Strategy Environment Assessment - Guide for Development of industry location (2006) - Provisions for framing Prior-Environment Review (2006) - Promulgate for review method and review items of Prior-Environment Review on a golf course (2006) - Guide for Development of industry location (2006) - Provisions for framing Prior-Environment Review (2006) - Promulgate for review method and review items of Prior-Environment Review on a golf course (2006) - Provisions for EIA framing (2007) - Provisions for framing and particulars of EIA design (2004) - Standard of cost estimation for EIA achievement (2001) - Promulgate for notice draft-EIA to information network (2004) - Provisions for EIA framing (2007) - Provisions for framing and particulars of EIA design (2004) - Standard of cost estimation for EIA achievement (2001) - Promulgate for notice draft-EIA to information network (2004)

3.1.2 EIA related Laws of Korea Established rule for EIA Instruction for EIA - Provisions for mediation council of EIA (2002) - Guide for EIA Dem construction favoring Environment (2006) - Provisions for allotted charges affairs excess to standard of approval (2004) - Provisions for handling affairs of reassessment EIA (1999) - Provisions for handling affairs of examination Post-Environment review (2004) - Provisions for mediation council of EIA (2002) - Guide for EIA Dem construction favoring Environment (2006) - Provisions for allotted charges affairs excess to standard of approval (2004) - Provisions for handling affairs of reassessment EIA (1999) - Provisions for handling affairs of examination Post-Environment review (2004) - Provisions for handling affairs of consultation contents management and consulted EIA (2006) - Guide for handling affairs of management and registration EIA agent (2005) - Guide for management of EIA system (2001) - Provisions for handling affairs of consultation contents management and consulted EIA (2006) - Guide for handling affairs of management and registration EIA agent (2005) - Guide for management of EIA system (2001)

Total items Division Legislation aspectsImplementation aspects Items (case)Rating (%)Items (case)Rating (%) Well accordance Partial accordance Discordance Total Evaluation Results Legislation aspects Implementation aspects

Division Legislation aspectsImplementation aspects Items (case)Rating (%)Items (case)Rating (%) Well accordance Partial accordance Discordance Total Rating Result Legislation aspects Implementation aspects Result of the EIA in General evaluation

Division Legislation aspectsImplementation aspects Items (case)Rating (%)Items (case)Rating (%) Well accordance Partial accordance Discordance Total Rating Result Legislation aspects Implementation aspects Result of the Monitoring

Division Legislation aspectsImplementation aspects Items (case)Rating (%)Items (case)Rating (%) Well accordance0000 Partial accordance Discordance Total Rating Result Legislation aspects Implementation aspects Result of the EIA Auditing

General EIA implementation Exemplary Case of well accordance in Korea - Confirm that the conditions of project approval are implemented. Aspect of system Inform that the conditions of approval for the Environment project Aspect of implementation The case ‘informing the condition of approval’ Law of Impact Assessment for Environment, Traffic, Disaster Form of Environment Impact Review Report Provisions for Environment Impact review Investigation of Implementation condition of approval during site survey Introduction of Environment Impact Review Report

Case of Post-Environment Review Exemplary Case of well accordance in Korea - This report is reported to the approval agency and the environmental office annually by the proponent.

Monitoring Aspect of system Prescription investigation frequency for impacts and effects monitoring Aspect of implementation Performance Monitoring classified by times, monthly, a quarter of a year. Specific prescript to compare and analyze results of Impact review Provisions for EIA framing Provisions for Environment Impact Review – format of Impact review Comparison with achieved data and back-ground data from previous work. Making report to investigate the mitigation facilities Exemplary Case of well accordance in Korea - measure actual impacts and trends

Sampling data for monitoring Exemplary Case of well accordance in Korea - Air quality, water quality, noise & vibration, aquatic ecosystem etc. Air quality Water quality Aquatic ecosystem Noise & vibration

General EIA implementation Exemplary Case of lacking in Korea - Evaluation of EIA effectiveness and performance Aspect of system No regulation for a Feed-back Aspect of implementation There’s no investigation for the Feed-back in site management. Insufficient study in Feed-back Partial application to similar projects in activity projects.

Monitoring Exemplary Case of lacking in Korea - The measures for public reporting and involvement. Aspect of system There are provision for an impact to stakeholders Aspect of implementation Determination whether stakeholders participate or not at a step of EIA, in cases of specific.` The measures of public reporting and involvement were lacking. Opening to the public and inducing participation to stakeholder and NGOs, in cases of determined project to stakeholders participate.

EIA Auditing - No system in Korea - only applicable for the EMS - No system in Korea - only applicable for the EMS Aspect of system Lacking in application Aspect of implementation Application for site at according to EMS system Exemplary Case of lacking in Korea No systematic approach ; however post-monitoring reflects partially` Post-monitoring report should be checked by developing organization

Ⅳ Ⅳ

In Korea, Overall, 73% achievements (legislation aspect) and 85% (Implementation aspect) 4.1 Conclusion Feed back system should be installed in Korea. 4.2 Remarks In General EIA implementation, there is 83% from achievements legislation aspect and 92% from Implementation aspect. In General EIA implementation, there is 83% from achievements legislation aspect and 92% from Implementation aspect. In Monitoring, there is 96% for legislation aspect and 100% for Implementation aspect. Well accordance with Topic 11 In EIA Auditing, no application in Korea; however 42% from Implementation aspect. Need public involvement a step of post-project in Korea Introduction of EIA Auditing should be considered in Korea.