1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
Presentation to WECC Market Interface Committee March 24, 2015
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
Managing the Information Technology Resource Jerry N. Luftman
1 Customer Network Operations Center. 2 Agenda Overview Benefits Value Additional Services Questions Monitoring Options.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 3 Overview - EAI Generation Supply Plan Requirements for 2014 Operations.
Texas Regional Entity Compliance Report TAC July 9, 2009.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
1 Draft NYISO 2003 Budget Report BS&P Report to Management Committee October 16, 2002.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
1 North American Energy Standards Board EPSA Regulatory Affairs Conference NAESB Activities in the Wholesale Electric Market Washington, DC October 25,
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Entergy Arkansas, Inc. Transition Plan Technical Conference #2 July 15, 2010.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Public Meeting on ERCOT’s Proposed 2004 Budget September 3, 2003 Preliminary - Subject to ERCOT Board Approval.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 2 Status Update Assessment of Strategic Options and “No Regrets” Implementation.
Status Report for Critical Infrastructure Protection Advisory Group
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
WestConnect RTO-ACC Update September 2, 2003 Cary Deise APS.
Overview of Southern Company Transmission
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Successful Restructuring: The Way Forward Mark Bennett Senior Manager of Policy Electric Power Supply Association Restructuring and the Wholesale Market.
Project Cyber Security Order 706 Version 5 CIP Standards Potential to Adversely Impact ERCOT Black Start Capability.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
SPP Presentation. Retail Open Access for ETI within SPP Implementation Considerations Stakeholder Meeting February 21, 2007 Austin, Texas.
Working Paper on Standardized Transmission Services and Wholesale Electric Market Design Alice Fernandez, Derek Bandera, Connie Caldwell, Jignasa Gadani,
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Long-Term Solution for Negative Generation Entergy Transmission AFC Stakeholder Meeting August 22, 2006.
Federal Energy Regulatory Commission MISO/Alliance Companies’ RTO Status Reports Presented by: Joseph Power Tony Ingram Rahim Amerkhail Patrick Clarey.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
1 TAC Report to the ERCOT Board February 16, 2005.
ESI/SPP Seams Agreement Implementation Update Transmission Planning Summit August 11, 2010.
SPP.org 1. ICT Working Groups Current Activities Jody Holland Dowell Hudson Antoine Lucas Tim Phillips.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Briefing on 2017 CAISO Policy Initiatives Roadmap
Pseudo-tie business procedure
Two-Dam Independence Project Update
Mountain West Transmission Group Panel Discussion
NERC Congestion Management
Pseudo-tie business procedure
Presentation transcript:

1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time Operations Matt Wolf July 15, 2010

2 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Review of May 5 Technical Conference l Overview of Balancing Authority (BA) functional requirements –Potential EAI BA configuration –Preliminary cost estimates to establish a BA for the EAI area –Implications for generation requirements l Preliminary estimate of cost to establish a separate BA and Stand–Alone operations for EAI: ($ 2009) Startup Cost: ≈ $23 MM Run Cost:≈ $14 MM/year Less ESI Charges:≈ ($ 6) MM/year ============================================ Net Run Cost:≈ $8 MM/year

3 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Outline for July Presentation l Focused on short-term or real-time operation functions l Provide more details on our preliminary cost and labor estimates – Major Functions – Organizational Breakdown l Describe savings that could be realized by utilizing ESI for certain functions l Discuss how RTO participation could affect the cost estimates l Discuss our next steps

4 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Current Options l Many Options: 1. Stand-Alone Operations with ICT or enhanced ICT. 2. SPP RTO with day-ahead and real-time market and consolidated BA 3. SPP RTO as it is today – Multiple BAs 4. MISO which already has a consolidated BA 5. Wholesale arrangement with other Entergy OPCOS 6. Wholesale arrangements with other third parties 7. Combinations of the above options l All of these different options could have some impact on the infrastructure and human resources that EAI will need to begin operations in December 2013 l Many of the stand-alone implementation activities are common to all options l The goals: – Be ready to operate by December 2013 – Be flexible to adapt as we move forward – Minimize implementation risk

5 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS August 2009 EAI Stand-Alone Implementation Study l Assumed full duplication of facilities and staff that are now provided by ESI System Planning and Operations (SPO) l Assumed Energy Delivery (ESI Transmission Operations) would modify software, add staff, and upgrade metering systems and RTUs needed to operate a new balancing area. l Provided three sensitivity cases – Reduce staffing by 10% – Lease vs. Build – Locate EAI generation operations group at the same location as ESI generation operations group l In total, sensitivity cases reduced estimated implementation cost from $23 MM to $17 MM

6 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Organization of the Entergy Operating Companies’ planning and operating groups today l Long-Term Generation Planning l Fuel Procurement – Gas / Oil / Coal l Generation Operations Planning l Wholesale Purchases and Sales l Real-Time Generation Operations l Settlements and Reporting (power and fuel) System Planning and Operations (ESI) Energy Delivery [ESI Transmission] (some functions provided via ICT contract) NERC Functional Model Resource Planner Generation Owner Generator Operator Load Serving Entity Purchase-Selling Entity l Transmission Planning l Trans. Operations Planning l Real-Time Monitoring l Outage Coordination l Congestion Management l OATT Tariff Administration l Generator Imbalance Monitoring l Data Acquisition and Energy Accounting l Settlements and Reporting l Switching and Supervisory Control NERC Functional Model Transmission Planner Transmission Service Provider Transmission Owner Transmission Operator Reliability Coordinator Interchange Authority Balancing Authority

7 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS August 2009 EAI Stand Alone Implementation Study l Long-Term Generation Planning l Fuel Procurement – Gas / Oil / Coal l Generation Operations Planning l Wholesale Purchases and Sales l Real-Time Generation Operations l Settlements and Reporting (power and fuel) Entergy Arkansas (EAI)Energy Delivery [ESI Transmission] (some functions provided via ICT contract) NERC Functional Model Resource Planner Generation Owner Generator Operator Load Serving Entity Purchase-Selling Entity l Transmission Planning l Trans. Operations Planning l Real-Time Monitoring l Outage Coordination l Congestion Management l OATT Tariff Administration l Generator Imbalance Monitoring l Data Acquisition and Energy Accounting l Settlements and Reporting l Switching and Supervisory Control NERC Functional Model Transmission Planner Transmission Service Provider Transmission Owner Transmission Operator Reliability Coordinator Interchange Authority Balancing Authority

8 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS August 2009 EAI Stand Alone Implementation Study l Long-Term Generation Planning l Fuel Procurement –Gas / Oil / Coal l Generation Operations Planning l Wholesale Purchases and Sales l Real-Time Generation Operations l Settlements and Reporting (power and fuel) Entergy Arkansas (EAI)Energy Delivery Operations (some functions provided via ICT contract) NERC Functional Model Resource Planner Generation Owner Generator Operator Load Serving Entity Purchase-Selling Entity l Transmission Planning l Trans. Operations Planning l Real-Time Monitoring l Outage Coordination l Congestion Management l OATT Tariff Administration l Generator Imbalance Monitoring l Data Acquisition and Energy Accounting l Settlements and Reporting l Switching and Supervisory Control NERC Functional Model Transmission Planner Transmission Service Provider Transmission Owner Transmission Operator Reliability Coordinator Interchange Authority Balancing Authority Implementation: $18 MM On-going Labor: 64 FTEs Sensitivity Cases Implementation: ($5 MM) On-Going Labor: (8 FTEs) Implementation: $5 MM On-going Labor: 8 FTEs

9 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Baseline Scenario for Initial Real-Time Operations ( ) to limit Implementation Risk lThe August 2009 Stand Alone Implementation Study still provides baseline scenario which limits implementation risk –Two year implementation schedule –Implementation is largely under EAI’s control lThis is especially true when the sensitivity cases are considered and when other potential synergies with ESI are factored in: –Lease instead of build –Same location as ESI staff that will continue to perform the same functions for the other OPCOs [The Woodlands, Texas] –Share a single generation management system with ESI. –Utilize ESI personnel for support functions »Settlements and Reporting »Fuel Procurements »Training and Compliance »IT and generation management system support »Shared backup facilities

10 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Baseline Scenario for Initial Real-Time Operations lLong-Term Generation Planning lFuel Procurement –Gas / Oil / Coal lGeneration Operations Planning lWholesale Purchases and Sales lReal-Time Generation Operations lSettlements and Reporting (power and fuel) Entergy Arkansas (EAI)Energy Delivery (some functions provided via ICT contract) NERC Functional Model Resource Planner Generation Owner Generator Operator Load Serving Entity Purchase-Selling Entity l Transmission Planning l Trans. Operations Planning l Real-Time Monitoring l Outage Coordination l Congestion Management l OATT Tariff Administration l Generator Imbalance Monitoring l Data Acquisition and Energy Accounting l Settlements and Reporting l Switching and Supervisory Control NERC Functional Model Transmission Planner Transmission Service Provider Transmission Owner Transmission Operator Reliability Coordinator Interchange Authority Balancing Authority Implementation: $18 MM On-going Labor: 64 FTEs Implementation: $5 MM On-going Labor: 8 FTEs The above estimates may be reduced by as much as 50%

11 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS August 2009 EAI Stand Alone Implementation Study l Long-Term Generation Planning l Fuel Procurement –Gas / Oil / Coal l Generation Operations Planning l Wholesale Purchases and Sales l Real-Time Generation Operations l Settlements and Reporting (power and fuel) Entergy Arkansas (EAI)Energy Delivery (some functions provided via ICT contract) NERC Functional Model Resource Planner Generation Owner Generator Operator Load Serving Entity Purchase-Selling Entity l Transmission Planning l Trans. Operations Planning l Real-Time Monitoring l Outage Coordination l Congestion Management l OATT Tariff Administration l Generator Imbalance Monitoring l Data Acquisition and Energy Accounting l Settlements and Reporting l Switching and Supervisory Control NERC Functional Model Transmission Planner Transmission Service Provider Transmission Owner Transmission Operator Reliability Coordinator Interchange Authority Balancing Authority Implementation: $5 MM On-going Labor: 8 FTEs l Energy Delivery is updating its implementation estimates. l RTO participation may have more of an impact on these estimates.

12 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS How would an RTO membership impact the generation functions? l The actual impacts would depend on the specific market design – Maturity of the market – Proficiency of market interface systems / protocols l Most, if not all, of the generation real-time operating functions would still be required: – Outage planning, bilateral procurements, fuel procurements, unit commitment coordination, settlements, monitoring, etc. – Some changes would be required in carrying out the operating functions l Some additional staffing would likely be needed to interface with the market systems, verify settlements, manage financial transmission rights, participate in stakeholder meetings, etc.

13 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Successor Arrangements l Under the Successor Arrangement Strategic Option many of the Real Time Operations functions would be provided on a common basis for all the Entergy Operating Companies l However, there would be changes from the current way ESI-SPO and EAI operates these functions in the future, and some would depend on the outcomes of several events that will not be resolved until 2011 or after such as: – Entergy System RTO participation (MISO or SPP) – The exact terms and conditions of the Successor Arrangements l EAI will not develop detailed provisioning plan options for the Successor Arrangements Strategic Option until the above issues have been addressed

14 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS NEXT STEPS

15 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS “NO Regrets” Implementation Steps for 2013 and 2014 l The goals: – Be ready – Be flexible – Minimize implementation risk l EAI will continue to revise and maintain a plan to operate as a separate stand alone utility l Even if other strategic options are chosen, being able to stand alone provides an important “hedge” l EAI will proceed during with certain “no regrets” implementation activities. These “no regrets” activities are expected to include: – Provide AGC capability for selected EAI generating units – Upgrade EAI tie-line metering systems and communication equipment – Develop options and plans for flexible generation and fuel supplies – Develop options, plans, budgets for the baseline scenario

16 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Other Implementation Plan Activities for l Continue to explore opportunities with third parties that may improve the baseline scenario l We will update the status of these efforts in a future technical conference l Questions / Comments