June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.

Slides:



Advertisements
Similar presentations
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Advertisements

1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Acceptance Criteria for the Decay Solenoid Tom Bradshaw Mike Courthold Matthew Hills.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
MICE VC June 2009Jean-Sébastien GraulichSlide 1 Feed back from the DAQ review o Facts o Detector DAQ o Important Comments o Bottom line Jean-Sebastien.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
MOM report – part I Roumen Tsenov as MOM ( )
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab NFMCC 2010 Collaboration Meeting University.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Spectrometer Solenoid Update
MICE PM Report Progress with the Infrastructure A few problems
Spectrometer Solenoid Fabrication Status and Schedule
Teleconference ACS – FREIA 20th February 2018
Presentation transcript:

June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry Hart, NFMCC Friday Meeting, June 26, 2009 Decay Solenoid Target BM1 BM2 Details at

June 26, 2009TLH, NFMCC Friday Meeting2 Brief MICE news [Alain Blondel] 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified at the MICE TB on 22Jun09 2. Target: construction according to plan: installation in August still holds. 3. Spectrometer solenoid: as of 18Jun09 target was to start cooling today 4. Running plan A first go has been prepared in discussion between Marco-Linda (MOMs in sept-oct) and AB (see following) WE WILL NEED SHIFTERS (see later) 5. Data flow workshop next week (1st July?) production manager role will be defined (someone will be wanted!) 6. Wanted: volunteer/candidate for VC organization 7. Transnational Access (for EU) is in place Advertised in EUCARD and MICE front page 8. work in US (MRI proposal) and possibly CERN to reinforce RF power effort.

June 26, 2009TLH, NFMCC Friday Meeting3 ISIS Schedule [Yagmur Torun] From machine scheduling meeting (Jun 23): –User run (cycle 2009/01) ends tonight –Record beam current (230 A) achieved this week (Jun 23) –Machine physics Jun –Minor maintenance Jun 29-Jul 2 –Run-up Jul 3-5 –Next run (cycle 2009/02) Jul 7-Aug 13 Shielding decouples MICE from ISIS run, OPN will be extended to cover 2nd run cycle

June 26, 2009TLH, NFMCC Friday Meeting4 MICE Schedule [Yagmur Torun] Painting and electrical work in hall to be finished next week Need to clean up before moving lots of air A/C test with full load (DS compressor on) Decay solenoid in operation early July Remove shielding during August shutdown Hook up magnets in DSA Target installation in vault

June 26, 2009TLH, NFMCC Friday Meeting5 DAQ Review [Jean-Sebastien Graulich] One day review forOne day review for MICE Data Acquisition AND Controls –At RAL on June 4 th external Reviewers4 external Reviewers –Pierre Vande Vyvre (Chair); CERN ALICE –Fritz Bartlett; FNAL D0 –Tim Nicholls; RAL T2K –Emilio Radiccioni; INFN Bari TOTEM 1 Internal Reviewer1 Internal Reviewer –John Cobb; Oxford

June 26, 2009TLH, NFMCC Friday Meeting6 DAQ “Bottom Line” [Jean-Sebastien Graulich] The DAQ Review is Done !The DAQ Review is Done ! Very useful comments have been receivedVery useful comments have been received Detector DAQ appears to be in shape and should allow data taking for Step III and beyondDetector DAQ appears to be in shape and should allow data taking for Step III and beyond Unified Controls, Data Flow and Online Database are more recent projects and the committee has noticed it’s not yet matureUnified Controls, Data Flow and Online Database are more recent projects and the committee has noticed it’s not yet mature –Need better integration DAQ/Controls –More thinking on Online Data Buffer Disk Access Serious concern about the man power available on ControlsSerious concern about the man power available on Controls –Call for attention from the management The Control and DAQ Project is not yet over...The Control and DAQ Project is not yet over...

June 26, 2009TLH, NFMCC Friday Meeting7 Spectrometer Solenoid Update [Steve Virostek] An internal leak had developed between the cryostat and the magnet insulating vacuum in early May –Significant effort and some level of disassembly was required to locate and repair the leak –Leak was determined to be at an internal Conflat flange Magnet is repaired and leak tight and has been under vacuum for the past 6 days Insulating vacuum is ready for magnet cool down (today) The required cryogens (LN and LHe), the FNAL LN supply control system and an improved LHe transfer line (and procedure) are all in place Original first magnet cold mass has been modified and is ready for re- installation of the MLI –Additional cryostat penetrations and extra vent line added –Modification of fill line is complete

June 26, 2009TLH, NFMCC Friday Meeting8 Spectrometer Solenoid Upcoming Tasks [Steve Virostek] Complete the LN and LHe cool down of the magnet (approximately a 1 week process) Run the system at operating temperature for ~24 hours to ensure recondensing system is functional Power the magnet and train coils Warm up for shipping to FNAL

June 26, 2009TLH, NFMCC Friday Meeting9