Midway Design Review Advisor: Professor Russell Tessier Team: Michael Shusta Lucas Root Brandon Thorpe Gilbert T. Kim.

Slides:



Advertisements
Similar presentations
Point of Sale (POS) Client & Back Office Server. Operational Concept What is our Objective? What is our Objective? What are our Goals? What are our Goals?
Advertisements

User Interface Design.
Team WEOP (Wireless Entertainment & Ordering Pager) ECE 4007 – L03 Preliminary Design Review Presentation Team Members: Earl CuencaAlex Groleau Kirk PoucherOmar.
Department of Electrical and Computer Engineering He Zhou Hui Zheng William Mai Xiang Guo Advisor: Professor Patrick Kelly ASLLENGE Midway Design review.
Team 03 Department of Electrical and Computer Engineering 20 November 2014 Digital Fitness Trainer MDR.
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
Team Flying Camels Nawar Chaker Pete Dokter Tim Jacobs Adam Swartley Paul Savage Capstone Project February 24, 2005.
Exhaust Emissions Analyzer Introduction In a day when global CO 2 levels are one of the greatest concerns of society, surprisingly few advances have been.
Department of Electrical & Computer Engineering Advisor: Professor Michael Zink Team: Brigit Lyons Fadi Maalouli Tony Panetta Renzo Silva Final Project.
Department of Electrical & Computer Engineering Advisor: Professor Michael Zink Team: Brigit Lyons Fadi Maalouli Tony Panetta Renzo Silva Midway Design.
1 Electrical and Computer Engineering Cameron Proctor Ramsey Khudairi Thomas Gilbert Chad Young MDR Presentation TekBand.
Department of Electrical & Computer Engineering Advisor: Michael Zink.
1 Electrical and Computer Engineering Cam Proctor Ramsey Khudairi Tom Gilbert Chad Young Project Orion TekBand.
Department of Electrical and Computer Engineering MDR Presentation Team Frij.
Comprehensive Design Review Team Tessier: Brandon Thorpe Lucas Root Michael Shusta Telin Kim.
Flatiron Mobile Device Security Monitor Thomas Horacek Lucas Greve.
1 Application Accessory For Cellular Phone - Characterization Presentation - Performed by: Avi Feldman Omer Kamerman Project instructor: Boaz Mizrachi.
Department of Electrical & Computer Engineering Preliminary Design Review Team: Lucas Root Telin Kim Brandon Thorpe Michael Shusta Advisor: Professor Tessier.
Final Project Review Team Tessier Brandon Thorpe Michael Shusta Telin Kim Lucas Root.
Chapter 9: Moving to Design
Mathieu Stephan, EPFL. Why? Create a complete product Remotely control your music player Get information about the tracks being played Get calls / listen.
FPR Presentation Team Frij
Building an Application Server for Home Network based on Android Platform Yi-hsien Liao Supervised by : Dr. Chao-huang Wei Department of Electrical Engineering.
Performed by : Segev Eran Rokach Oren Supervisor: Michael Itzkovitz. המעבדה למערכות ספרתיות מהירות High speed digital systems laboratory הטכניון - מכון.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
Computerized Train Control System by: Shawn Lord Christian Thompson.
Title : Intelligent battery charger Supervisor : Maeve Duffy Student : Noel Walsh.
Group Members: Brad Cox Kevin Burkett Tera Cline Arthur Perkins CS10 Battery Management System.
Supply chain management is only the beginning Tim Lopes, Sergio Marrero, & Michelle Spivak April 17th 2007.
NETWORK CENTRIC COMPUTING (With included EMBEDDED SYSTEMS)
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
DEC0905 Remote Control of Home Appliances ABSTRACT The objective of this project is to enable users to remotely control home appliances and systems over.
Electrical & Computer Engineering Presentation by: Andrew Frieden Matthew Weydt Nick Setzer Tyler Dunn PDR 2012 – Team Gong Self Sustaining Sensor System.
Flatiron Mobile Device Security Monitor Thomas Horacek Lucas Greve.
Department of Electrical and Computer Engineering Team BeepachU November 26, 2013 Midway Design Review.
1 Department of Electrical and Computer Engineering Advisor: Professor Hollot Team RCA March 1, 2013 Cumulative Design Review.
Traumatic Brain Injury Eyewear “TB-Eye” Todd Biesiadecki, Matthew Campbell, Matthew Vildzius ECE4007 L03 EM1 Advisor: Erick Maxwell December 14, 2011.
Scott Coffin Adam Faucher Jason Graika Brian Voelz Client: Honeywell Advisor: Dr. Zhengdao Wang.
ECE415 Senior Design Project Spring 2009 FPR Presentation Robert Basile Rowan Oberski Qiaowen Zheng Danxiang Li Faculty Advisor: Russell Tessier Enjoy.
FTP Server and FTP Commands By Nanda Ganesan, Ph.D. © Nanda Ganesan, All Rights Reserved.
CHAPTER TEN AUTHORING.
Data Logger For Mechanical Systems Group 2: Abdulrahman Al-Malki Faisal Al-Mutawa Mohammed Alsooj Yasmin Hussein 1.
Dec07-02: Prototype Parking Meter Phase 8 Bret Schuring: Team Leader Pooja Ramesh: Communications Wilson Kwong, Matt Swanson, Alex Wernli.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
9 Systems Analysis and Design in a Changing World, Fourth Edition.
Scott Coffin Adam Faucher Jason Graika Brian Voelz Client: Honeywell Advisor: Dr. Zhengdao Wang.
Final Presentation Senior Design II November 19, 2013 MyBand Fitness [1]
Traumatic Brain Injury Eyewear “TB-Eye” Todd Biesiadecki, Matthew Campbell, Matthew Vildzius ECE4007 L03 EM1 Advisor: Erick Maxwell October 31, 2011.
Android Multi-Meter (AMM)
© 2013, published by Flat World Knowledge Chapter 10 Understanding Software: A Primer for Managers 10-1.
Faculty Coach: Professor Martinez  Justin Mahar  Chris Baum  Greg Schmitz  Adam Abdelhamed.
Architecture View Models A model is a complete, simplified description of a system from a particular perspective or viewpoint. There is no single view.
Daredevil Robot Direction Module (DRDM) Senior Design II Midterm Presentation.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
Chapter 5 Introduction To Form Builder. Lesson A Objectives  Display Forms Builder forms in a Web browser  Use a data block form to view, insert, update,
Plasma Sense Amplifier
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
Department of Electrical and Computer Engineering Team BeepachU March 3, 2014 Comprehensive Design Review.
1 Department of Electrical and Computer Engineering Advisor: Professor Hollot Team RCA December 5, 2012 Midway Design Review.
Project May07-14: Restaurant Automation April 24, 2007.
Smart Streetlight Proof of Concept Group 3 03/26/16 Tucker Russ Thor Cutler Brandon Berry Anthony Giordano.
Modular Swimming Pace Aid ECE 445 Group Members: Igor Fedorov, Ryan Cook, Michael Chan Professor Carney (TA Ryan May)
<Add team picture or relevant project picture here>
Midway Design Review Team Digiceipt December 4,
Final Project Review Team Digiceipt April 19,
ECE 477 Final Presentation Team 15  Spring 2010
Midway Design Review __________ Senior Design Project Fall 2018
ECE 477 Final Presentation Team 13  Spring 2011
Windows Operating System
Presentation transcript:

Midway Design Review Advisor: Professor Russell Tessier Team: Michael Shusta Lucas Root Brandon Thorpe Gilbert T. Kim

Outline MDR Deliverables and PDR Concerns Development Approach Design Decisions and Progress Current and Projected Costs Patenting and Competition Meeting MDR Goals CDR Goals

MDR Deliverables PDR Concerns For MDR: –IDB finalized with preliminary implementation –Locking mechanism design and prototype –Simple routines on the AIRcable –BlackBerry “hello world” PDR Concerns: –Current and power requirements –Power storage and delivery –Cost of device in pilot run –Competing technology

Development Approach Weekly PowerPoints to update progress –Discuss and plan design of hardware and software components –Group insight into individual problems –Motivate progress Team account Subversion for code and group documents, repository of resources

System Overview Client Server Bluetag Database Store Inventory Locked Item Department of Electrical & Computer Engineering

System Elements

Server: IDB

IDB Can establish RSA secure XML based channel with client software Can connect to and query the Bluetag database as well as a demo store database Currently handles client requests synchronously, multi-threading is incomplete MDR goals met

Lock Mechanism View via Prototype Demo –Linear, Pull-type, Spring-Loaded Solenoid –Rotating Latch Holds Clothing Pin –Coil Suppressor –Solid-State Relay Control –See MDR Design Report for in-depth discussion of physics, parts selection, force diagrams, etc.

SolidWorks View 3D printed using ABS plastic/photopolymer resin Assemblies can be verified/animated before fabrication

AIRcable Update Purchased chip and hand-soldered to DIP connector Ran simple routines on the AIRcable, met MDR goal Unstable system Discontinued product line

AIRcable Debugging Ability to connect to and program AIRcable sporadic Troubleshooting steps: –Installed and learned Linux Bluetooth support –Visual inspection, ohmmeter check –Pin voltage under different operating conditions –Continued dialog with development team What went wrong? –Damage while soldering –Faulty chip –Damaged during operation

Tag Bluetooth Redesign Separate module and microcontroller with UART communication Roving Networks RN-41: –Small, low power, configurable, DIP breakout, low cost, UART, widely used PIC 16F688: –Small, low power, low cost, UART, DIP, advanced development tools TXRX TX RN-4116F688

Powering Bluetag Bluetooth Module and Microcontroller –Rn-41: 30 mA connected, mA deep sleep at 3.3 V –16F688: 640 uA normal operation, 11 uA deep sleep at 3.3V Solenoid –SS2EP: 7W at 100% duty cycle at ~3.3V  Important Specification: peak power delivery of battery system must be at least 7.101W (solenoid + transceiving)

Battery Life Estimate Assumption: The idle mode dissipation (8.23mW) of the control circuitry dominates its power demands Performance Metrics: One: Assume an up-time and estimate the maximum number of purchases Two: Assume a maximum number of purchases and estimate the up-time Powering Bluetag

Battery Life Estimate β is the total energy capacity of the battery system in Joules ∆t is the duration of time the solenoid is energized u is the number of hours between recharging τ is the number of purchases Ex. Let u = 8 hours, ∆t = 5 seconds and a battery of 8 W-h is used: lock would last 816 cycles before fully exhausting its battery Ex. Setting τ=5 for an 8 W-h battery with ∆t = 5 seconds gives an uptime of 966 hours, or about 40 days

What do these metrics tell us? Battery must deliver high transient power a few times per charge Clothing pin should be spring-loaded to minimize power draw window Lithium-ion battery is proper choice: -highest energy density per unit weight of commercial chemistries -available rechargeable, cell voltage near 3.3V -see MDR Design Report for in-depth discussion What don’t these metrics tells us? Probabilistic model of battery life (purchasing is a Poisson process!) Relationship between mass, volume and capacity of batteries Battery terminal design techniques Powering Bluetag

Programming the BlackBerry Decided on BlackBerry JDE Plug-in for Eclipse –Involved configuration but familiar environment Use of Simulators Enabled real-time phone monitoring

Basic Flow of the Graphical UI Window One: Input username and password Window Two: Item ID entry Window Four: Continue Shopping Yes Window Three: Item info & confirm purchase YesNo

The BlackBerry UI APIs Screen components -Standard screen layout -Default menu Field components -Standard UI element for options, check boxes, lists, text fields & labels, and progress bar controls Layout managers -Horizontal -Vertical -Left-to-Right flow

User Interface Progress Simple UIs using BlackBerry simulators Formatted and installed UIs on BlackBerry

Progress Block Diagram HelloWorld Wrote UI w/ Java Sample GUI GUI (JavaUI  BlackBerry GUI) HelloWorld LabelField RichTextField Sample GUI HorizontalFieldManager VerticaltalFieldManager BitmapField Bitmap LabelField BasicEditField EditField Accomplished Processing

Current and Projected Costs Prototype Cost: $193 - $243 –PIC 16F688: $2.31 –Lithium Ion Battery: $10 –Ledex 2EP Solenoid: $20 –Crydom SRR: $1 –3D Printing: $75-$125 –PCB Fabrication: $50 –RN-41: $34.91 Development Costs: $49.66 –PIC Development Board: $15.95 –PICKit 3: $33.71

Patenting and Competition Met with CVIP Director Nick DeCristofaro –Proceed after prototype –One year window after disclosure Potential Competition Includes: –Phone based barcode scanners –Resonant tags with data storage –DoCoMo cell phone purchasing

MDR and CDR Goals All MDR goals met –IDB –AIRcable –Lock Design –BlackBerry Programming CDR Goals –UI completed –Full SolidWorks –PCB –Embedded Programming