Knoxville, TN October 20, 2009 OpenADE Status and Plans Dave Mollerstuen

Slides:



Advertisements
Similar presentations
SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
Advertisements

“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Knoxville, TN Oct. 19, 2009 AMI-Enterprise Systems Requirements Specification Overview.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
May SG Communications Overview Matt Gillmore 02/27/2012.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
OpenFMB Specification Development Plan
8/28/2005ECEN5543 Req Elicitation1 Targets of Requirements Engineering ECEN 5543 SW Engineering of Standalone Programs University of Colorado, Boulder.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
1 Accelerating Standards for the Smart Grid David Wollman National Institute of Standards and Technology
EU Commission Task Force for Smart Grids Expert Group 3: Roles and Responsibilities of Actors involved in the Smart Grids Deployment Samia Benrachi-Maassam.
Jerry FitzPatrick, NIST Chair Wednesday, May 26. Introduction - IKB PAP8 PAP14 DEWG Charter What should the T&D DEWG be doing? T&D DEWG or T and D DEWGs?
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
SMART METER TEXAS Status Update July 29, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
PAP 10 UCAIug OpenSG Customer Domain Involvement.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
Facility Smart Grid Information Model
INTERNATIONAL ELECTROTECHNICAL COMMISSION © IEC:2007 PC118 WG1 Draft Framework China PC 118/WG1 Meeting, , Santa Clara.
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
1 OpenADR Taskforce Chair – Albert Chiu Co-chair – Ed Koch Technical Editors – Bruce Bartell, Gerald Gray.
OpenADE Knoxville Meeting February 27 – March 1, 2012 David Mollerstuen, OpenADE TF Chair Steve Van Ausdall, OpenADE TF Vice-Chair.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Doc.: IEEE /0047r1 Submission SGIP Liaison Report to IEEE Following the SGIP (2.0) Inaugural Conference Nov 5-7, 2013 Date:
SMART METER TEXAS Status Update June 3, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou.
OpenADE: Roadmap, ITCA, Sample Implementation November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair.
NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting Presentation to Energy Interoperation.
OpenSG Closing Plenary Knoxville February, UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
May 2010 Slide 1 Submission Title: OpenSG Tysons Corner OpenADE Boot Camp Source: OpenADE Task Force Abstract: SG Systems OpenADE Task Force Boot Camp.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Advanced Metering Implementation Team (AMIT) Update to RMS Presented by Christine Wright August 17, 2011
OpenADE: Agenda, SGIP PAP10, NAESB ESPI November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair.
3rd Party Update To RMS November 20, 2013 Bob Frazier Senior Director of Electric Technology CenterPoint Energy (representing SMT JDOA)
Dec UtilityAMI OpenHAN TF Requirements Working Group Specification Briefing January 2008.
NAESB Smart Grid Standards Task Force PAP10 Discussion William Cox —
OpenADE: OpenADE, ESPI, OpenADE 2.0 Scope November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair.
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
IEC TC57 Smart Grid Task Force Ed Dobrowolski for Scott Neumann 16 June 2010.
OpenHAN TF Meeting Where do we go next? Erich W. Gunther.
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Opening Report] Date Submitted: [February 1st, 2010] Source: [Don.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
OpenHAN SRS v1.95 Overview June 8, OpenHAN SRS v Introduction  OpenHAN area of focus within the NIST conceptual model.
Managers Guide to AMI Enterprise. AMI Enterprise What it is Why you need to be involved How you get involved Who from your organization needs to be involved.
March 2011 Slide 1 Submission Title: OpenSG San Francisco OpenADE Boot Camp Source: OpenADE Task Force Abstract: SG Systems OpenADE Task Force Boot Camp.
Slide 1 EIM Charter Identify and articulate common EIM requirements: Use cases System Requirements Specification (SRS) Work with other OpenSG groups, particularly.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
OpenADR Taskforce. OpenADR and NIST Smart Grid Roadmap Conceptual Model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task Force Re:
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
[WP1] T1.2 User and Business Requirements
AMI Enterprise Task Force of the Utility AMI Working Group
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
IEC TC57 Smart Grid Activities
Smart Grid Update – January 2011
Presentation transcript:

Knoxville, TN October 20, 2009 OpenADE Status and Plans Dave Mollerstuen

Knoxville, TN October 20, 2009 Topics OpenADE Overview OpenADE Status Business and User Requirements Document Systems Requirement Specification NIST Priority Action Plan (PAP) 10 OpenADE Futures Request for Participation Q & A

Knoxville, TN October 20, 2009 OpenADE Overview What Standardized Machine-to-Machine (M2M) interface that permits utilities to share, at the consumer’s request and under the consumer’s direction, a broad set of that consumer’s utility data with specific 3 rd Parties. Who Consumers! Utilities (T&D, REPs) 3 rd Parties (Residential Energy Management, Demand Response Aggregators, Distributed Generation, etc.) Why Increased efficiencies, increased reliability, … (i.e. “Why SmartGrid?”) Standardizes interface: reduces implementation costs, time to market

Knoxville, TN October 20, 2009 Topics OpenADE Overview OpenADE Status Business and User Requirements Document Systems Requirement Specification NIST Priority Action Plan (PAP) 10 OpenADE Futures Request for Participation Q & A

Knoxville, TN October 20, 2009 OpenADE Status OpenADE Activities –Weekly webconference (Thursdays 11a PDT / 2p EDT) –Weekly teleconference w/ ASAP-SG around OpenADE security considerations, ASAP-SG 3 rd Party Data Access profile –NIST PAP 10 Participation August / September PAP Workshops Addressing numerous PAP objectives

Knoxville, TN October 20, 2009 OpenADE Status OpenADE Participants (sampling) Utilities3 rd PartiesConsumerGovernment Consumers EnergyTendril NetworksCitizens Utility Board (State of Illinois) NIST Florida Power and LightGoogleUCANPUC Texas OncorGreenboxNIST Pacific Gas and ElectricComverge ReliantJuice Technologies Southern California EdisonE:SO San Diego Gas & ElectricEfficiency 2.0 DominionCIMple Solutions Xtensible SolutionsIBM Microsoft Ecologic Analytics IntellEnergyUtil (IEU) Sensus Sonoma Innovation

Knoxville, TN October 20, 2009 OpenADE Status Business and User Requirements Document –Progressed to v0.98; currently under balloting within TF –Hope to call for OpenSG vote here in Knoxville Systems Requirements Specification –At v0.10 –Some discussion to date, expect to focus almost exclusively on SRS post-Knoxville Will discuss both documents in Knoxville breakouts

Knoxville, TN October 20, 2009 Topics OpenADE Overview OpenADE Status Business and User Requirements Document Systems Requirement Specification NIST Priority Action Plan (PAP) 10 OpenADE Futures Request for Participation Q & A

Knoxville, TN October 20, 2009 Business and User Requirements Business and User Requirements Table of Contents 1.0INTRODUCTION 1.1Introduction to Automated Data Exchange 1.2Purpose of Document 1.3Terms and Definitions 2.0OPENADE BUSINESS RATIONALE 2.1Background 2.2Opportunity 2.3Objectives and Success Criteria 2.4Risks 2.5Specific Business Requirements 3.0OPENADE VISION 3.1Project Vision Statement 3.2Major Features 3.3Assumptions and Dependencies 4.0OPENADE 1.0 SCOPE 4.1Scope of Initial Release 4.2Scope of Subsequent Releases 4.3Limitations and Exclusions 5.0OPENADE CONTEXT 5.1Stakeholder Profiles 6.0OPENADE USE CASES 6.1ADE Authorization - Consumer Grants Permission 6.2ADE Authorization - Consumer Extends Permission 6.3ADE Authorization – Consumer Terminates Permission 6.4ADE Publication - Utility Provides Consumer Data to 3rd Party APPENDIX A BEST PRACTICES A.1 Authorization Termination Requests Initiated at the 3rd Party Web Site A.2 Utility Presentation of Indemnification Clause

Knoxville, TN October 20, 2009 Business and User Requirements 4.1Scope of Initial Release OpenADE 1.0 will be limited to the functions required for a Utility to provide a Consumer’s consumption data to an authorized, specific 3rd Party. Availability of that data will be in accordance with industry best practices and / or jurisdictional requirements. 4.2Scope of Subsequent Releases Subsequent versions of OpenADE will include access to the following Consumer Utility Data elements: Pricing information Network events HAN and configuration information

Knoxville, TN October 20, 2009 Topics OpenADE Overview OpenADE Status Business and User Requirements Document Systems Requirement Specification NIST Priority Action Plan (PAP) 10 OpenADE Futures Request for Participation Q & A

Knoxville, TN October 20, 2009 System Requirements Specification System Requirements Specification Table of Contents 1Introduction 1.1Purpose 1.2Scope 1.3Acronyms and Abbreviations 1.4External Considerations and References 1.5Document Overview 2Architecture Overview 2.1Architecture Vision 2.2Architecture Guiding Principles 2.3Architectural Considerations 3OpenADE Systems Architecture 3.1OpenADE Business Architecture View 3.2Integration Requirements Specification 3.2.1Functional Requirements – Business Processes 3.2.2Functional Requirements – Integration Services 3.2.3Technical Requirements – Integration Services 3.3OpenADE Application Architecture View 3.4OpenADE Data Architecture View 3.4.1Meter Reading and Event View 3.5OpenADE Technical Architecture View 3.5.1Security Standards 3.5.2Service Patterns 3.5.3Governance 4Appendices 4.1Terms and Definitions

Knoxville, TN October 20, 2009 Topics OpenADE Overview OpenADE Status Business and User Requirements Document Systems Requirement Specification NIST Priority Action Plan (PAP) 10 OpenADE Futures Request for Participation Q & A

Knoxville, TN October 20, 2009 NIST PAP 10 PAP 10: One of 14 Priority Action Plans identified by NIST, focused on “Standard Energy Information Usage” UCAIug took most of organizational responsibility at August, September NIST Smart Grid Workshop Meetings Objective 2: “Develop short term plans for near- term customer access to usage data based upon today’s installed meters.” – aka OpenADE

Knoxville, TN October 20, 2009 NIST PAP 10 Remaining PAP Objectives focused on collecting requirements around canonical expression of metering information: –OBJECTIVE 1: Develop a summary of information needs for various means of customer information access about metering and billing. Develop requirements as quickly as possible, then reach out to SDOs to vet them and look for harmonization. –OBJECTIVE 3: Develop composite information model that can be easily transformed without loss for transport via standards in OASIS, IEC61970/61968, IEC61850, ANSI C12.19/22, AHRAE 135, and ZigBee SEP 2 Significant dependencies on PAP 3 (Common Pricing) and PAP 4 (Common Scheduling)

Knoxville, TN October 20, 2009 NIST PAP 10 Next steps –Work with mailing list participants to refine PAP objectives –Marshal existing definitions, participants to drive requirements elicitation PAP 10 Home: NIST Smart Grid PAP 10 Mailing List: David Wollman to join mailing

Knoxville, TN October 20, 2009 Topics OpenADE Overview OpenADE Status Business and User Requirements Document Systems Requirement Specification NIST Priority Action Plan (PAP) 10 OpenADE Futures Request for Participation Q & A

Knoxville, TN October 20, 2009 OpenADE Futures 10/2009: OpenSG approves OpenADE 1.0 Business and User Requirements 10/2009: Initial draft of OpenADE 1.0 System Requirements Specification 10/2009: Initiate OpenADE 1.0 Services definition 11/2009 (?): Begin OpenADE 2.0 user requirements elicitation 01/2010: OpenSG approves OpenADE SRS / Services / Schemas

Knoxville, TN October 20, 2009 Topics OpenADE Overview OpenADE Status Business and User Requirements Document Systems Requirement Specification NIST Priority Action Plan (PAP) 10 OpenADE Futures Request for Participation Q & A

Knoxville, TN October 20, 2009 Request for Participation Documents available on: –OpenSG SharePoint –SmartGridiPedia Breakout Sessions tomorrow (agendas TBD) –9:30a to 12:00p –1:00p to 2:00p (Joint session with SG Security) –2:00p to 5:30p Weekly Calls –Thursdays 11a PDT / 2p EDT Reflector – to join (or for other requests): Dave Mollerstuen Steven Van Ausdall

Knoxville, TN October 20, 2009 Topics OpenADE Overview OpenADE Status Business and User Requirements Document Systems Requirement Specification NIST Priority Action Plan (PAP) 10 OpenADE Futures Request for Participation Q & A

Knoxville, TN October 20, 2009 Q&A