Fp7 - LEADER Slide 1 ALFRED C&S rods mechanical design C&S_Rods_20121120.ppt Task 3.3 - Primary system conceptual design of ALFRED Control rods & Safety.

Slides:



Advertisements
Similar presentations
Exploring the Four Forces of Flight
Advertisements

Pneumatic Valves Lesson 4.
GMC Motorhomes International
Fp7 - LEADER Slide 1 ALFRED C&S rods mechanical design FA_ ppt Task 2.4 – Mechanical Design & Drawings of LFR and ETDR Fuel Assemblies (mech. Design)
Module 3 Practical Tasks
CARBURETOR CIRCUITS AND COMPONENTS
Hydraulic Power Assist
Pneumatic Components & Systems Team 1640 Clem McKown – mentor November 2008.
-By Atul Gosavi - Guided by Prof. N.P. Jadhav SEMINAR ON.
GI/EMME series TRAining CEntre Burner setting. TRAining CEntre Setting sequence: OIL PRESSURE SETTING : Pump and pressure regulator AIR QUANTITY SETTING.
WASH Cluster – Groundwater Pumping GWP GWP1 1 Groundwater Pumping Session 1 Handpumps.
© 2012 Pearson Education, Inc. Q6.1 A. The cable does positive work on the elevator, and the elevator does positive work on the cable. v Motor Cable Elevator.
Development of single actuator circuits
Booster System Basics: Constant Speed Systems
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
Simple Carburettor Fuel System for a Piston Engine
NITRO SHOCK ABSORBERS.
For precision and control
PIT Crew Design Concepts By Dan Chapman, Tim Wilson, and Jon Miller December 11, 2002.
Control System Components Topic: Actuators and Valve Positioner
Actuators.
HYDRAULICS & PNEUMATICS
HYDRAULICS & PNEUMATICS
Logic Operations in Electro-Pneumatics
Pneumatic Hybrid – An alternative to electric hybrid (?) Bengt Johansson Sasa Trajkovic, Div. of Combustion Engines Lund University
Lease Automatic Custody Transfer
Submitted by Waris jamal Praveen kumar gautam Shiv pratap singh Ramashwar kumar singh Under the guidence of Prof.safiulla khan.
Modern Automotive Technology PowerPoint for by Russell Krick
Propellers The engines are equipped with four bladed, full
Thermal hydraulic analysis of ALFRED by RELAP5 code & by SIMMER code G. Barone, N. Forgione, A. Pesetti, R. Lo Frano CIRTEN Consorzio Interuniversitario.
Experimental Study of Graphite Dust Generated from Fuel Pebble Elements of HTRs Zhou Hongbo 1, Shen Ke 1, Yu Suyuan 2* Institute of Nuclear and New Energy.
Hydraulic Symbols. Piping and Tubing Symbols Normal working line Flexible working line Pilot line Drain line Enclosure outline Direction of flow.
Vacuum system.
LEADER WP3: Conceptual Design Status L. Mansani
CHAPTER 11 PNEUMATICS TRANSMISION
ALFRED System Configuration Luigi Mansani
Hydraulic Booster System High Pressure (Supply) Low Pressure (Return)
1 Kaspar Kööp, Marti Jeltsov Division of Nuclear Power Safety Royal Institute of Technology (KTH) Stockholm, Sweden LEADER 4 th WP5 MEETING, Karlsruhe.
ALFRED Control Rod and Safety Rod
PISTON ENGINE PROPULSION Chapter 5 Fuel Systems 1933 Alvis Engine 2014 Hyundai Engine Simple Carburettor Fuel System for a Piston Engine.
HYDRAULICS & PNEUMATICS
LEADER WP3 Conceptual Design Status KIT Campus North, Karlsruhe, Luigi Mansani
Liquids -They always take the shape of their container -They flow or you can pour them.
Instrumentation and Control Drawings
Engineering Concepts Chapter 5 Terms. ACTUATOR A device that transfers fluid or electrical energy into mechanical energy.
PRESENTATION ON CAMLESS ENGINE
Flow Characteristics of Port Fuel Injection System P M V Subbarao Professor Mechanical Engineering Department Matching of Injector with Engine Requirements.
WORK Work = Force x Distance POWER power = work done ÷ time taken ENERGY 1-POTENTIAL ENERGY (Potential Energy = Force x Distance ) 2-KINETIC ENERGY Energy.
Fluid Power Control.
Enrollment No Name of Student: PAREKH KISHAN JAGDISHBHAI.
Fluid Power Control FLUID POWER INTRODUCTION TO PNEUMATICS # Learning Objectives : Upon completion of this chapter, Student should be able to …  Describe.
Motor Performance Beach Cities Robotics – Team 294 Andrew Keisic November 2009.
Linear actuator Cylinders Single acting Double acting
Double Acting Cylinder
Engineering II – August 2016
Newton’s Laws Practice
LANDING GEAR SYSTEMS THIS TRAINING MANUAL HAS BEEN PREPARED FOR MAINTENANCE TECHNICIANS AND DOES NOT SUPERSEEDED INFORMATION CONTAINED IN APPLICABLE AIRCRAFT.
HYDRAULICS & PNEUMATICS
Automotive Engines Theory and Servicing
Pneumatics Module 9 Time delay valve.
Logic Functions Pneumatics Module 7.
Actuators and output devices
Actuators and directional control valves
Chapter 40: Engines and motors
Diesel Automotive Engines
Korea University of Technology and Education
COMMON RAIL FUEL INJECTION SYSTEM
Module – 4: Single Acting Cylinder
Hydraulic Component: Actuator
Automotive Engines Theory and Servicing
Presentation transcript:

Fp7 - LEADER Slide 1 ALFRED C&S rods mechanical design C&S_Rods_ ppt Task Primary system conceptual design of ALFRED Control rods & Safety rods (mech. Design) The LEADER project ALFRED core layout Basic concepts C/R design S/R concept Status TOC F. Manni (S.R.S.) D. Vitale Di Maio (S.R.S.) LEADER Technical Meeting November , 2012 Karlsruhe Institut of Technology

Fp7 - LEADER Slide 2 ALFRED C&S rods mechanical design C&S_Rods_ ppt 171 Fuel Assembly 12 Control Rods 4 Safety Rods 108 Dummy Element ALFRED Core Layout Ø 158

Fp7 - LEADER Slide 3 ALFRED C&S rods mechanical design C&S_Rods_ ppt 600 Fully extracted Fully inserted 680 Lead free level (in operation) 3730 Basic Concepts Fully extracted Fully inserted Diagrid top plane Control RodSafety Rod Core middle plane Scram: buoyancy Tuning: stepper motor Scram: gravity + booster F/A

Fp7 - LEADER Slide 4 ALFRED C&S rods mechanical design C&S_Rods_ ppt Lead Free Level (during operation) Core Active zone C/R S/R Diagrid F/A Drag Ballast Weight Buoyancy ±20% Refueling Operation Preloaded Spring counteracting buoyancy effects.. ±20% Ballast Preloaded Springs Top Grid Basic Concepts

Fp7 - LEADER Slide 5 ALFRED C&S rods mechanical design C&S_Rods_ ppt Control Rod design Both Control and Scram purposes Control: absorber pin bundle actuated by stepper motor driven worm gear Scram: buoyancy driven (upward insertion) Only electrical connections required features: notes: The very large gas plenum implies a big buoyancy force and the need for additional ballast which does not fit in the "standard" ballast housing (room found anyway on the top) Spring press re-designed in order to host worm gear (for actuation) and additional ballast (unification of F/A spring presses required)

Fp7 - LEADER Slide 6 ALFRED C&S rods mechanical design C&S_Rods_ ppt Gas plenum Reflector Absorber C/R design Lower half Reflector Float Spike Absorber pin bundle

Fp7 - LEADER Slide 7 ALFRED C&S rods mechanical design C&S_Rods_ ppt Absorber Reflector Gas plenum (very large!) 1340 Reflector 30 6 C/R design Absorber Bundle layout (from MYRRAH to ALFRED) Increased peripheral gap

Fp7 - LEADER Slide 8 ALFRED C&S rods mechanical design C&S_Rods_ ppt nut solenoid worm Control Scram C/R design Stepper Motor Float Actuation

Fp7 - LEADER Slide 9 ALFRED C&S rods mechanical design C&S_Rods_ ppt Ballast Standard (282 kg) Additional (83 kg) C/R: 623 kg C/R design Due to the very large gas plenum additional ballast is needed to counteract buoyancy Total mass 365 kg

Fp7 - LEADER Slide 10 ALFRED C&S rods mechanical design C&S_Rods_ ppt C/R design Spring Press Top Grid Belleville washers Stepper Motor

Fp7 - LEADER Slide 11 ALFRED C&S rods mechanical design C&S_Rods_ ppt Preliminary evaluation of the insertion transient Lead flow and stopping time impacts on the insertion time are not considered in the preliminary evaluation. A preliminary insertion time of about 0.85 s has been estimated; considering the negative acceleration for the arrest, the insertion time is longer but should be shorter than 1 s. C/R design

Fp7 - LEADER Slide 12 ALFRED C&S rods mechanical design C&S_Rods_ ppt Safety Rod concept Just scram, not regulation Scram: gravity driven (downward insertion) pneumatic booster system needed to speed up insertion Electrical and Pneumatic connections (Hi and Lo pressure lines) required features: notes: Very small gas plenum (reduced buoyancy problems) Structural design and interfaces similar to C/R and F/A

Fp7 - LEADER Slide 13 ALFRED C&S rods mechanical design C&S_Rods_ ppt Absorber Reflector 60 Reflector S/R Concept Very small Gas plenum (not necessary) Reduced buoyancy Provisional Layout!

Fp7 - LEADER Slide 14 ALFRED C&S rods mechanical design C&S_Rods_ ppt A1 A2 << > A1' A2 D d F1 < F2 (P1 A1 < P2 A1) F1 >> F2 (P1 A1 >> P2 A1) P1 P2 F1 F2 F1 F2 Low pressure chamber High pressure chamber Metering pin Thrust piston Thrust column Housing Orifice Booster Adaptation of a proven concept used for automotive safety tests (HyGe  sled)

Fp7 - LEADER Slide 15 ALFRED C&S rods mechanical design C&S_Rods_ ppt P1 P2 By playing with inner diameter and pressures, a wide range of performance can be attained. D d P1P2 The shape of the metering pin determine the acceleration profile. burst ramplong ramp Booster

Fp7 - LEADER Slide 16 ALFRED C&S rods mechanical design C&S_Rods_ ppt P1P2 B C D A Active mode: Solenoid "A", valves "A" and "B" (both normally open) are electrically actuated. De-energizing any (or all) of them will cause depressurization (i.e. "shot" initiation) Passive mode: Loss of electrical supply  see above Low pressure line break  see above High pressure line break causes the mechanical actuation of the Valve "C" low chamber depressurization is the basic event (but not the only one) which can trigger the device The system does not relay on the efficiency of the gas reservoirs or of the feeding lines. due to the small diameter of the high pressure line, in case of rupture, a significant depressurization of the high pressure chamber occurs after a very long time, therefore enough boosting force is available for scram (caused by automatic actuation of valve "C") Low pressure line High pressure line Booster

Fp7 - LEADER Slide 17 ALFRED C&S rods mechanical design C&S_Rods_ ppt Booster

Fp7 - LEADER Slide 18 ALFRED C&S rods mechanical design C&S_Rods_ ppt Status C/R mechanical design reports (some amendments needed) S/R concept Unification of F/A, C/R and S/R interfaces C/R drawings S/R mechanical design & drawings done to do 1 month completion time