清华阳光 TSINGHUA SOLAR JB Series Solar Water Heater Assembly Manual Tsinghua Solar Ltd. Yangfang County, Changping District, Beijing, 102205, China Tele:+86-10-69762582.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Exterior Window and Door Frames
Cabinet and Countertop Installation
1 Introduction to Engineering Lab 2 – 1 Assembling the Conveyor/Sorter Agenda Goal of todays lab. Storing your teams conveyor/sorter. Tool kits. Safety.
Step-by-step assembly instructions
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Lesson Working with Copper Tubing. Interest Approach n Why is copper tubing only used for water and fuel lines?
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Step-by-step assembly instructions
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Signature Trampoline Instructions.
Expanda Stand Carousel Display System India Distributor: Les Expressions Corporate Services Pvt. Ltd. Flat No.4, 2 ND Floor, Sapathagiri Apatments, 83,
Instructions  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Chapter 7 Metals.
Installation. Indoor Unit Installation Typical Installation.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Installation. Indoor Unit Installation Typical Installation.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
清华阳光 TSINGHUA SOLAR PRODUCTS INTRODUCTIONS Presented by jiaojiwen International Trade Dept. Aug. 31 , 2005.
1. b. Rip Saw 2. d. Used for cutting with the grain.
Robotics – 8. Plates (2-sizes) Plate with holes on 0.500" increments and 1/8" diamonds in between. Can be cut on 0.500" increments. Available in two sizes.
Peregrine the Martian Lander Assembly Instructions Mission to Mars 2008.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Remove the seats from the car, there is no easy way to do this. Flip it up side down so it looks like [1] Both sides are done exactly the same, so.
C1 inspection results T. Meighan. C1 Lead Block Area Upper chill plates bowed upwards from side pressure (?) Top fingers pulled away from winding pack.
Instructions 1.  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
Engineer Training XL1500 Mechanics. Engineer Training XL1500 Mechanics Confidential 2 The XL1500 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
Build A Motor You must follow the directions step-by-step!
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
VIEW SERIES with Sliding Door
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Installation Walkthrough Image Guide
Easycliner (Motorized Version) Assembly Instruction
Step-by-step assembly instructions
Design of Distribution Feedbox at LHC P7
Module 6 Antenna Assembly and Look up Angles
2.2 Gallon TourTank Installation
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Step-by-step assembly instructions
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
Step-by-step assembly instructions
Step-by-step assembly instructions
Clamping and Boring Tools
Step 1:Disassemble battery case
Step-by-step assembly instructions
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Presentation transcript:

清华阳光 TSINGHUA SOLAR JB Series Solar Water Heater Assembly Manual Tsinghua Solar Ltd. Yangfang County, Changping District, Beijing, , China Tele: Fax: Website:

Congratulations on the purchase of your JB series solar water heater. Properly assembled and cared for it will perform well for many years. Please take time to read this manual and familiarize yourself with the assembly before unpacking. Unpacking Your solar water heater is packed in two cartons. The storage tank, frame, reflector and the fastenings box are contained in the larger carton. Unpack this carton and lay out the items, open the fastening box and place the aluminum profiled bars on the floor in order of size. Use Fig.1 on the right to help identify each item needed during the assembly. Frame Assembly Next untie the frame bars bond and identify each bar with the help of Fig. 2. Fig. 1 清华阳光 TSINGHUA SOLAR Assembly Manual

清华阳光 TSINGHUA SOLAR Assembly Manual Cross connect the RS with bolts in the way of Fig. 3 shows. Next connect the bolted sideling bars with rear bars as Fig. 4 shows. Fig. 2 Fig. 3 Fig. 4

Assembly Manual Fig. 5Fig. 6 Connect the stainless steel tank brackets with the rear bars, note that the triangular joint of the brackets should be connected with the reflector, details shows in Fig. 6. Fig. 7 Fig. 8 清华阳光 TSINGHUA SOLAR Reflector Assembly Place the module-type reflectors in parallel. Connect the holes in the tube carriage (the larger holes facing outside) with the slots in the triangular joint of reflector bar, and bolt them, as shown in Fig.7. Connect the holes in the transverse braces (the shorter side facing outside) with the slots and bolts them, as shown in Fig. 8. (screw only four slots of the six)

Assembly Manual 清华阳光 TSINGHUA SOLAR Unite the Frame and the Reflector Insert the triangular joint of the tank brackets between the transverse brace and the reflector bar, and then attach the braces, brackets and the reflector bars with bolts, as shown in Fig. 9. Connect the sideling bars and nether bars. ( tilt angle of 45°), as shown in Fig. 10. Connect the upward, middle sideling bars and nether bars (tilt angle of 30°). Fix the four foot cushion, as shown in Fig. 11. Fig. 9 Fig. 10 Fig. 11

Assembly Manual 清华阳光 TSINGHUA SOLAR Assembly the storage tank Insert the bolts from the cylinder into the slots of the tank brackets, and then fit the nut fingers, as shown in Fig. 12. Screw the air vent on the top of the storage tank. Note: The assembly of the system has not been finished yet, the connection bolts should not be screw down until the tubes are installed. Assembly the evacuated tube Fig. 12 Carefully unpack the tubes box, and avoid solar radiance before the assembly. Check the silicon seals inside the tube locating holes on the inner cylinder to ensure the seal clean and well positioned. Put the black rubber wind-blocking seals into a water basin to make the insert easier.

Apply water to the open end of the tube before inserting to make it easier to insert the tubes. Fit the wet wind- blocking seal to the tube from the open end with the rounded side facing down. Slide it 10 cm down the tube, as shown in Fig. 13. Insert the tube into the locating hole with a gentle pressure and twisting motion. Insert the tubes end into the end protector, and then fix the protector into the shorter holes in the tube carriage, as well as the left/right flexible fasteners into the longer holes, as shown in Fig. 14. Insert the tubes 1 cm deeper than the silicon seal rings, and then slide the black rubber wind- blocking seals up the tube until its outside edge fits well with the cylinder. Insert one tube on each side of the tank to achieve alignment of the tank and the frame before proceeding with others. Fig. 13 Assembly Manual 清华阳光 TSINGHUA SOLAR Fig. 14

清华阳光 TSINGHUA SOLAR Assembly Manual Then fix all the nuts tight after all the tubes are assembled, as shown in Fig. 15. Now a solar water heater has been assembled successfully, the next step is to install on your roof and plumbing. JB series solar water heater can be applied in large-scale solar water system, as shown in Fig. 16. Fig. 16 Fig. 15 Thank you for choosing TH Solar product. TH Solar--- Let us share.