P.R.P.F Pimp Russ’ Portable Foundry Project Advisor: Russ Rosmait Chase Butcher Cody Haddock Mike Verren 5/27/07.

Slides:



Advertisements
Similar presentations
The Basics Equipment Maintenance and Safety
Advertisements

Steering Systems Chapter 44.
Forcible Entry By Randy Hart.
Breakdowns and Trail Repairs A guide for preparedness.
Service Technician Training
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Rebuilding process for the Box Type Induction Furnace.
STATESMAN Campers, Raising the standards. STATESMAN XP- 3.
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 >>
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
Marine Auxiliary Machinery Chapter 8 Lesson 3 Actuator Main Parts.
MODULE V CDL Pre-route Victoria Creech Training Representative.
4-1 Chapter 4 Overview b The DCM is very complex Mechanical, electrical, hydraulic and safety systems all work together Mechanical, electrical, hydraulic.
DAILY PRE-TRIP.
Unit 5 Bench Testing, Maintenance, and Troubleshooting.
FF-650 Repair Procedure—CMP 30 Frame Reason for Repair—CMP 30 models with Serial Numbers in the range of 2453 through 3354 in Lot 9587, 0008 through 0120.
Forging new generations of engineers. Fluid Power.
1B-1 Fire Engine Maintenance Unit 1B – Pump Inspections and Maintenance.
Bench Testing, Maintenance, and Troubleshooting.  Identify three primary steps in bench testing a helitorch.  Identify six considerations in maintaining.
Automatic Commode Seat Closing System Patent No.: 5,369,814 Date: December 6, 1994 The apparatus uses a water pressure sensor to sense a drop in line pressure.
STATESMAN Campers, Raising the standards. STATESMAN XP- 1.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
STATESMAN Campers, Raising the standards. STATESMAN XP- 2.
1A-1 Fire Engine Maintenance Unit 1A Vehicle Inspections.
Group 10 Anthony Muller Gerald Tyberghein Joshua Wood 1.
The 30M2 Continuous Miner. Customer Name 30M2 Overview %Heavy duty high power miner for mid-height seams %High productivity from efficient cutting and.
REASSEMBLY and INSTALLATION u Chapter 12 u Classroom Manual u Page 325 CBCAUTOMOTIVERKCBCAUTOMOTIVERK.
Senior Design: Validation of Design December 15, 2008.
Aerial Apparatus Operator Types and Construction of Aerial Apparatus.
Hydraulic Log Splitter ET 493- Senior Design One Jordan Millet Ridge Bourgeois Marcus Millet Advisor: Dr. Junkun Ma Teacher: Dr. Cris Koutsourgeras.
Local Motion Marco Maffeo-Robinson Sean Horning Justin White Ross Ziskind Tom Kidd Advisor: Professor Coleman Company Contact: Brian Costello.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
 Hydraulic Log Splitter ET 493- Senior Design One Jordan Millet Ridge Bourgeois Marcus Millet Advisor: Dr. Junkun Ma Teacher: Dr. Cris Koutsourgeras.
Parts & Accessories. Lights Please visit the following link to view a chart that specifies the required color, position and types of lamps and reflectors.
Commercial Drivers License. A Any combination of vehicles with a Gross Combination Weight Rating (GCWR) of 26,001 or more pounds provided the Gross Vehicle.
Engine Installation, Break-In, and In-Chassis Repairs
POE FINAL EXAM REVIEW Spool-White Fall 2013.
ME 4182 Mid Term Presentation Team Moondogs October 2, 2006 From left: Rahul Kirtikar, Chris Sampson, Chris Culver, Mike Widerquist, Elias Krauklis
COMPRES 2007 Annual Meeting COMPRES Gas Loading System at APS Progress Report June 2007 Mark Rivers.
Underhood and Body Inspection
Vacuum system.
Engineer Training Pneumatic System Overview. Engineer Training Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:  Y Pistons.
HETS 5-1 M1000 SEMITRAILER CAPABILITIES
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
THS Automotive Technology Safety Lesson 3: Raising and Supporting Vehicles Safely Raising and Supporting Vehicles Safely.
Copyright by Team 5- Group Document contains personal property from a team effort and Patent Protection will be supported, this is a message of intent.
© Goodheart-Willcox Co., Inc.. Power Tools and Equipment  Power tools  tools driven by compressed air, electricity, or pressurized liquid  Shop equipment.
ME 4182 Final Presentation Manual Trash Compactor December 06, 2006 Team Moondogs From Left Elias Krauklis, Mike Widerquist, Chris Culver, Chris Sampson,
Presented By: Aaron Goodwin Mike Pyrkosz April 15, 2004 Aquarium Wave Generator Project # A Design Review.
NASA Great Moonbuggy Race 2012 SpacePokes Design Lesley Young Leader Davis FayRecorder Alisa FrohbieterProject Engineer Ryan WilliamsProject Engineer.
The Cooling System (Reasons for)
6/9/2016 Quick Reference Parts Guide Introduction This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts. It.
Engineer Training XL1500 Mechanics. Engineer Training XL1500 Mechanics Confidential 2 The XL1500 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Piazza's Custom Trailers specializes in helping customers with specific needs or special requests find the trailer that is right for them. Piazza's Custom.
7/7/2016 This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts. It does not include items such as wire or.
Wright Import Service Center LLC. About Wright Import Service Center LLC  Why Choose Us? Experience and Knowledge - We employ ASE certified technicians.
REPAIR MAIN HAVE BEEN WELDED RELEASE ELECTRONICADDITIONAL PERIPHERAL
Suspension Systems - 1 Topics covered in this presentation:
Overview of Vehicle.
An OVERVIEW ON AUTOMOBILE ENGINEERING
Steering Systems Topics covered in this presentation:
Landing gear systems.
Quick Reference Parts Guide Introduction
Parts & Accessories.
Quick Reference Parts Guide Introduction
6. Disassembly & Reassembly
Parts & Accessories.
FINAL PRESENTATION Kennesaw State University
F 350 Ford Inspection Peaslee Tech Vehicle.
Presentation transcript:

P.R.P.F Pimp Russ’ Portable Foundry Project Advisor: Russ Rosmait Chase Butcher Cody Haddock Mike Verren 5/27/07

Reason for Build Increase awareness Education Portability Sure beats building a moonbuggy

Design Concepts

Old Concept

Furnace Lifting Arms

Lifting Arms

Lifting arms (cont.)

Lifting Arm Analysis

Design Concept (lifting arms)

Jack Levelers CB

Storage Box Assembly 2 boxes-72” X 13” X 15” 3-13” X 20” doors Commercial Welded Hinges Welded construction Sealed joints (rain, snow… etc.) Total volume of each Box 16,200in^3

Assembly

Testing Hydraulic System –Hydraulic Cylinder –Pump (110vac) Calculations-Statics, Fluids CB

Testing Muller –Mounting, Run Test CB

Testing Propane/Furnace –Fuel requirement for two melts –Safety CB

Fuel Consumption 18 lb bottle 20 lbs of propane 2 lbs for every 15 minutes Can run furnace for 2.5 hours There will be a back-up bottle

Process Plan Clean up workspace –Organize garage Axle/ Fenders –Disassemble fenders and axle from frame –Torch fenders –Unbolt axle assembly –Block up frame Framework –Add support where needed

Process Plan Deck –Cut out correct dimension using water jet –Bolt to frame Boxes –Cut out correct dimension using water jet –Weld and assemble –Seal

Process Plan Hydraulics –mount –plumbing –position and install Furnace arms assembly –Cut out correct dimension using water jet –Machine shaft –Assemble and install Muller rebuild –Refurbish inner and outer plows –Purchase and install pressure spring for wheels

Process Plan Furnace rebuild –Purchase a new fire eye Paint –Paint and detail works Lighting/Electrical(110 vac) –Run wire and tail lights –Power switches for devices

QC issues Furnace arm mechanism Load distributions Overall functionability

Trailer Weight Calculations Trailer frame460lbs Furnace500lbs Muller175lbs Propane Fuel38lbs Hydraulics120lbs Fire Extinguisher30lbs Green Sand100lbs Water42lbs Dry Sand50lbs Aluminum pigs50lbs Safety equipment & tools100lbs

Trailer Weight Calculations Aluminum Decking/Boxes 4 sides 72" * 15" * 0.188"80lbs 2 ends 13" * 15" * 0.188"7lbs 1 top 72" * 13" * 0.188"17lbs 2 tops 36" * 13" * 0.188"18lbs 1 bottom 72" * 57" * 0.188"76lbs 1 cover 36" * 31" * 0.188"21lbs Total weight1884lbs

Budget DescriptionQuantityQuoted price (per unit)Actual cost Hydraulic System 36” Ram1$104.99$ 6” Ram2$76.99$ Pump and reservoir1$499.99$ Hydraulic lines6$20.00$ Hydraulic Valve1$99.99$ Electrical System Generator Head1$435.00$ Trailer light kit1$29.99$ Trailer wiring harness 1$5.99$ 5 strand trailer wire1$6.99$

Budget DescriptionQuantityQuoted price (per unit)Actual cost Jacks Tongue Jack1$30.00$ Stabilizer jacks4$85.00$ Fuel System 20 lb Propane tank2$150.00$ Fuel line1$41.94 Fuel fittings1$1.44 Running gear Tires 2$125.00$ Wheels2$125.00$ Axle kit (includes)↓$ Leaf springs↓$ Axle↓$ Hubs↓$ Bearings (inner & outer) ↓$ Spring hangers↓$ Spring shackles1$240.00$

Budget DescriptionQuantityQuoted price (per unit)Actual cost Sand reclamation System Vacuum motor1$$ Hose1$$ New muller lid1$$ Screen / filter1$$ Material C Channel12 ft$$ Bar Stock8 ft$$ Mounting bracket material 6 ft$$ Boltsx Hingesx Pinsx$$ Safety Fire extinguisher1$20.00$ Safety Stickersxx$39.99$ Total$2,138.30

The Build

Axle Installation/Framework

Framework

Jack Stabilizers

Deck

Deck (cont)

Boxes

Box Doors

Hydraulics

Hydraulics (cont)

Furnace Lifting Mechanism

Furnace Lifting Arm Video

Muller/Vac System

Muller Vac System (cont)

Vac System

Lighting

Electrical

Electrical (cont)

Safety Issues Furnace Molten metal Sand in the eye

Actual Budget DescriptionQuantityQuoted price (per unit)Actual cost Hydraulic System 18” Ram1$164.99$ $ Pump and reservoir1$429.99$ Hydraulic lines6$20.00$ Hydraulic Valve1$69.99$ Electrical System $ Trailer light kit1$24.99$ Trailer wiring harness 1$5.99$ 5 strand trailer wire1$6.99$

Actual Budget DescriptionQuantityQuoted price (per unit)Actual cost Jacks Tongue Jack1$52.00$ Stabilizer jacks4$85.00$ Fuel System 20 lb Propane tank2$150.00$ Fuel line1$41.94 Fuel fittings1$1.44 Running gear Tires $ $ Axle kit (includes)↓$ Leaf springs↓$ Axle↓$ Hubs↓$ Bearings (inner & outer) ↓$ Spring hangers↓$ Spring shackles1$150.00$

Actual Budget DescriptionQuantityQuoted price (per unit)Actual cost Sand reclamation System Vacuum motor1$$ Hose1$$ 1$$ Screen / filter1$$ Material Locks5$18.15$ electricalx131.87$ Welding Machining $ miscx57.80 Hinges $ Safety Fire extinguisher1$14.99$ Total$

Funding Russ’s checkbook $ PSU$100 Student Contribution $300 Donations Total$

Week 1Week 2Week 3Week 4 Tasks October Muller test Furnace test / Melt test Hydraulics review November Pricing Design review December Order materialsBreak

Week 1Week 2Week 3Week 4 Tasks January Install axle Install base plate Break Start of Build Build Storage Boxes February Furnace lifting arms Hydraulic system Shakeout grating March Start Trial Testing Trial testing April May

Build Time Jan. 20 th - April 25 th –Customer Requirements CB