Introduction to Ecotrim and DEMETRA+ 14/04/2011 Lunch time presentation 14 th of April 2011 Dario BUONO and Enrico INFANTE Unit B2 Methodology and Research.

Slides:



Advertisements
Similar presentations
Temporal Disaggregation Using Multivariate STSM by Gian Luigi Mazzi & Giovanni Savio Eurostat - Unit C6 Economic Indicators for the Euro Zone.
Advertisements

ECOTRIM A program for temporal disaggregation of time series
United Nations Statistics Division/DESA
Using EU-fin Interactive user manual for coordinators (Using EU-fin to the fullest)
Exercise 7.5 (p. 343) Consider the hotel occupancy data in Table 6.4 of Chapter 6 (p. 297)
Seasonal Adjustment of National Index Data at International Level
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE TurkStat NATIONAL ACCOUNTS IN TURKEY 1 TurkStat.
United Nations Statistics Division Scope and Role of Quarterly National Accounts Training Workshop on the Compilation of Quarterly National Accounts for.
Internal documentation and user documentation
LSP 120: Quantitative Reasoning and Technological Literacy Section 118 Özlem Elgün.
United Nations Statistics Division
Unido.org/statistics Analysis of Divergence of quarterly and Annual Index of Industrial Production Shyam Upadhyaya, Shohreh Mirzaei Yeganeh United Nations.
OECD Short-Term Economic Statistics Working PartyJune Analysis of revisions for short-term economic statistics Richard McKenzie OECD OECD Short.
Seasonal Adjustment Methods and Country Practices Based on the: Hungarian Central Statistical Office: Seasonal Adjustment Methods and Practices; UNECE.
Business Forecasting Chapter 5 Forecasting with Smoothing Techniques.
XP New Perspectives on Microsoft Access 2002 Tutorial 71 Microsoft Access 2002 Tutorial 7 – Integrating Access With the Web and With Other Programs.
United Nations Statistics Division/DESA International Recommendations for the Index of Industrial Production (IIP)
International Workshop on Industrial Statistics Dalian, China June 2010 Shyam Upadhyaya UNIDO Benchmarking of monthly/quarterly.
CHAPTER 5 – Session 11 United Nations Statistics Division/DESA Revision of the Index of Industrial Production (IIP) publication by the UNSD.
Demetra+ Quick Tour Versatile software. Choose the right tool Demetra+ main feature: multi-processing Demetra+ in production. Understanding.
13-Jul-07 European Statistical System guidelines on seasonal adjustment: a major step towards PEEIs harmonisation C. Calizzani – G.L. Mazzi – R. Ruggeri.
8-11-Jul-07 How to increase quality of Principal European Economic Indicators? Roberto Barcellan, Brian Newson, Klaus Wurm Eurostat.
1 Chapter 15 Methodology Conceptual Databases Design Transparencies Last Updated: April 2011 By M. Arief
1 Quality Center 10.0 NOTE: Uninstall the current version of QC before downloading QC All QC 10.0 documents can be located on the BI Shared Services.
United Nations Economic Commission for Europe Statistical Division Seasonal Adjustment Process with Demetra+ Anu Peltola Economic Statistics Section, UNECE.
Short-term Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive Trade Statistics.
9 th Euroindicators Working Group Luxembourg, 4 th & 5 th December 2006 Eurostat - Unit D1 Key Indicators for European Policies.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
StatisticsCanadaStatistiqueCanada Presentation of seasonally adjusted series STESEG Task Force on Data Presentation and Seasonal Adjustment Bernard Lefrançois.
1 DATA PRESENTATION AND SEASONAL ADJUSTMENT - DATA AND METADATA PRESENTATION TERMINOLOGY - DATA PRESENTATION AND SEASONAL ADJUSTMENT - DATA AND METADATA.
9 th Euroindicators Working Group Luxembourg, 4 th & 5 th December 2006 Eurostat - Unit D1 Key Indicators for European Policies.
Eurostat – Unit D5 Key indicators for European policies Third International Seminar on Early Warning and Business Cycle Indicators Annotated outline of.
April 2011 Testing Seasonal Adjustment with Demetra+ Ariunbold Shagdar National Statistical Office, Mongolia.
Revision of the ESS Guidelines on seasonal adjustment By Gian Luigi Mazzi and Rosa Ruggeri Cannata Seasonal Adjustment User Group 16 th October 2012.
Round Table Round Table Current State of Seasonal Adjustment in Countries/ UNECE Workshop on Short-Term Statistics (STS) and Seasonal Adjustment 14 – 17.
IMF Statistics Department The views expressed herein are those of the author and should not necessarily be attributed to the IMF, its Executive Board,
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
22/06/2011 Using DEMETRA+ Enrico INFANTE - ESTAT Unit B2 – Methodology and Research Task Force: SA tools User testing group 22/06/2011 Paris - INSEE.
14-Sept-11 The EGR version 2: an improved way of sharing information on multinational enterprise groups.
Research Methodology Lecture No :32 (Revision Chapters 8,9,10,11,SPSS)
Simon Compton Methodology Directorate Office for National Statistics
United Nations Statistics Division Overview of handbook on cyclical composite indicators Expert Group Meeting on Short-Term Economic Statistics in Western.
Alternative two-steps reconciliation practices Enrico Infante Eurostat, Unit C.2: National Accounts Production Università degli Studi di Napoli Federico.
JDemetra+ as an innovative tool for seasonal adjustment
Performance Review Tool Updates College of Engineering
Herman Smith United Nations Statistics Division
Benchmarking for short-term economic statistics
Carsten Boldsen Hansen Economic Statistics Section, UNECE
Shohreh Mirzaei Yeganeh United Nations Industrial Development
ESS guidelines on temporal disaggregation: Benchmarking and reconciliation From Annual to Quarterly to Monthly data.
Quarterly National Accounts
Methods and estimation techniques of euro area GDP flash at T+30 days: preliminary reflections Filippo Moauro ISTAT - Direzione centrale di Contabilità.
TF meeting 7 October '15 Luxembourg
A SUMMARY NOTE ON REVISED GDP ESTIMATES
Hungarian practice on chain-linking and its implication for SA
ESS guidelines on temporal disaggregation by Dario Buono dario
SAEG 15th March 2018 Item 2.1 Use of By Dario Buono.
STATISTICAL AGENCY UNDER PRESIDENT OF THE REPUBLIC OF TAJIKISTAN
ESS guidelines on temporal disaggregation by Dario Buono dario
United Nations Statistics Division
ESS guidelines on temporal disaggregation by Dario Buono dario
Quarterly National Accounts
Item 3.2 ESS guidelines on temporal disaggregation by Dario Buono (Eurostat) WG Methodology 5 April 2017.
LAMAS Working Group June 2018
SBA Lender Portal Overview
Task Force on Seasonal Adjustment of Quarterly National Accounts Second meeting Item 7 Calendar adjustment: Issues note Martin Eiglsperger Frankfurt,
Model Selection, Seasonal Adjustment, Analyzing Results
Quarterly National Accounts
Quarterly National Accounts
Using JDemetra+ at STATEC
Presentation transcript:

Introduction to Ecotrim and DEMETRA+ 14/04/2011 Lunch time presentation 14 th of April 2011 Dario BUONO and Enrico INFANTE Unit B2 Methodology and Research

Objectives Inform the production units about the Eurostat IT tools available for Temporal Disaggregation and Seasonal Adjustment Identify audience for a possible internal courses (including demo session) at ESTAT on the subject No methodological issues will be addressed No software demo, only screenshots 14/04/2011Introduction

Contents Summary information on ECOTRIM (30 mins) Summary information on DEMETRA+ with briefing on the ESS guidelines on Seasonal Adjustment (30 mins) User support provided by Unit B2 Methodology and Research (10 mins) Q & A (20 mins) 14/04/2011Introduction

Why Ecotrim and DEMETRA+ together? Target users are the same

14/04/2011 ECOTRIM TOOL FOR TEMPORAL DISAGGREGATION OF TIME SERIES Dario BUONO

Topics Ecotrim in the framework of data production Techniques available in Ecotrim 14/04/2011ECOTRIM

Forewords Ecotrim is a program written for Windows and has been developed by Eurostat There is a project within Eurostat (UNIT C2) for the development/maintenance of the program The main aim of this presentation is to demonstrate the potential of the application User manual is available in EN and FR 14/04/2011ECOTRIM

Why Eurostat developed Ecotrim? ESA 95 paragraph “ The statistical methods used for compiling quarterly accounts ……..can be classified in two major categories: direct procedure and indirect procedure ”... indirect procedures are based on Temporal Disaggregation of the annual accounts data in accordance with mathematical and statistical methods using reference indicators that permit the extrapolation for the current year 14/04/2011ECOTRIM

Definitions Temporal Disaggregation –Process of deriving high frequency data from low frequency data and, if available, related high frequency information ECOTRIM –Supplies a set of mathematical and statistical techniques to carry out Temporal Disaggregation 14/04/2011ECOTRIM

Temporal Disaggregation techniques are useful in compiling short-term statistics:  Quarterly National Accounts (QNA) Give a quarterly breakdown of the figures in the annual accounts  Flash estimates Use the available information in the best possible way including, in the framework of a statistical model, the short-term available information and the low frequency data in a coherent way  Monthly indicators of GDP The monthly estimates are derived from the available information respecting the coherence with quarterly data 14/04/2011ECOTRIM

Other short-term statistics Short-term industrial statistics Employment Money and banking statistics 14/04/2011ECOTRIM

Techniques available in Ecotrim 14/04/2011ECOTRIM

Basic principles Distribution –When annual data are either sums or averages of quarterly data (e.g., GDP, consumption, indexes and in general all flow variables and all average stock variables) Interpolation –When annual value equals by definition that of the fourth (or first) quarter (e.g., population at the end of the year, money stock, and all stock variables) Extrapolation –When estimates of quarterly data are made when the relevant annual data are not yet available 14/04/2011ECOTRIM

Techniques available in Ecotrim Temporal Disaggregation of univariate time series by using or not related series and fulfilling temporal aggregation constraints –Mathematical approach and the optimal, in the least squares sense, approach Temporal Disaggregation of multivariate time series with respect of both temporal and contemporaneous aggregation constraints Flash estimates of current year observations by using or not available information on related series 14/04/2011ECOTRIM

Temporal and Accounting constraint Statistical offices are often faced with the estimation of a set of quarterly series linked by some accounting relationship Temporal Disaggregation methods can also be used in such cases, to give a solution consistent with both temporal and accounting aggregation constraints 14/04/2011ECOTRIM

Estimates have to be consistent and coherent Temporal consistency –Quarterly values have to match annual values (for example the sum of quarterly values of the GDP must be equal to the annual value) Accounting coherence –Quarterly components of an account should respect the accounting constraints (for example, the sum of quarterly values of the GDP expenditure side components should be equal to the corresponding quarterly value of GDP) 14/04/2011ECOTRIM

Temporal Disaggregation methods Univariate Approach –Smoothing methods –Two steps adjustment methods –Time series methods –Regression based methods Static models Dynamic models Multivariate Approach –Two steps adjustment methods –Regression based methods 14/04/2011ECOTRIM

The classical univariate Temporal Disaggregation Given the annual observations for an account aggregate and the quarterly values for a related series, the unknown quarterly/monthly values of the aggregate are estimated Chow and Lin (1971) worked out a least-squares optimal solution on the basis that a linear regression model involving the quarterly aggregate series and the related quarterly series will hold 14/04/2011ECOTRIM

Statistics Rhô R-squared ( next to 1) Durbin-Watson ( about 2 ) Probability of F T-stat Reliability indicators (lower value for the range between Min and Max) 14/04/2011ECOTRIM

Reminders It must be reminded that the statistics obtained within Ecotrim outputs are based on the annual data It is advisable to use a unique model all along the series Structural breaks must be taken in consideration It is advisable to have observations covering at least 20 years when disaggregating annual data It is advisable to have observations covering at least 15 years when disaggregating quarterly data 14/04/2011ECOTRIM

ECOTRIM ECOTRIM is a program that supplies a set of mathematical and statistical techniques to carry out Temporal Disaggregation Structured for Windows 95/98 and Windows NT Visual Basic and C++ User friendly It can be used according to two different modes: Interactive mode Batch mode 14/04/2011ECOTRIM

Interactive mode Input session Univariate methods Boot, Feibes and Lismann Denton AR(1) Fernàndez Litterman Multivariate methods White noise Random walk Rossi Denton Output session Graphs and display 14/04/2011ECOTRIM

Batch mode ECOTRIM performs Temporal Disaggregation of several jobs starting from a batch command file Batch mode is very useful when handling many series Batch command file Batch session univariate multivariate Output 14/04/2011ECOTRIM

Work with ECOTRIM Input Data Aggregated Series Choose the Aggregation Order

14/04/2011ECOTRIM Once you have imported the Aggregated Series, you will able to import the Related Series Work with ECOTRIM Use the STATUS bar to check the currently loaded files

14/04/2011ECOTRIM Work with ECOTRIM Univariate Methods Left click on the series Choose the Type of Aggregation

14/04/2011ECOTRIM Work with ECOTRIM Choose the Method… …and the Related Series

14/04/2011ECOTRIM Work with ECOTRIM Compute!!! …and getting results

14/04/2011ECOTRIM Work with ECOTRIM Display the data

Future of Ecotrim Updating the Visual Basic/C++ version and refurbish the interface of ECOTRIM with the purpose to match production and users’ requirements Design of the application as a Building Block, CVD compliant Make system Windows 7 compatible, compilation as a 64-bit application (former was 16-bit) Inclusion of more recent methods like: –Univariate Regression based Temporal Disaggregation –Reconciliation by Two-Step procedures (Quenneville & Rancourt 2005 – Di Fonzo & Marini 2009) 14/04/2011ECOTRIM

DEMETRA+ 14/04/2011 TOOL FOR SEASONAL ADJUSTMENT Enrico INFANTE

What is DEMETRA+? 14/04/2011DEMETRA+ DEMETRA+ is a tool for Seasonal and Calendar Adjustment developed by National Bank of Belgium for EUROSTAT Identify more components Trend-Cycle Component Outliers Irregular Component

What are S easonal and C alendar A djustment ? SEASONAL ADJUSTMENT Fluctuations observed during the year (each month, each quarter) and which appear to repeat themselves on a more or less regular basis from one year to the other Remove Seasonality Seasonality: CALENDAR ADJUSTMENT Remove Calendar Effects Any economic effect which appears to be related to the calendar (one more Sunday in the month can affect production) Calendar Effects: 14/04/2011DEMETRA+

Why DEMETRA+?  User friendly!!! 14/04/2011DEMETRA+  ESS Guidelines  It will be Open-Source (java)  Based on X12 ARIMA / Tramo-Seats

Documents about DEMETRA+ 14/04/2011DEMETRA+ You can download the latest version of DEMETRA+ at the following link: At the same link you can find:  ESS guidelines on Seasonal Adjustment  DEMETRA+ User Manual and other documents  Help-Desk  Information about the next ESTP course (at EUROSTAT, 3-5 May 2011) and the EUROSTAT Training Course

How to work with DEMETRA+ presents the available time series  Browser panel 14/04/2011DEMETRA+ First overview

How to work with DEMETRA+ First overview 14/04/2011DEMETRA+  Workspace panel shows information used or generated by the software

How to work with DEMETRA+ First overview 14/04/2011DEMETRA+  Central empty zone will contain the actual analysis

How to work with DEMETRA+ First overview 14/04/2011DEMETRA+  TSProperties panel contains the current time series

How to work with DEMETRA+ First overview 14/04/2011DEMETRA+  Logs panel contains logging information

14/04/2011DEMETRA+ Empty top-left cell True dates in the first column Title of the series in the first row Empty cells for missing values Browser panel Excel tab Add command Open the excel workbook How to work with DEMETRA+ Importing data from Excel

Displaying the data 14/04/2011DEMETRA+ Open one of the containers DRAG & DROP How to work with DEMETRA+

14/04/2011DEMETRA+ Choose and activate a specification Getting results Seasonality tests How to work with DEMETRA+ Single Seasonal Adjustment

14/04/2011DEMETRA+ What happens after SA? Original, Calendar Adjusted and Seasonally Adjusted series Original Series

14/04/2011DEMETRA+ What happens after SA? Original, Calendar Adjusted and Seasonally Adjusted series Calendar Adjusted Series

14/04/2011DEMETRA+ What happens after SA? Original, Calendar Adjusted and Seasonally Adjusted series The series has been cleaned!! Seasonally Adjusted series

14/04/2011DEMETRA+ What happens after SA? Growth Rates Original Series

What happens after SA? Growth Rates 14/04/2011DEMETRA+ Calendar Adjusted Series

What happens after SA? Growth Rates 14/04/2011DEMETRA+ Seasonally Adjusted series

ESS Guidelines on SA 14/04/2011DEMETRA+  Introduced in 2009  Chapters subdivided into specific items describing different steps of the SA process  Items presented in a standard structure providing: 1.Description of the issue 2.List of options which could be followed to perform the step 3.Prioritized list of three alternatives from most recommended one to the one to avoid (A, B and C) 4.Concise list of main references  Added value: 1.Conceptual framework and practical implementation steps 2.Both for experienced users and beginners PUB/KS-RA /EN/KS-RA EN.PDF

14/04/2011DEMETRA+ ESS Guidelines on SA (example 1) Calendar Adjustment Calendar Effects typically include:  Different number of working days in a specific period  Composition of working days  Leap year effect  Moving holidays (Easter, Ramadan, etc.) A) Best alternative B) Acceptable C) To be avoided A)RegARIMA approach, fully checks the significance and plausibility of the effects B)Regression approach based on the irregular component C)Proportional Adjustment; other adjustments; no adjustment

14/04/2011DEMETRA+ ESS Guidelines on SA (example 2) Validation of Seasonal Adjustment A) Best alternative B) Acceptable C) To be avoided A)Use a detailed set of criteria B)Use only default criteria already defined within the different tools C)Use only the basic set of criteria or do not validate SA is a complex data treatment which needs accurate monitoring before the results are acceptable GraphicalDescriptiveParametric and non- parametric tests

USER SUPPORT PROVIDED BY UNIT B2 Dario BUONO 14/04/2011

EUROSTAT UNIT B2 14/04/2011 Methodology and Research Provide the EU with a service on the statistical methodologies in order to improve the data quality and reliability for the use of the EU policies Define, position and co-ordinate all statistical actions in the field of research Achieve a higher degree of harmonization of the EUROSTAT and ESS practices on SA:  Definition of detailed guidelines on SA  Maintenance and development of reliable tools for SA at ESS level (DEMETRA+)  Fostering the exchange of practices among NSIs  Organisation of training on SA

EUROSTAT UNIT B2 14/04/2011 Methodology and Research Provide the EU with a service on the statistical methodologies in order to improve the data quality and reliability for the use of the EU policies Define, position and co-ordinate all statistical actions in the field of research  Consultative role in the ECOTRIM project  Partial user support also on methodological aspects by EUROSTAT methodology helpdesk

14/04/2011 Questions?