UK WIR The UK Experience Christopher Royce Anglian Water Services.

Slides:



Advertisements
Similar presentations
Facilities Capital Planning and Management A program management overview prepared for Ferndale School Districts Facilities Planning Committee.
Advertisements

Assessing Capacity Through Sanitary Surveys. SDWA §1420 Capacity Development ~To receive their full Drinking Water State Revolving Fund allotment, States.
Shaping the Future of Water Services Implementing the Vision for Irish Water Dr. John Tierney Managing Director Irish Water.
International workshop to discuss the science of asset management, 9 th December 2011 Long term investment planning Developing practical strategic investment.
Adapting the city. Water Infrastructure & Climate Change Chris Matthews.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
Protecting consumers, promoting value, safeguarding the future1 Media briefing – final determinations 26 November 2009.
Water in the East Midlands Sharon Palmer Regional Environment Planning Manager Environment Agency June 2012.
See the Present… Know the Future…. RECAPP ® Markets Telecom Facilities Municipalities Government Transportation.
1 Water Services Training Group 16 th Annual Conference Water Sector Reform Programme Implementation INEC, Killarney, 8 th November 2012.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
RPI-X: Forecasting costs Regulation and Competition John Cubbin.
National Urban Waste Water Study (Covers catchments with a population equivalent of 2,000 or more outside the Greater Dublin Area) Department of the Environment,
Blue Drop 10yr plan Indaba Auditorium, Rand Water, Rietvlei Kista Naidoo 18 February 2015.
Chapter 1 Infrastructure Management System. Managers and engineers need clear guidelines for life- cycle management of infrastructure systems for water,
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Facilities Management Category Management Plan Synopsis Version 1.1 (March 2015)
Water Services National Training Group 12th Annual Conference 11 th September, 2008.
An Overview of Our Regulatory Proposal
The View from Wall Street: A Capital Markets Perspective Debra G. Coy Svanda & Coy Consulting 2010 Mid-America.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Dutch Enviromental Accounts and policy demands Geert Bruinooge Deputy Director General Statistics Netherlands.
Australian Water Summit Sydney March 2006 Is privatisation of water infrastructure and services the answer? Phillip Mills Director of Water Services, Water.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blue Hotel Sligo, 3 rd. September 2015.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
1 Monitoring and Evaluation System Mr M Thibela by Director: Corporate Planning Department: Water Affairs (DWA) 18 August 2009.
hydroAMP asset management framework
every five years water and sewerage companies submit their investment plans to the industry regulator Ofwat this is known as the ‘Price Review’ the next.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel Sligo, 3 rd. September 2015.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel, Sligo, 3 rd. September 2015.
Green Drop Compliance in Johannesburg Etienne Hugo General Manager: Operations Johannesburg Water (Pty) Ltd.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
Implementing an Adaptive Capital Improvement Program
WATER UK CITY CONFERENCE 21 JANUARY 2004 PHILIP FLETCHER.
Sewer Rate Evaluation Wareham, Massachusetts January 14, 2014 Michael J. Schrader, P.E.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
New Directions in Auditing Construction and Public Works Projects Part 2 Beth Woodward, CGAP, CIA, CCA Senior Management Auditor Audit Services Division,
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
Nick Fish, Commissioner | Michael Stuhr, P.E., Director Portland Water Bureau May 3, 2016 Briefing for the Portland Utility Board Asset Management at the.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Summary and analysis of information disclosed by 29 electricity distributors 12 December 2013.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Road Investment Decision Framework
Catchment Management: Impact of climate change on delivery and investment Innovative responses to Climate Change Luke de Vial Head of Environment and.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
1 © Trinity Horne Limited Analysing pollution and targeting prevention activity in a UK water company Alec Ross Senior Statistician Luke Cooper.
Ofwat – Protecting consumers, promoting value and safeguarding the future Water and Regulation Improving the value from statistics Gordon Allan Engineering.
Asset Degradation Modelling at Townsville Water
Sustainable Water Infrastructure through Innovative Financing
Ensuring Value for Money Asset Management Project at American Samoa Power Authority By William Spitzenberg (ASPA) and Richard Taylor (Thomas Civil.
Prioritising Capital Investment Achieving a Balance
Managing future water resources
City of Vaughan | Corporate Asset Management Strategy
2016 IPWEAvic Public Works Conference
Danube Water Conference, Vienna, May 2017
Meeting Standards and Expectations in the Water Industry
Irish Water’s Revised Business Plan and Capital Outlook
OPG’s Views on Incentive Regulation and the Power Advisory LLC Report
Across the entire value chain
Briefing to the Portfolio Committee on Water and Sanitation on the
WASTEWATER MANAGEMENT 19 September 2018
Managed Content Services
Strategic Business Plan 2019
Operationalization of a Public Works AM Strategy
ECONOMICS IN THE WFD PROCESS
EUnetHTA Assembly May 2018.
Presentation transcript:

UK WIR The UK Experience Christopher Royce Anglian Water Services

UK WIR Agenda UK development UK Regulation Common framework Lessons learned  Data  Performance  Investment  Risk Development areas Concluding remarks

UK WIR Development The move of utilities to a three ball model Owner Asset manager Service provider ●International models ●Best practice from other large asset owners

UK WIR Regulatory process Periodic review every five years Prices for 2005 –10 just completed Cost base submission Draft business plans Final business plans – April 2004 Draft determination – August 2004 Company representations Final determination – December 2004 Effective date – 1 April 2005

UK WIR Regulatory process Requires companies to state: Costs and timescales for new obligations What customers require What service enhancements companies propose Efficiencies Future spend to cater for growth Future spend projections for maintenance Impact on customers bills Asset Management Plan (AMP4)

UK WIR Asset management ● Quality obligations Water Wastewater ● Growth ● Service enhancements ● Maintenance – serviceability to customers Maintenance is the focus of this presentation

UK WIR The UK Regulation model Drinking Water Inspectorate Maintenance of assets Environment Agency Government & other groups Customers NEEDS What do we need to do? How fast do we need to do it? How much should it cost? OFWAT REVIEW (Every five years but 20 year horizon) STRATEGIC BUSINESS PLAN 5 year contract with specific outputs Annual reporting of progress and outputs Health Authorities ECONOMETRIC MODEL

UK WIR Ofwat 4 Stage Approach Maintain serviceability based on current trends & information Is the future period different? Using risk based and other methods to estimate changes in the level of maintenance required for the future Scope for improvements in efficiency - general and company specific Taking account of overlaps between capital maintenance and enhancement programmes Stage A Stage B Stage C Stage D

UK WIR Future spend projections Developed through a common framework

UK WIR Why a common framework MD (Maintaining serviceability to customers) ‘Each company needs to demonstrate how the flow of services to customers can be maintained at least cost terms of both capital and operating expenditure, recognizing the trade off between cost and risk, whilst ensuring compliance with statutory duties’ Competition Commission Referral ‘Given the importance of the issue, we are disappointed that the Director and the industry have not co-operated to develop an agreed methodology for assessing both serviceability to customer and asset condition’ Capital Maintenance Planning A common framework UKWIR Report Ref. No 02/RG/05/3

UK WIR CM Implementation Capital maintenance is defined as the renewal or refurbishment of capital assets in order to provide continuing service to customers and the environment consistent with current regulatory obligations. Stage A Historical Analysis Identify the historical levels of maintenance expenditure and serviceability indicator trends Stage B Identify future maintenance expenditure to meet regulatory objectives Stage C Compare and explain results of historical and forward-looking analyses; make the case for the required level of future maintenance Main focus for improvement in the development of the Common Framework

UK WIR Process Historical Analysis Forward-looking Analysis Conclusions

UK WIR Ofwat assessment

UK WIR Models and tools

UK WIR Application To apply the common framework you need to understand: Asset deterioration rates Likely changes in asset performance, and resulting impact on service The costs of replacing assets, compared with the costs of maintaining deteriorating assets This all needs to be supported by robust data and information

UK WIR Data make it visible A download from an Operational Common Database indicates we have assets in the Wash and North Sea!

UK WIR Top down

UK WIR Top down measures

UK WIR Asset grouping Water Service Non Infrastructure Surface water treatment works Ground water treatment works Pumping stations Meters Plant, vehicles, offices etc. Wastewater Service Non Infrastructure Sewage pumping stations Sewage treatment works Sludge treatment facilities Plant, vehicles, offices etc. Wastewater Infrastructure Critical sewers Non critical sewers Pumping mains Sewer structures Plant, vehicles, offices etc. Water Infrastructure Mains Communication pipes Raw water reservoirs Treated water reservoirs Aqueducts Leakage maintenance Plant, vehicles, offices etc. Below ground assets Above ground assets

UK WIR Burst frequency model Interruptions model Water quality model Optimal set of interventions Mains data Weather data Expert opinion Service risk targets Intervention options Scenarios Replacement costs Repair costs Refurbishment costs

UK WIR Bursts predictions

UK WIR Non infrastructure methodology is based on Failure Mode Effects & Criticality Analysis (FMECA), incorporating reliability theory identify generic asset groups, i.e. similar processes and consequences identify principal failure modes for each failure mode: estimate probabilities of failure (failure rates) estimate service consequences of failure & impact probabilities estimate cost consequences of failure identify intervention options replace or refurbish and/or operational changes assess costs and benefits of interventions select optimal interventions

UK WIR Consequences of failure

UK WIR Failure rate data validation Expert panel estimate

UK WIR number of effluent quality failures per year number of flow compliance failures per year odour risk flooding risk pollution incident risk sludge diversion/tankering risk H&S risk overall risk measure cost Wastewater treatment works - form of results

UK WIR Required Performance level Intervention Point When to invest

UK WIR Typical investment decision

UK WIR Cost risk Option 1 – cost certainty The amount of investment is capped at a fixed point in time Risk £ Performance Optimum for cost certainty Intervention point

UK WIR Performance risk Option 2 – performance certainty The level of performance is fixed and the investment will be flexible £ Risk Performance Optimum for performance certainty

UK WIR Common framework Ofwat have assessed the implementation of the common framework for each company and each sub service

UK WIR Development areas Top Down vs Bottom Up Approaches Risk Identification Deterioration Models Non Infrastructure – Measurement of the Consequences of Failure IT Assets and other short lived assets

UK WIR Conclusion Overall a good start in the UK More emphasis in 2010 – 15 Opportunities to share data Some development areas Heralded as a success by Ofwat and the Industry

UK WIR Thank you