Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected.

Slides:



Advertisements
Similar presentations
MnDOT 2007 Pilots n Mixture Sampling Modification –Increase randomness of sampling. »Sample is split in the field and stored in containers labeled with.
Advertisements

Start with your equation Move the # term to the other side, and leave a space Determine what HALF of the coefficient of X is Factor the left side Write.
Statistical Techniques I
Creating a Chartres Labyrinth 11 Steps to reproducing your own Chartres Labyrinth.
A cake is shaped like a rectangle that is 13 in. long and 9 in. wide. There is one candle at each corner of the cake, and there are candles at one-inch.
CHAPTER 2 ORGANIZING AND GRAPHING DATA. Opening Example.
Architecture From Math to Building Design. Scale Scale is a Ratio Scale is a Ratio A ratio compares one thing to another A ratio compares one thing to.
INTEGRALS Areas and Distances INTEGRALS In this section, we will learn that: We get the same special type of limit in trying to find the area under.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Copyright © Cengage Learning. All rights reserved. 5 Integrals.
1 Overview CQC Asphalt Specifications.  Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency. 
Asphalt Quality Assurance Program
Word Processing Chapter 5 Review Slides. All template files have this file extension and are stored in the Templates folder.dotx.
Perimeter Rectangles, Squares, and Triangles Perimeter Measures the distance around the edge of any flat object. To find the perimeter of any figure,
Tree measurement Michael Ferguson
Perimeters and Areas of Rectangles
Literal Equations and Formulas
Objective: To describe and summarize data using charts and tables.
Constrution Mathematics Review
Analysis of gait Analysis of gait.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Think Math Leveled Problem Solving Grade 4 Chapters 4-7.
WARM-UP Marina has the following quiz grades in her Discrete Math class: 84, 90, 96, 100, 67, 88, 90, 92, 94. Find the mean, median, mode, and standard.
You have learned to use a verbal model to solve real-life problems. Verbal models can be used with other problem solving strategies, such as drawing a.
Asphalt Roadway Daily Report of Quality Control (Form No ) A step by step guide.
INTEGRALS Areas and Distances INTEGRALS In this section, we will learn that: We get the same special type of limit in trying to find the area under.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. Chapter 6 Normal Probability Distributions 6-1 Review and Preview 6-2 The Standard Normal.
Perimeter of Rectangles
Copyright © Cengage Learning. All rights reserved. 4 Integrals.
Random Sampling Approximations of E(X), p.m.f, and p.d.f.
Edexcel Physics P2 (2012/3).
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
ERLPM Workshop Statistical Analysis
Comparative Planetology
In Chapters 6 and 8, we will see how to use the integral to solve problems concerning:  Volumes  Lengths of curves  Population predictions  Cardiac.
On a floor plan of her room, the length of Hailey’s bed is 3 inches. If the scale of her floor plan is inch = 1 foot, what is the actual length of her.
Dimensioning 1’ - 8” 8’ - 4” Unit 8.
Introduction to Drafting and Design
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
4.1 Radian and Degree Measure (part 2) V. Evaluating degrees° minutes’ seconds” (D°M’S”) A) The distance between two degrees (ex: 15°& 16°) can be 1) divided.
Example 4 Write a Quadratic Function in Vertex Form Write in vertex form. Then identify the vertex. = x 2x 2 10x+22 – y SOLUTION = x 2x 2 10x+22 – y Write.
Pre-Algebra 3-7 Solving Inequalities with Rational Numbers Review/Finish Chapter 10-4 Page 517 #14-26 Solve and Graph- Due today!
Measurement Pages 141 – 166.  A centimeter (cm) is about the with of a fingernail. A millimeter (mm) is about the thickness of a dime. A person’s waist.
Copyright © Cengage Learning. All rights reserved. 4 Integrals.
The Field An Investigation The Field The drawing (which is NOT drawn to scale) shows a field. The area of the field is 8000 square metres. The field.
Opening Activity 1. What is the area of a rectangle with a length of 5 inches and a width of 12 inches? (Remember: A=lw) A=lw A=(5)(12) 2. What is the.
Constructions Bisect – To divide something into two equal parts Perpendicular – Lines that intersect to form right angles. Today’s constructions: –Bisect.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
Copyright © Cengage Learning. All rights reserved.
Copyright © Cengage Learning. All rights reserved.
Scale Drawings TeacherTwins©2014.
Gateway – Unit 7 – Green Architecture
CCSS-M: Fractions Part 1
Splash Screen.
Paving Assessments.
CCSS-M: Fractions Part 1
Section 2.7 Polynomials and Rational Inequalities
Introduction to Drafting and Design
How to use this book: When you see a star, click for a definition of a word on the page! Click through the pages for pop-ups and activities!
Put your name, Class Period, and Academic Year on the cover
Making a “Foldable” to Remember the Exponent Laws
Design Brief Liam and Dorsa.
Question 20.
Making a “Foldable” to Remember the Exponent Laws
First we need to draw a place table grid. Then write our number in it
The Standard Normal Distribution
a + 2 = 6 What does this represent? 2 a
Finding the area of fractional side lengths
4-figure grid references
13.1 Finding Limits Using Tables and Graphs
Presentation transcript:

Random Sampling Chapter 6

Same Materials Same Process Same Opportunity to be Selected

Lot will be tested in two processes As mixed by the plant: Plant Produced Material As mixed by the plant: Plant Produced Material As laid down and compacted by the contractor: Field Placed Material As laid down and compacted by the contractor: Field Placed Material

Definition of a Lot One Day’s production ≤ 2000 Tons One Day’s production ≤ 2000 Tons Half Day’s production when Day Production is Tons Half Day’s production when Day Production is Tons

Sampling on a Lot Divide Lot into 4 Equal sublots except for Test Strip were the lot is divided by 3 Divide Lot into 4 Equal sublots except for Test Strip were the lot is divided by 3 Take sample form each sublot Take sample form each sublot

Partial Lot Plant Produced material 3-4 samples were taken, sublots Constitute a Lot 3-4 samples were taken, sublots Constitute a Lot 1-2 sublots add to next day 1-2 sublots add to next day Next day production would have 3-6 sublots Next day production would have 3-6 sublots

Sampling Plant Produced Materials Sample by Time Sample by Time Sample by weight (Tonnage) Sample by weight (Tonnage)

Sampling by Time Production Duration 10 HRS Production Duration 10 HRS Sublots: 10/4 = 2 ½ Hrs = 150 minutes Sublots: 10/4 = 2 ½ Hrs = 150 minutes Assuming trucks will leave every 10 Min. Assuming trucks will leave every 10 Min. Increment 150 /10 = 15 trucks Increment 150 /10 = 15 trucks Form 15 numbered pieces and put them in a bowl Form 15 numbered pieces and put them in a bowl Draw one per Sublot Draw one per Sublot Sample the truck at time selected Sample the truck at time selected Example

Sampling by weight (Tonnage) Lot size 2000 Tons Lot size 2000 Tons Assuming load on Trucks = 20 Tons Assuming load on Trucks = 20 Tons Sublots size 2000/4 = 500 Tons Sublots size 2000/4 = 500 Tons Increment 500/20 = 25 trucks per sublot Increment 500/20 = 25 trucks per sublot Form 25 numbered pieces and put them in a bowl Form 25 numbered pieces and put them in a bowl Select one for each sublot Select one for each sublot Sample the selected truck Sample the selected truck Example

Sampling Field Placed Materials Lot side equal to Plant Produced Material, however the Plant Produced Material may have 3-6 sublots Lot side equal to Plant Produced Material, however the Plant Produced Material may have 3-6 sublots Divide the lot into 4 sublots (regardless of the Plant Produced Material sublots) Divide the lot into 4 sublots (regardless of the Plant Produced Material sublots) Use Random Sampling Table 1 on Pages 40/41 of ERLPM Use Random Sampling Table 1 on Pages 40/41 of ERLPM Form 28 Numbered Pieces Form 28 Numbered Pieces

Sampling Field Placed Materials Column A is the Sublot number Column A is the Sublot number Column B is the longitudinal factor used to identify location along the length of sublot Column B is the longitudinal factor used to identify location along the length of sublot Column C is the lateral factor used to identify location from referenced side of sublot Column C is the lateral factor used to identify location from referenced side of sublot If the same number is drawn, use the following set of 4 If the same number is drawn, use the following set of 4

Field Placed Materials Example

Example From bowl with 28 numbered pieces, number 12 is Drawn From bowl with 28 numbered pieces, number 12 is Drawn From Column “ A ” Select Lines 01, 02, 03 and 04 From Column “ A ” Select Lines 01, 02, 03 and 04 From column B :.320,.489,.542,.153 From column B :.320,.489,.542,.153 From Column C :.212,.827,.352,.163 From Column C :.212,.827,.352,.163

Pavement Width /2 Feet Select Reference Side (left) Divide lot length 1600/4 = 400 Feet Samples to be taken no Closer Than 1 Foot from a Joint

Example – Cont. Sublot 1 Length 400x.320 = 128’ Width 12.5x.212 = 3’ Sublot 2 Length 400x.489 = 196’ Width 12.5x.827 = 10’

Sublot 3 Length 400x.542 = 217’ Width 12.5x.352 = 4’ Sublot 4 Length 400x.153 = 61’ Width 12.5x.163 = 2’

Joints Could be within same lot or abutting lots Could be within same lot or abutting lots When within two different lots use the lwest specific gravity When within two different lots use the lwest specific gravity Divide length into 4 equal sublots Divide length into 4 equal sublots Directly on the joint Directly on the joint Minimum diameter 5” Minimum diameter 5” Penalty on joint density Penalty on joint density

Joint testing example 1000 feet 300 feet 1000 feet 700 feet

Joint Length 1000 – 300 = 700 feet (between lines 1 and 2) 1000 – 300 = 700 feet (between lines 1 and 2) = 700 feet (between lines 2 and 3) = 700 feet (between lines 2 and 3) Total length = 1400 Total length = /4 = 350 feet 1400/4 = 350 feet

Joint Testing – Cont. From the bowl with 28 numbered pieces we drawn number 16 From the bowl with 28 numbered pieces we drawn number 16 B values for column 16 B values for column ,.739, 548, ,.739, 548,.516 Sublot 1; 350x0.331 = =116’ Sublot 1; 350x0.331 = =116’ Sublot 2; 350x = = 609 Sublot 2; 350x = = 609 Sublot 3; 350x0.548 = = 192’ Sublot 3; 350x0.548 = = 192’ Sublot 3; 350x = =531’ Sublot 3; 350x = =531’

Joint testing 1000 feet 300 feet 1000 feet 116 feet

Joint testing 1000 feet 300 feet 1000 feet 609 feet

Joint testing 1000 feet 300 feet 1000 feet 192 feet

Joint testing 1000 feet 300 feet 1000 feet 531 feet

Joint testing – second lane 1000 feet 300 feet 1000 feet 116 feet 300 feet 600 feet

Total Joint length = 900 feet 900/4 = 225 feet Number 20 is selected Sublot Sublot Sublot Sublot

Distances along the joint Sublot 1 225x.415 = = 93 Sublot 2 225x.958 = = 216 Sublot 3 225x.150 = = 34 Sublot 4 225x = 35

Joint testing – second lane 300 feet 1000 feet 300 feet 93 feet

Joint testing – second lane 300 feet 1000 feet 300 feet 441 feet

Joint testing – second lane 300 feet 1000 feet 300 feet 484 feet

Joint testing – second lane 300 feet 1000 feet 300 feet 110 feet

Any Question?

N e xt Topic Quality Assurance