Slide 1 November 2005 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Phase 1 Recommendations Oakdale Irrigation.

Slides:



Advertisements
Similar presentations
ClimDev-Africa Program & African Climate Policy Center (ACPC)
Advertisements

May 18, 2005 Oakdale Irrigation District Water Resources Plan.
Slide 1 Oakdale Irrigation District Water Resources Plan.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Community Water Supply Resources Implementation Strategy Lane Auditorium Albemarle County Office Building September 13, 2007.
1 U.S. EPA State Revolving Fund: Providing Affordable Financing George Ames U.S. EPA IADF Conference on Financing Municipalities and Sub-National Governments,
Sacramento Local Agency Formation Commission Peter Brundage, Executive Officer; Donald J. Lockhart, Assistant Executive Officer; Diane Thorpe, Commission.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
Alachua County Post-Disaster Redevelopment Plan Alachua County Board of County Commissioners Meeting April 27, 2010.
Build and maintain democratic and decentralized local government institutions that are capable to participate in the development of social and economic.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Development (Impact) Fee Program Changes to Comply with State Law Mayor and Council Study Session June 3, 2014.
Eric R. Johnson Hillsborough County, (Tampa) FL
Overview of the IT 3 Initiative CONFIDENTIAL Discussion Document September 2008.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Slide 1 Infrastructure Plan − Existing System Assessment Oakdale Irrigation District July 5, 2005.
BUILDING SUSTAINABILITY: PARTNERSHIPS AND FINANCE by S. Adrian Ross Senior Programme Officer PEMSEA.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
IWRM as a Tool for Adaptation to Climate Change
Determining and Setting Public Utility Rates Bill Wilks, Senior Project Manager November 19, 2014 AGFOA Fall Conference.
1 Emergency Financial Response: Drought Rates May 15, 2014.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
City Council October 21, 2013 Strategic Planning Retreat Next Steps.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
Colorado River Basin Water Supply and Demand Study Next Steps: Agriculture Conservation, Productivity, and Transfers Workgroup Urban Water Institute Conference.
Compact for a Sustainable Ventura County A project of the Ventura County Civic Alliance and the Ventura Council of Governments.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
Growth Management Legislative Discussion March 20, 2012.
1 Partners in Progress US EPA’s Memorandum of Understanding with Organizations Involved in Decentralized Wastewater Management April 29, 2008.
Slide 1 April 18, 2006 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Financial Model and Discussion of Preferred.
One Step Ahead: Using a Finance Plan for Regional Water System Operations Deena Hood Central Wyoming Regional Water System Carol Malesky Integrated Utilities.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Workshop 2 – Administrative Structure Recycled Water Feasibility Study Rancho Murieta Community Services District January 8, 2008.
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Overview of a Water Action Plan: California Public Utilities Commission Paul G. Townsley, President Arizona American Water January 18, 2011.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
California Integrated Waste Management Board Tire Flow Study Along the California-Mexico Border Region Special Waste Committee Meeting California Integrated.
Slide 1 Infrastructure Plan − Improve Service Projects Oakdale Irrigation District August 17, 2005.
Special Water Users Associations in Southern New Mexico Sunday, January 03, 2016 Elephant Butte Irrigation District.
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Kyrgyz Republic. WUA Forming Law of Water Users Unions (Associations) ( ). Standard constituent documents. Process of WUA forming Training of.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
Slide 1 February 21, 2006 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Water Supply Reliability Oakdale Irrigation.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Slide 1 Oakdale Irrigation District Water Resources Plan “What We’ve Learned” October 2005.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
California Department of Public Health / 1 CALIFORNIA DEPARTMENT OF PUBLIC HEALTH Standards and Guidelines for Healthcare Surge during Emergencies How.
Slide 1 March 7, 2006 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Discussion of Annexation/Expansion Issues.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Alan Matheson State Planning Coordinator November 19, 2013 Preparing for an Uncertain Future: Developing a Utah Water Strategy Alan Matheson Executive.
Planning Commission Ian Macek May 26, 2016 Freight Master Plan.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
OBJECTIVE 1 Irrigation District Infrastructure Studies
Water Resources Plan 2040 Update
Water Reclamation Plant Feasibility Study Update May 28, 2014
Joshua Basin Water District Draft Findings & Rate Scenarios
Joshua Basin Water District Revised Rate Recommendations
PUBLIC HEARING: ESTABLISH A 20% WATER CONSERVATION TARGET AND IMPLEMENT LEVEL 1 WATER SUPPLY SHORTAGE PLAN March 27, 2017 Item 9.
East Contra Costa Fire Protection District Strategic Plan
PLANNING DOCUMENTS 2018 New Mexico infrastructure finance conference
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Sacramento Local Agency Formation Commission
Indiana Finance Authority (IFA)
Presentation transcript:

Slide 1 November 2005 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Phase 1 Recommendations Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Phase 1 Recommendations

2 Water Resources Plan (Refresher) What is it? w Assesses where we are as an irrigation district w Describes measures needed to make us better w Addresses federal, state and local challenges to our water w Provides mechanisms to protect our water w Tells us what it will cost to meet our needs and how to pay for it A Planning Document that… Technical Analyses Institutional Activities Public Involvement

3 The Four Phases of the WRP Perform detailed assessment and data collection Prepare programmatic CEQA document Develop Implementation Plan Implement WRP Engineering Design Construction Finalize WRP Develop options and evaluate alternatives Develop recommendations Publish draft WRP and initiate CEQA

4 Water Resources Plan Goals w Provide long-term protection to OID’s water rights. w Address federal, state, and local water challenges. w Rebuild/modernize an out-of-date system to meet changing customer needs. w Develop affordable ways to finance improvements. w Involve the public in the planning process.

5 Understanding OID’s Responsibilities in the Planning Process w Irrigation districts were formed to provide reliable water supplies to the lands they serve and to protect those water resources w Irrigation districts must provide for the long term financial health of the organization – Maintaining affordable rates – Recognizing the need to repair, replace, rehabilitate and modernize the system it operates w Comply with all federal, state and local laws – Be good stewards of our water resources

6 How the Planning Process Works DECISIONS DISCUSSION FACTS DATA Land Use, Water Balance, Infrastructure Evaluation, Modernization Needs, Finances Water Resource Plan CEQA Plan Adoption w Provide long-term protection to OID’s water rights w Address federal, state and local water challenges w Rebuild/modernize an out-of-date system to meet changing customer needs w Develop affordable ways to finance improvements w Involve the public in the planning process

7 Substantial Technical Work is the Basis of Plan Recommendations Infrastructure Public Outreach Water Balance Finances Land Use

8 Substantial Technical Work is the Basis of Plan Recommendations Infrastructure Public Outreach Water Balance Finances Land Use w 60% of current customers are on 10 acres or less w Between now and 2025, likely to see significant amount of land conversions in OID Service Area w Land use conversions will result in substantially less demand for OID water w Agricultural lands within OID’s Sphere of Influence could be recipients of this water, if made available

9 Substantial Technical Work is the Basis of Plan Recommendations Public Outreach Water Balance Finances Land Use Infrastructure w Evaluated 100 miles of pipeline, 200 miles of open ditches, 40 miles of Main Canals, in addition to wells, turnout gates, and drainage pumps w Nearly all water supply canals were constructed 50 years ago or more w 340 miles of distribution system and only 1 reservoir w OID has only 4 automated sites in its system

10 Substantial Technical Work is the Basis of Plan Recommendations Infrastructure Public Outreach Finances Land Use Water Balance w In addition to current water transfers, about 70K acre-feet leaves OID Service Area – 30% of diverted water – Water leaves without benefit to OID w Surrounding 9 irrigation districts average 40 inches per acre applied water w OID’s average use is over 60 inches per acre

11 Substantial Technical Work is the Basis of Plan Recommendations Infrastructure Public Outreach Water Balance Land Use Finances w In 1979 the Water Rate was $31 per acre w In 2000 the Water Rate was $27.50 per acre w In 2005 the Water Rate is $19.50 per acre w 90% of Water Rate subsidized by power sales and water transfers w The “unsubsidized” water rate is $ per acre w/o power or water transfers

12 Substantial Technical Work is the Basis of Plan Recommendations Infrastructure Water Balance Finances Land Use Public Outreach w Interviews were conducted with growers, public officials, and other members of the community w Significant outreach kept the public informed w Most all participants questioned wanted more flexibility in the services provided by OID

13 OID’s Challenges from today to 2030 will be to... w Replace aging water system w Modernize our water delivery system to enhance water service to meet customer needs w Respond to regulatory issues w Protect surplus water for our agricultural, rural, and urban customers w Continue to involve the public

14 Specific Recommendations Were Developed to Meet the WRP Goals INFRASTRUCTURE ORGANIZATION COMMUNITY OUTREACH FINANCIAL POLICIES AND PROGRAMS ENVIRONMENTAL DOCUMENTATION w Provide long-term protection to OID’s water rights w Address federal, state and local water challenges w Rebuild/modernize an out-of-date system to meet changing customer needs w Develop affordable ways to finance improvements w Involve the public in the planning process

15 Evaluation Process

16 By 2030, OID will have 67,000 ac-ft more than it needs, due to... Question: What should OID do with that water? w Changes in land use – less overall demand w Improved customer service - keeps current customers and attracts new ones within current service area w System improvements – more efficient operations

17 Four alternatives were developed to address that question. Continuation of existing transfers ALTERNATIVE 1 Alternative 1 continues Present Practices.

18 Four alternatives were developed to address that question. Transfers to willing buyers (9,000 ac-ft more than current) Variable transfers to willing buyers ALTERNATIVE 2 50,000 ac-ft 17,000 ac-ft Alternative 2 maximizes service improvements within district boundaries.

19 Four alternatives were developed to address that question. Alternative 3 moderately expands service within OID’s Sphere of Influence. Transfers to willing buyers (9,000 ac-ft more than current) Variable transfers to willing buyers ALTERNATIVE 2 50,000 ac-ft 17,000 ac-ft Transfers to willing buyers (9,000 ac-ft more than current) ALTERNATIVE 3 50,000 ac-ft 17,000 ac-ft Supports OID expansion into SOI, approx. 4,250 acres

20 Four alternatives were developed to address that question. Alternative 4 maximizes expansion of service within OID’s Sphere of Influence. ALTERNATIVE 4 67,000 ac-ft Supports OID expansion into SOI, approx. 16,750 acres Transfers to willing buyers (9,000 ac-ft more than current) Variable transfers to willing buyers ALTERNATIVE 2 50,000 ac-ft 17,000 ac-ft Transfers to willing buyers (9,000 ac-ft more than current) ALTERNATIVE 3 50,000 ac-ft 17,000 ac-ft Supports OID expansion into SOI, approx. 4,250 acres

21 20-Year Program Costs Exclusive of Main Canals & Tunnels Alternative 1 Alternative 2 Alternative 3 Alternative 4 Rehabilitation Projects$94M Improved Service Projects$0$30M Total CIP$94M$124M For $30M: Add’l Flow-Control and Measurement Structures Add’l Groundwater Wells North Side Regulating Reservoir Accelerated Irrigation Service Turnout Replacement Revenue-generating Drainwater Reclamation Projects

22 Sub-alternatives Customer Water Charge Depends on how OID Pays for the Plan Sub-alternatives that do not include water transfers Sub-alternatives that include moderate water transfers

23 Alternatives Water Resources Plan Goals Provide long-term protection to OID’s water rights Address federal, state, and local water challenges Rebuild/modern -ize an out-of- date system to meet changing customer needs Develop affordable ways to finance improvements Involve the public in the planning process Alternative 1: Continue Present Practices Alternative 2: Maximize Service Improvements within District Boundaries Alternative 3: Maximize Service Improvements within District Boundaries, Moderate Expansion of Service within SOI Alternative 4: Maximize Expansion of Service within OID’s SOI

24 Alternatives Water Resources Plan Goals Provide long-term protection to OID’s water rights Address federal, state, and local water challenges Rebuild/modern -ize an out-of- date system to meet changing customer needs Develop affordable ways to finance improvements Involve the public in the planning process Alternative 1: Continue Present Practices Alternative 2: Maximize Service Improvements within District Boundaries Alternative 3: Maximize Service Improvements within District Boundaries, Moderate Expansion of Service within SOI Alternative 4: Maximize Expansion of Service within OID’s SOI

25 Alternatives Water Resources Plan Goals Provide long-term protection to OID’s water rights Address federal, state, and local water challenges Rebuild/modern -ize an out-of- date system to meet changing customer needs Develop affordable ways to finance improvements Involve the public in the planning process Alternative 1: Continue Present Practices Alternative 2: Maximize Service Improvements within District Boundaries Alternative 3: Maximize Service Improvements within District Boundaries, Moderate Expansion of Service within SOI Alternative 4: Maximize Expansion of Service within OID’s SOI

26 Alternatives Water Resources Plan Goals Provide long-term protection to OID’s water rights Address federal, state, and local water challenges Rebuild/modern -ize an out-of- date system to meet changing customer needs Develop affordable ways to finance improvements Involve the public in the planning process Alternative 1: Continue Present Practices Alternative 2: Maximize Service Improvements within District Boundaries Alternative 3: Maximize Service Improvements within District Boundaries, Moderate Expansion of Service within SOI Alternative 4: Maximize Expansion of Service within OID’s SOI

27 Alternatives Water Resources Plan Goals Provide long-term protection to OID’s water rights Address federal, state, and local water challenges Rebuild/modern -ize an out-of- date system to meet changing customer needs Develop affordable ways to finance improvements Involve the public in the planning process Alternative 1: Continue Present Practices Alternative 2: Maximize Service Improvements within District Boundaries Alternative 3: Maximize Service Improvements within District Boundaries, Moderate Expansion of Service within SOI Alternative 4: Maximize Expansion of Service within OID’s SOI

28 Alternatives Water Resources Plan Goals Provide long-term protection to OID’s water rights Address federal, state, and local water challenges Rebuild/modern -ize an out-of- date system to meet changing customer needs Develop affordable ways to finance improvements Involve the public in the planning process Alternative 1: Continue Present Practices Alternative 2: Maximize Service Improvements within District Boundaries Alternative 3: Maximize Service Improvements within District Boundaries, Moderate Expansion of Service within SOI Alternative 4: Maximize Expansion of Service within OID’s SOI

29 INFRASTRUCTURE ORGANIZATION COMMUNITY OUTREACH FINANCIAL POLICIES AND PROGRAMS ENVIRONMENTAL DOCUMENTATION Implementing the WRP Will Benefit OID’s Customers and the Community

30 Specific Recommendations Were Developed to Meet the WRP Goals INFRASTRUCTURE ORGANIZATION COMMUNITY OUTREACH FINANCIAL POLICIES AND PROGRAMS ENVIRONMENTAL DOCUMENTATION Adopt customer-based service standards. Develop specific operating procedures to implement service standards. Implement specific projects to improve service to customers. Repair and rehabilitate vulnerable main canals and tunnels.

31 INFRASTRUCTURE ORGANIZATION COMMUNITY OUTREACH FINANCIAL POLICIES AND PROGRAMS ENVIRONMENTAL DOCUMENTATION Specific Recommendations Were Developed to Meet the WRP Goals Invest in staff to provide the technical support to meet the district’s mission, “to protect and develop OID’s water resources and provide excellent irrigation and domestic water service.” Outline the staffing structure to implement the WRP.

32 INFRASTRUCTURE ORGANIZATION COMMUNITY OUTREACH FINANCIAL POLICIES AND PROGRAMS ENVIRONMENTAL DOCUMENTATION Specific Recommendations Were Developed to Meet the WRP Goals Designate a public information officer. Publish a quarterly newsletter. Conduct periodic community presentations regarding CEQA and WRP implementation. Establish web site information pages.

33 INFRASTRUCTURE ORGANIZATION COMMUNITY OUTREACH FINANCIAL POLICIES AND PROGRAMS ENVIRONMENTAL DOCUMENTATION Specific Recommendations Were Developed to Meet the WRP Goals Project estimated revenues from transfers and power sales over time. Consolidate priorities for WRP and Main Canal and Tunnel Projects. Adopt financial strategy that protects against inflation for all areas of revenue sources. Identified costs for new lands to connect to OID system.

34 INFRASTRUCTURE ORGANIZATION COMMUNITY OUTREACH FINANCIAL POLICIES AND PROGRAMS ENVIRONMENTAL DOCUMENTATION Specific Recommendations Were Developed to Meet the WRP Goals Provide for the future water needs of the cities of Oakdale and Riverbank. Conduct DSO and irrigator training to improve customer service. Expand the Boundary Flow Measurement Program. Continue to engage groundwater planning activities in the Modesto Sub basin. Develop a drought response plan.

35 INFRASTRUCTURE ORGANIZATION COMMUNITY OUTREACH FINANCIAL POLICIES AND PROGRAMS ENVIRONMENTAL DOCUMENTATION Specific Recommendations Were Developed to Meet the WRP Goals Prepare a programmatic environmental impact report (PEIR) to guide WRP implementation (Main Canal and Tunnel Program on separate environmental track). Obtain required federal, state, and local permits and authorizations. Process individual maintenance or minor improvements projects as Categorical Exemptions or Initial Studies/Negative Declarations.

36 Implementing the Best Apparent Alternative Will Benefit OID’s Customers and the Community w Protect OID’s water rights. w Enhance customer service for all users. w Rebuild, modernize, and expand system infrastructure. w Protect the future water supply needs of the cities of Oakdale and Riverbank. w Keep water rates affordable through a balanced effort of water transfers and service to new customers within OID’s Sphere of Influence. w Substantially increase water supply reliability and meet OID service in a worst-case drought.

37 Next Steps NovemberDecemberJanuary 14 th – Board Presentation 6 th – Board “Acceptance of Draft WRP” as sufficient to initiate CEQA Hold Scoping Meeting Late Nov – Publish Draft WRP Documents Publish Notice of Preparation

Slide 38 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. November 2005