IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Slides:



Advertisements
Similar presentations
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Milan - 29 th September 2010 CASC Project Italian Working Table Report to CSE NRAs.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
1. Long term auction platform IFE: Progress report. Signature of the MoU and preparation of transfer of long term auctions to CASC.EU IPE: Planning for.
Planning for allocation rules and the auction platform NRAs propose to follow a two-steps approach:. 2013: » Based on the wish-list and within the scope.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
Draft document – Work in progress
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
MAIN PREMISES TO THE FINANCIAL SECURITY RULES USED BY THE GAS TRANSMISSION OPERATOR GAZ-SYSTEM S.A. IN TRANSMISSION CONTRACTS AND NETWORK CONNECTION AGREEMENTS.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Paris, 1 st March th IG meeting - SWE ERI.
Milan – 16 th November 2010 Cross Border capacity allocation in 2011: CASC Project.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
1/31 Rules for Capacity Allocation by Explicit Auctions within Central West Europe Region (CWE), Central South Europe Region (CSE) and Switzerland Workshop.
CASC.EU SA and its role in Explicit auctions 16/11/2010 CASC.EU SA 1.
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
_________ CASC.EU Intraday Forum _________ ROME, March 13 th, Intraday Forum, ROME, 2012/03/13.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
FUI Stakeholder Group 4 th July 2008 Congestion Management.
Long term allocation 2011 Italian borders Central-South and Central-West Regions 2nd Joint RCC meeting Milan, September 28 th, 2010.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
RMC Regional Market Coordination RMC Regional Market Coordination RMC Regional Market Coordination CWE Capacity Allocation Service Company CASC Presentation.
1 Identification of the needs to modify auction rules in the FUI region Congestion management meeting – 11 January 2007.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
1 IG Meeting Milan, 18 th July 2008 Cost of Firmness of Capacity.
2nd IMPLEMENTATION GROUP MEETING. Lisbon, 24th January 2008 Conclusions from the 3rd technical RCC.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1 Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15 th May 2012.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
CASC.EU – Capacity Allocation Service Company CASC.EU SA 23/11/10CASC-EU S.A. (R)
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
CNMC and CRE intend to formally approve IFE rules 3.1 by mid-March
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Public Consultation : main conclusions (1/2)
21st IG Meeting South Gas Regional Initiative
Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15th May 2012.
SWE Day- Ahead market coupling
Moyle & East West Access Rules Approval
20th April 2016 Teleconference
Feedback on the SWE coupling Public Consultation
Regulators’ update on Congestion Management and Balancing
37th IG Meeting South Gas Regional Initiative
20th April 2016 Teleconference
20th April 2016 Teleconference
29th April 2014 Teleconference
24th January 2017 Teleconference
Presentation transcript:

IFE-CASC.EU project Forum with market parties Paris – 18th June

Welcome and Agenda 9: :00 - Welcome of participants 10:15 - Project presentation 10:30 - Presentation of CASC.EU 10: 45 - Proposed evolutions for the yearly and monthly allocations 11:10 - Proposed evolutions for the daily and intraday allocations 11:30 - Feedback from market parties 12: :00 Lunch 2

Project presentation Context and background Over the last 2 years, RTE, REE and CASC.EU have been working for the integration of IFE LT auctions in CASC.EU platform following ACER recommendations (FWGL-CACM and cross-regional roadmaps presented at Florence Forums) After the 10th IG meeting of this SWE-ERI, TSOs requested to Regulatory Commissions, and Ministries where relevant, the needed comfort for the project and sent a detailed project description A MoU between CASC-RTE-REE was signed in 15 th April

Main goals of the project Foreseen scenario :  Transfer of the IFE Yearly and Monthly auctions to CASC-EU, Current situation in IFE PTR Annual auction: REE PTR Monthly auction: RTE PTR Daily auction: RTE PTR ID auction: REE Situation in IFE in 2014 PTR Annual auction: CASC.EU PTR Monthly auction: CASC.EU PTR Daily auction : RTE PTR ID auction: REE Daily Auction will be replaced by Day Ahead Market Coupling SWE-NWE 4

Planning  15 th April 2013: MoU signature.  May 2013: Information towards Market Participants (MP), NRAs and other TSOs.  June 2013:  Launch of Public Consultations on LT and ST Auction Rules (3 weeks)  IFE Users’ Forum (18 th June)  Comments on the two set of Rules (during the consultation period)  July 2013: Submission of final IFE LT and ST Auction Rules to the NRAs (Spanish Ministry and CRE), for their approval  Foreseen Go live for December 2013 Auction, subject to NRA approval 5

Evolutions of long-term auctions Yearly and monthly auctions on IFE will be no longer covered by IFE rules  all references to long-term auctions have been removed by IFE rules 3.0 Yearly and monthly auctions on IFE will be covered by a new version of the Harmonized Auction Rules (HAR v2.0) Public consultation is now open (until 21st June for HAR 2.0, 25th June for IFE rules 4.0) 6

7

The HAR deals with the Allocation of PTRs – Only one Declaration of Acceptance (DoA) on HAR dealing with the Allocation; no DoA for Nomination – The DoA will be signed by CASC and the Participant DoA for nomination will be covered in local regulation (Spanish Operational Procedure 3.1 and I/E Rules in France) The HAR are issued for an unlimited period Some border specificities HAR - Auction Rules structure 8

HAR - Participation requirements Signature of the Declaration of Acceptance (DoA) Financial Guarantees : Business Account Entitlement 9

Any entity will be entitled for all Yearly and Monthly auctions if it is active on the Electricity Market in at least one control area For Spain: Certificado del Operador del Sistema- Sujeto del Mercado issued by REE HAR - Participation requirements UIOSI, Transfer and Resale mechanisms can be used by Participants even if they cannot nominate the PTRs bought 10

HAR - Financial Guarantees Cash deposit – Business Account (no more bank guarantees for LT PTRs on IFE). The Credit limit to be awarded of capacity should cover : Monthly product: full amount Yearly product: 2/12 th of the total amount Amounts are blocked Invoicing/self-billing : 5 working days of M+1 11

For France-Spain, an aggregation of Yearly and Monthly Held Capacities Sent at 16:00 HAR – Programming authorisations 12

UIOSI mechanism is applied on all Country Borders. For France-Spain border : – Marginal price of the specific daily auction  Same as today in IFE rules – Positive day-ahead spot market spread in the affected period in the same direction, in case of cancellation of the daily auction HAR - UIOSI 13

Held capacities are firm, except for Force Majeure and Safety of the system. Firm after sending PA, except for Force Majeure. For France-Spain, compensation based on day-ahead spread + two caps: On the day-ahead market spread values On the monthly total amount of compensations Exchange Programs are firm, except for Force Majeure Compensation is based on initial price. HAR - Firmness 14

Transfer mechanism for exchanging Yearly/Monthly Capacities between Participants with notification to TSOs Resale of Yearly Capacities in a Monthly Auction HAR - Secondary Market 15

HAR - Secondary Market Bulletin Board : to exchange proposals for transfer among parties Prototype of the Bulletin board (please not that below examples of the screens might be different in the production environment) 16

Evolutions of short term auctions Yearly and monthly auctions will be no longer covered by IFE rules 4.0  all references to long-term auctions have been removed Public consultation is now open (until 25th June) 17

Main improvements New definitions: – Auction Administrator, Contestation Period, Intraday Product, Offered Capacity and Rules for Capacity Allocation by Explicit Auctions Cancellation of some definitions due to: IFE rules v4.0 perimeter: Monthly Product, Resale Notification, Reseller definitions, Secondary Market Operator, Secondary PTR markets, Transfer Notification and Transferor definitions, PTR Holder and PTR Transfer. Text improvements and clarifications: CNE and CRE, Ministerio de Industria, Turismo y Comercio, Ministerial Order, Beneficiary, Force Majeure and Reduction Coefficient. 18

Main modifications To cover the new rule’s perimeter (only daily and intraday timeframes) – Art 1.02, 1.03, 2.03, 2.06, 4.01, 4.04, 6.03, 7.01 and 7.02 Improvement and clarifications on the text on: – Bank Guarantee nature, amount, modification and invocation (art. 3.02) – Entitlement conditions (art. 3.04) – Suspension and withdrawal of Entitlement process (art. 3.05) – Other general text improvements 19

Main modifications Articles no longer needed in IFE rules v4.0 – Article 2.07: As firmness of exchange programs is covered in local contracts / regulation – Section VI on Secondary PTR Market, as is dealt in HAR rules – Articles 7.01 and 7.04 (to cover only daily/intraday timeframes) Articles updated due to new terms: – Auction Administrator (art. 1.05, 2.02, 3.02, 3.04, 4.02, 6.02, ) – Offered Capacities (art. 2.04) New article 9.04 on Intellectual property. Improved description on Payment conditions and Payment Incident (art. 7.02) Resale and Compensations concepts (art. 7.01) were eliminated 20

Appendixes updates Appendix 1: Minor modifications Appendix 2: Now covers both TSOs. New conditions for Bank Guarantees. New model of letter of invocation of Bank Guarantee. New Appendix 3 on Downgraded Mode : modifications to cover only daily and intraday timeframes. Appendix 4: contact details updated. New Appendix 5: new appendix for listing the functions of Auction Administrator and their splitting between TSOs. Old Appendices 3, 5, 6, 7 from IFE Rules v3.0 have been deleted 21

OPEN DISCUSSION 22