1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

The ATLAS Pixel Detector
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Test of Pixel Sensors for the CMS experiment Amitava Roy Purdue University.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
November 3-8, 2002D. Bortoletto - Vertex Silicon Sensors for CMS Daniela Bortoletto Purdue University Grad students: Kim Giolo, Amit Roy, Seunghee.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Si Pixel Tracking Detectors Introduction Sensor Readout Chip Mechanical Issues Performance -Diamond.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
8/22/01Marina Artuso - Pixel Sensor Meeting - Aug Sensor R&D at Syracuse University Marina Artuso Chaouki Boulahouache Brian Gantz Paul Gelling.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
FPIX_flip_chip_test module calibration tests November 14 th 2012.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
1 G. Pellegrini The 9th LC-Spain meeting 8th "Trento" Workshop on Advanced Silicon Radiation Detectors 3D Double-Sided sensors for the CMS phase-2 vertex.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
3D-FBK pixel sensors with CMS readout: first tests results M. Obertino, A. Solano, A. Vilela Pereira, E. Alagoz, J. Andresen, K. Arndt, G. Bolla, D. Bortoletto,
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Sensor Choice The story here is surely damage – See that silicon worked well in the PLT test until we shifted the timing to optimize diamond Reducing BX.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.
The BTeV Pixel Detector David Christian Fermilab June 17, 2010.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Technology Overview or Challenges of Future High Energy Particle Detection Tomasz Hemperek
Report on CMS 3D sensor tests Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
Forward Pixel Beamtest Analysis Carsten Rott Purdue University Januar 24, 2001.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
IEEE October 16-22, 2004 First Look at the Beam Test Results of the FPIX2 Readout Chip for the BTeV Silicon Pixel Detector First Look at the Beam Test.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
May 14, 2001C.Rott1 The CMS Forward Pixel Detector Carsten Rott Purdue University May 14, 2001.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
3D sensors for tracking detectors: present and future applications C. Gemme (INFN Genova) Vertex 2013, Lake Starnberg, Germany, September 2013 Outline:
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
An Overview of the FPIX Detector Upgrade – CMS Experiment
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Preliminary results from 3D CMS Pixel Detectors
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Niels Tuning (Outer Tracker Group LHCb)
Beam Test Results for the CMS Forward Pixel Detector
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007

2 CMS Detector

3 Tracker 3 Barrel Pixel Layers, 2 Forward Pixel Disks The design guarantee 3 pixel hits, up to a |η| = 2.5, that are used for three main purposes: seeds used for pattern recognition in all tracker improve the vertex resolution near the IP fast tracking and vertexing in the High Level Trigger using only the pixel info

4 BPIX 3 barrel layers at 4.4, 7.3, 10.4 cm 672 modules and 96 half modules ROCs (48 million pixels) FPIX 4 disks at ±35.5 ±46.5 cm 672 modules in 96 blades 4320 ROCs (18 million pixels) Pixel Detector 52 cm ~1 m The inner modules will absorb 3x10 14 n eq /cm 2 /yr at a luminosity of cm -2 s -1 ! ~40 cm

5 12 time stamp buffers 32 data buffers double column interface pixel unit cell Readout organized in 26 double columns of 2x80 pixel cells 0.25µm IBM CMOS rad hard technology 100x150 µm pixel cell size which provide a spatial resolution of ~10µm in rφ and ~20µm in z 52x80 cells organized in double columns 32 data and 12 time stamp buffers Data are encoded on 6 analog levels Pixel Read-out Chip

6 BPIX Sensors use p-spray isolation and they are all in hand from CIS They are bump bonded to the ROCs in house at PSI using indium FPIX Sensors use partially open p-stop isolation and they are all in hand from Sintef They are bump bonded to the ROCs at two different vendors, RTI and IZM using PbSn n on n Sensors

7 Charge Collection in Irradiated Devices Extensive studies have been done in the past years to guarantee high efficiencies for highly irradiated detector. The track detection efficiency was measured for both technologies. After a fluence of 8×10 14 neq/cm 2, above the goal of the CMS TDR, the detection efficiency is > 99% both for BPIX and FPIX. FPIX testbeam 2006 No evident loss in detection efficiency Some enhanced charge loss when compared with non irradiated devices Some asymmetry between row and column sharing

8 Module and Panel Two different types of BPIX modules: full module (16 ROCs) half module (8 ROCs) Five different types of FPIX modules with 2,5,6,8,10 ROCs. Modules mounted on two different types of panel: 4 modules panel 3 modules panel

9 Module Testing To obtain the expected performances of the pixel detector it is necessary to test the modules in every phase of the assembly. To this extent the noise of the pixel must be evaluated, together with several other parameters that influence the performance of the detector, such as the value of the break-down voltage or the percentage of broken bump-bond contacts Modules are assembled and quickly tested at Purdue University at a production rate of 6 modules/day They are shipped to FNAL and when they arrive, are visually inspected. The modules then undergo a two-day thermal cycling process consisting of ten cycles between +20 and -15 °C Burnin box Shelves to load modules and bare panels

10 Module Testing Since the detector will operate at cold temperatures, to minimize the effects of radiation damage, plaquettes and panels undergo detailed characterization at -15ºC. To cope with the production rate four test stations have been fully equipped and they are enough to keep up with the required rate. Chiller Temp controller Cold box

11 Module Testing Panels are mounted on the half disks The two half disks are then mounted in the half service cylinder to be tested with the final DAQ electronics, before being shipped to CERN

12 FPIX Production Outlook Our plaquette production target is to be done by the end of August. The extrapolation seems to be still valid!

13 BPIX Production Status: 12 Jun 2007 Needed for the 3 layers : 672 full modules + 96 half modules Prod. status (good modules): 573 full modules + 73 half modules (~80% completed) Production rate: 4 full modules/day + 2 half modules/day or 6 full modules/day

14 BPIX Production Modules are stored in dry boxes ready to be mounted on the carbon fiber support structure

15 Part Delivery at CERN 50% (4 half disks) of the FPIX detector has been delivered at CERN. The last two half disks will be delivered in November. The barrel will be assembled at PSI and then shipped to CERN in one piece at the end of January. Cold box where the half disks can be tested at low temperature Dry box for half disks storage at CERN

16 Noise Measurements on Delivered Parts Once the half disks are inserted in the cold box and connected to the electronic they undergo a series of tests to make sure that are still working properly. Noise measured at FNAL at +15°C  ~1.8 ADC Noise measured at CERN at -10°C  ~1.7 ADC

17 4R panel3R panel Source Test of Pilot Run Detector We also have the capability of using a radioactive source to test the functionality of all data acquisition in running mode. This has been an important exercise to debug all the components making sure that everything is working properly.

18 Installation Test Mockup half disks in a real half-cylinder Mockup of Barrel and Barrel half-cylinder Mockup of center rail (real one is in the tracker) Real beam pipe supports and beam pipe (except the beryllium center section) Beam Pipe Installation rails BPIX FPIX Clearance of FPIX from beam pipe/support and BPIX was verified Motion of FPIX along tracks was verified Survey group verified feasibility to survey fiducial marks using photogrammetry

19 Conclusions Sensors and ROCs perform as expected after high doses of radiation The pixel production is running smoothly. To achieve the best quality, extensive tests are performed at every stage of assembly The CMS pixel project is on schedule and there are no major problems In the next two months we will have two other important tests:  integration of the pilot run detector with the silicon strip tracker  test in a 4T magnetic field at Fermilab of a fully FPIX instrumented sector If we will not have major surprises from these two tests the BPIX and FPIX will be ready early next year. We are planning to install the full detector for the TeV x 7TeV physics run!