CLIC Parameters and Design Work 2012-2016 D.S. 4.11.2011.

Slides:



Advertisements
Similar presentations
ASTeC Linear Collider Activities Susan Smith. ASTeC Aims To contribute to LC accelerator R&D, positioning the UK to take a lead in delivery of significant.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker KEK-DESY meeting 7 th March 2005.
PARTICIPATION IN THE DESIGN AND R&D ACTIVITIES FOR A FUTURE LINEAR COLLIDER: A. Faus-Golfe IFIC - Valencia Accelerator and Detector aspects FPA
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Accelerator activities Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - Orsay 11/13.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
A. Yamamoto, N. Walker, and M. Ross, ILC-GDE Project Managers S. Stapnes, CERN LC Studies Leader LCWS12 - Opening Accelerator Plenary, , 18:00.
Beam Physics Work D.S List of Workpackages Area packages Main beam electron source (Steffen Doebert) Main beam positron source (Steffen.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
WP: Parameters and design. Plans from IFIC, Valencia Javier Resta López on behalf of the IFIC accelerator group ( IFIC (CSIC-UV),
Workshop Goals Marc Ross LC May, 2013 Accelerator Plenary.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Simulations Group Summary K. Kubo, D. Schulte, N. Solyak for the beam dynamics working group.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
CLIC Beam Physics Working Group D. Schulte
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
Working group on Damping rings, ATF and CESRTA October 20 th, 2010 S. Guiducci (INFN/LNF), M. Palmer (Cornell), Y. Papaphilippou (CERN), J. Urakawa (KEK/ATF)
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
Erik Adli 1 Nordu- CLIC CLIC activities at the University of Oslo, Norway The Oslo group Erik Adli, Reidar L. Lillestøl, Kyrre N. Sjøbæk Department of.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
University of Oslo and CLIC Short overview for first “NorduCLIC” meeting Erik Adli and Steinar Stapnes, University of Oslo May 19, 2008.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement LOW-ε-RING network:
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
Introduction D. Schulte for K. Kubo and P. Tenenbaum.
Accelerator Physics Topics REPORT Philip Bambade LAL-Orsay LCWS 2005 Stanford, 22 March 2005.
Summary of XFEL uses for CALIFES Erik Adli (University of Oslo, Norway)
Main and Drive Beam Dynamics Working Group Caterina Biscari, Daniel Schulte Attending people ~ 20 ± 5 Presentations ~ 18 (7 from CERN) CL IC 07.
Some Remarks on EUROTeV D. Schulte. EUROTeV Introduction EUROTeV includes technology independent aspects of ILC and CLIC –Instrumentation –Beam dynamics.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Beam Physics News D. S. for the beam physics team June 1 rst, 2011.
1 RTML Emittance Measurement Station Yuri Kubyshin (1), Robert Apsimon (2), Hector García (1,2) (1) Technical University of Catalonia (UPC) (2) CERN CLIC.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
1 R&D Plans for Impedance Driven Single-Bunch Instabilities (WBS 2.2.1) M. Venturini ( presented by M. Zisman) LBNL LCWS07 DESY, Hamburg May 30 - June.
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
The Cockroft Institute
CALIFES A proposed electron beam test facility at CERN
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
CLIC work program and milestones
Contribution of Ankara University Accelerator Technology Institute
Conventional Facilities and Siting Global Group (ARCFS)
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
M.Jonker CTC MPO-WG status
What Should We Do?.
Technical Design Report preparation
ILC/CLIC e+ generation working group
Accelerator Physics Technical System Group Review
Summary for the Sources working group
Presentation transcript:

CLIC Parameters and Design Work D.S

List of Workpackages Area packages Main beam electron source (Steffen Doebert) Main beam positron source (Steffen Doebert, interim) Damping rings (Yannis Papaphilippou) RTML: ring to main linac transport (Andrea Latina) Two-beam acceleration (D.S. interim) BDS: beam delivery system (Rogelio Tomas) MDI: machine detector interface (Lau Gatignon) Drive beam complex (Bernard Jeanneret) Integrating packages Integrated design (D.S.) Simulations and integrated studies (Andrea Latina) Feedback design (D.S., interim) Machine protection and operation (Michael Jonker) Background (D.S., interim) Polarisation (?)

Observations Very active collaboration 24 presentations, some for more than one institute I had guessed forms filled in But not matched one to one At least one is still flying around Continuation of existing collaborations on many topics New collaborations on many topics Resources are mostly uncertain

Existing Forms Department of Physics and Astronomy, Aarhus UniversityUlrik I. Uggerhøj BCKG Australian Collaboration for Accelerator Science (ACAS)M. Boland, R. Rassool DR Ankara University; Uludag University; İ. Baysal Un. A. Kenan Çiftçi (A.Un.) and İlhan Tapan (U.Un.) BCKG Ankara University, Accelerator Technology InstituteProf. Dr. Ömer Yavaş DRV, BCKG Ankara UniversityA. Kenan Ciftci (A. Un.) RTML Budker Institute of PhysicsE. Levichev, K. Zolotarev DR Cornell University (CESRTA)M. Palmer DR Valencia, IFICAngeles Faus-Golfe BDS Valencia, IFIC (Coll: CIEMAT, CERN)Angeles Faus-Golfe DR Valencia, IFICAngeles Faus-Golfe RTML Valencia, IFICAngeles Faus-Golfe SIM IHEPProf. Jie GAO for IHEP BASE? Form for ANKA is not yet included

Existing Forms INFN-LNF - CLIC Resp. A.GhigoM.Biagini DR INFN-LNF - CLIC Resp. A.GhigoC.Biscari DRV INFN-LNF - CLIC Resp. A.GhigoC.Biscari RTML John Adams Institute (Oxford Un.), DIAMONDR. Bartolini DR John Adams Institute, Oxford UniversityPhilip Burrows MDI, LUMI LALPhilip Bambade BDS LAPP-IN2P3/CNRS-Université de SavoieAndrea JEREMIE LUMI/CTC Department of Physics, University of Oslo (UiO) / NorduCLICErik Adli, Steinar Stapnes ML PSI, INFN/LNF M. Biagini (INFN-LNF), M. Boege, A. Streun (PSI-SLS) DR RHULG. Blair BDS SYMME Université de Savoie (formerly ESIA)Bernard Caron LUMI Uludag Universityİlhan Tapan (U.Un.) PSRC UPC - Universitat Politècnica de Catalunya (Technical University of Catalonia)Yuri Kubyshin RTML/BDS

Other Presentations DESY collaboration Sabine Riemann, Jenny List SLAC collaboration Mauro Pivi LAL will not be able to continue positron source work A. Variola Additional contributions B. Dalena, S. Wagner

Observations We have collaborations that do not fit easily into a formal scheme E.g. collaboration on generic R&D or code benchmarking E.g. collaboration with ILC/EU-funded projects and some institutes E.g. private volunteer contribution (in spare time) These are often very valuable But have sometimes have to think how to include them in this formal process Some may just fly under the radar

Observations Total of resources requested according to forms is high If all contributions would appear we would have O(40) FTE Of which O(10) would be at CERN But almost all are requests only Need to check for correctness of numbers Not for all forms resources are given

Observations A number of collaborations have well defined plans In some cases the mapping onto workpackages remains to be done E.g. laser wire integration in RTML and BDS E.g. Ankara University contribution to background/feedback In some cases the topics still need to be defined in detail Mainly for new contributions There is some potential overlap between contributions But not everything is covered (including the CERN estimate)

Observations Many PhD students E.g. 14 students from Ankara University, Uludag University and İ. Baysal University With supervision in the home institute But need to identify good PhD topics Need to identify link at CERN Maybe a bit short on experienced staff and post-docs But most resources are uncertain

Next Steps We value all collaborations and will continue and foster them Even if we cannot fill them into a form We will try to attract additional contributions Continuing process We will try to formalise collaborations to make them stable

Next Steps Fix some issues with the forms Some need to be split into more than one For some the attribution to a workpackage needs to be reviewed With collaborators and concerned workpackage coordinators Fill in best estimates for all resources Sometimes just question marks Some contributions may depend on our help E.g. shared students, stay of students at CERN This should be done as soon as possible (before ) Some things already were mentioned during the session yesterday

Next Steps Complete definition of contributions in workpackages Small (phone) meetings of concerned collaborators and workpackages coordinator(s) To be initiated by workpackage coordinators Understand and define the contributions in more detail E.g. define list of thesis topics for PhD students Review adequacy of resources types/estimates Identify overlap between different collaborators and find a solution – Especially what to do if contributions are uncertain? Identify uncovered tasks – Very difficult given uncertainties of contributions This may lead to some modifications of the technical content of the forms

Next Steps Include CERN groups (by end of the year) Based on uncovered topics To ensure links are provided Need to make priorities soon (January) Verify the existence of other workpackages that you need for your workpackage E.g. hardware items, tests, etc. Has been done to some extent, but please check Will have to iterate we will use a lean management, i.e. a “feedback based approach”

Conclusion Very impressive interest in collaboration Very many excellent proposals Most resources are currently uncertain Need also to specify type of resource for each task in more detail Will have to update workplan until resource situation is more clear