Design Goals Saturn V Ariane 4 Pegasus Vanguard Bellerophon ? ? ?

Slides:



Advertisements
Similar presentations
Approved for Public Release; Distribution Unlimited The Falcon Launch Vehicle: Towards Operationally Responsive Space Space Exploration Technologies 1310.
Advertisements

Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
Space Camp/Academy Huntsville, AL S.T.S. – The Space Shuttle –Orbiters –Space Shuttle Main Engines –External Tank –Solid Rocket Boosters.
Ares V RFI Point of Departure Information Package
AAE 450 Spring Brandon White 3/20/2008 Structures Group Contact Inert Mass Standard Deviation Justification Other Work.
Mission Design Requirements First priority is to deliver takeoff mass to aircraft team. Deliver 5kg item to ISS 24 hour launch lead time Vehicle must be.
Launch Vehicles. LAUNCH SYSTEM CONCEPTS SHROUD PROTECTS THE SPACECRAFT SHROUD PROTECTS THE SPACECRAFT MAIN VEHICLE PRIMARY LIQUID OR SOLID ROCKET PROPELLANT.
Architecture Team Industry Day Briefing 17 January, 2002.
1 Air Launch System Project Proposal February 11, 2008 Dan Poniatowski (Team Lead) Matt Campbell Dan Cipera Pierre Dumas Boris Kaganovich Jason LaDoucer.
NASA SLI 2010 Mulberry Grove High School Flight Readiness Review Measurement of UVB Radiation Absorption by Cloth Material at Different Altitudes and Measurement.
AAE450 Spring 2009 Propellant Choice and Mass Estimates for the Translunar OTV Week 2 Presentation Thursday, Jan 22, 2009 Brad Appel Propulsion Group.
AAE450 Spring 2009 Lander Phase: Hybrid Propulsion System Propulsion System Sizing and Inert Mass Analysis Hopper and Rover Designs for 10kg Payload Hopper.
David Childers March 27, 2008 Final Slides for: Center of Mass Structures Costs AAE 450 Spring 2008.
AAE 450 Spring 2008 Danielle Yaple 7 February 2008 Avionics Group, GC, CAD, MAT Model Analysis Trios Combined Code 1.
AAE450 Spring 2009 Lunar Lander Preliminary propulsion system selection and design analysis Thursday, January 22, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Translunar OTV (Orbital Transfer Vehicle) : Chemical Propulsion System Refined estimates: OTV WET Mass, Propellant Volume & Propellant.
Spacecraft Propulsion Dr Andrew Ketsdever Lesson 13 MAE 5595.
Project M.E.T.E.O.R. P07109: Flying Rocket Team Andrew Scarlata, Geoff Cassell, Zack Mott, Garett Pickett, Brian Whitbeck, Luke Cadin, David Hall.
Rocket Power Introduction to Rockets and Missiles Scott Schoneman.
Bellerophon 1kg Exploded View Sarah Shoemaker. Spin Table 3 rd Stage Engine 2 nd Stage Avionics 2 nd Stage Engine 2 nd Stage Propellant Tank 2 nd Stage.
Preliminary Rocket Design Objectives: 1. Comprehend a preliminary sizing example for a rocket 2. Explain basic trade-offs in rocket design.
Rockets 101 AIAA – March 2009 Theory of Rockets Dr. Eric Besnard California State University, Long Beach Project Director, California Launch Vehicle Education.
AAE 450 Spring 2008 Chris Strauss Aerothermodynamics-Rocket Geometry Scaling Vanguard.
P07109: Project M.E.T.E.O.R. Flying Rocket Team Andrew ScarlataProject Leader/ Mechanical Engineer Geoff CassellLead Engineer/ Mechanical Engineer David.
A Comparison of Nuclear Thermal to Nuclear Electric Propulsion for Interplanetary Missions Mike Osenar Mentor: LtCol Lawrence.
AAE 450 Spring 2008 Ricky Hinton March 27 th, 2008 Propulsion Group Nozzle, Test Facility (back-up slides)
1 AAE 450 Spring 2008 Stephen Bluestone March 20, 2008 Propulsion Final Presentation Slides 1.
Launch System Launch Vehicle Launch Complex Orbit Insertion Orbit Maneuvers.
AAE 450 Spring 2008 Stephanie Morris 3/27/08 Propulsion Final Slides.
Chapter 24 Space Vehicular Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Ryan Mayes Duarte Ho Jason Laing Bryan Giglio. Requirements  Overall: Launch 10,000 mt of cargo (including crew vehicle) per year Work with a $5M fixed.
 Expand upon knowledge base developed from Panther 1 solid rocket launch (6/28/06)  Enhance relationship and training opportunities between Florida.
Team PM8 Eventus Slide 1. Commercial spaceflight has seen increased activity as more privately owned companies invest in the venture. To avoid a catastrophic.
AAE 450 Spring 2008 William Yeong Liang Ling 1/31/2008 Propulsion Cost Model of Balloon and Aircraft Assisted Launch Credit to Stephanie Morris, Jerald.
AAE 450- Propulsion LV Stephen Hanna Critical Design Review 02/27/01.
AAE 450 Spring 2008 Stephen Bluestone February 28, 2008 Propulsion Group Historic Solid Rocket Failure Probability.
AAE 450 Spring 2008 Danielle Yaple 6 March 2008 Avionics Group, GC, CAD, MAT Final Slides 1.
AAE450 Spring 2009 Lunar Lander Main Engine Thaddaeus Halsmer Thursday, February 12, 2009 Thaddaeus Halsmer, Propulsion.
NOON UNO HIGH-MOBILITY MARS EXPLORATION SYSTEM DANIEL MCCAFFERY JEFF ROBINSON KYLE SMITH JASON TANG BRAD THOMPSON.
Structural Practices Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Structural Design Practices Payload interfaces to launch vehicles.
1 AAE 450 Spring 2008 Jerald A. Balta February 21, 2008 Propulsion Team / Cad Cost Modifier – Launch Site.
What Makes Up the Space Shuttle? The space shuttle is the most complex machine ever created by human beings. The first shuttle was launched on April 12,
TESLA Rocket Project Lecture #3 10/28/15
AAE 450 Spring 2008 Propulsion Back-Up Slides Propulsion.
AAE 450 Spring 2008 Steven (“CJ”) Hiu 03/27/2008 “Thank You For The Memories” MAT & FAM Coder – Structures Composite Tanks Analysis CAD – Tanks, Intertank.
Solid Rocket Motors A solid rocket motor is a system that uses solid propellants to produce thrust Advantages High thrust Simple Storability High density.
AAE 450 Spring 2008 Stephanie Morris 3/6/08 Propulsion Final Propellant and Pressurant Cost Thanks to Nicole Wilcox!
Final Version Gary Davis Robert Estes Scott Glubke Propulsion May 13-17, 2002 Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
Project Bellerophon0 Backup Slides. Project Bellerophon1 Trajectory - Steering Law Function of time Defines the orientation of the launch vehicle bb
AAE 450 Spring 2008 Molly Kane March 20, 2008 Structures Group Inert Masses, Dimensions, Buckling Analysis, Skirt Analysis, Materials Selection.
AAE 450 Spring 2008 Stephanie Morris 2/21/08 Propulsion Standard Deviations.
AAE 450 Spring 2008 Trajectory Code Validation Slides 04/12/08.
AAE 450 Spring 2008 William Yeong Liang Ling 2/14/2008 Propulsion The effect and trends of launch type on launch costs (Model Analysis) Credit to all code.
AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen
Propulsion Economic Considerations for Next Generation Space Launch by Chris Y. Taylor 40th AIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit.
How Astronauts Got Launched to the Moon Created by: Luke Sharman.
Preliminary Design Review Presentation
PROJECT PROPOSAL.
Stephan Shurn 28 February 2008 Propulsion Thrust Vector Control
Development and Principles of Rocketry
In-situ Propellant Production and ERV Propulsion System
Nicole Bryan Avionics Final Presentation Slides
Ricky Hinton January 24th, 2008 Propulsion Group Preliminary Analysis of Purdue Test Facilities at Zucrow Laboratories AAE 450 Spring 2008.
Junichi (Jun) Kanehara 03/06/2008 Trajectory The Winner of the Balloon, 5[kg] case (LB-HA-DA-DA_v125) & New Version of Trajectory 3-D Plots AAE 450 Spring.
Brandon White 3/20/2008 Structures Group Contact Inert Mass Standard Deviation Justification Other Work AAE 450 Spring 2008.
Derivation of the FSOA in Ariane 6 Specifications
Vice President, Business Development
DESIGN OF THE ARIES IV TRIBRID LIQUID PROPELLANT ROCKET ENGINE
Stephan Shurn 20 March 2008 Propulsion Final Slides Rail Guns and LITVC AAE 450 Spring 2008.
Sarah Shoemaker 3/20/2008 Structures, Gondola Design, Tanks, CAD Final Slides AAE 450 Spring 2008 Structures.
Presentation transcript:

Final Design Presentation PROJECT BELLEROPHON Final Design Presentation Greek hero who rode Pegasus HERO BELLEROPHON (buh-lair'-uh-fahn) Project Bellerophon

Design Goals Saturn V Ariane 4 Pegasus Vanguard Bellerophon ? ? ? r = 50 m 102 m ? ? ? Saturn V 118,000 kg $2.7 billion Ariane 4 5,000 kg $105 million Pegasus 375 kg $16 million Vanguard 9 kg $11 million Bellerophon 200 g, 1kg, 5kg $??? Payload: Cost: Project Bellerophon

Design Requirements Perigee of 300 km Probability of success : 90.00% ( with catastrophic failure) Perigee Probability of success : 99.86% ( without catastrophic failure) All possible propellants, material and launch methods should be considered $ Minimize Cost $ Project Bellerophon

Things We Ignored FAA Decree Physics not Politics Development costs Pre-Application Consult Environmental Review Payload Review Hazard Analysis Financial Responsibility System Failure Modes Safety Review Physics not Politics Development costs 12 launches/year Compliance Monitoring Final Approval Project Bellerophon

20,480 possible combinations for each payload! Preliminary Analysis Materials Aluminum Composite Steel Titanium Launch Methods Ground Aircraft Balloon Railgun Conventional Gun Propellants Cyrogenic LOX / LH2 H2O2 / RP-1 Storable H2O2 / HTPB Hybrid AP / Al / HTPB Solid 5,616 20,480 possible combinations for each payload! Project Bellerophon

5,616 possible combinations for each payload! Model Analysis Payload / Launch Description Staging Details • Hybrid Prop • Titanium MA - SS - DA - HT Stage 1 Stage 2 Stage 3 • Medium Payload (1 kg) • Aircraft Launch • Solid Prop • Aluminum • Storable Prop • Steel 3 5,616 possible combinations for each payload! Project Bellerophon

Final Design Launch Vehicle Propulsion Rough Vehicle Subsystems r = 50 m Launch Vehicle Propulsion Inert Mass Rough Vehicle Subsystems Requirements Trajectory Final Vehicle Refined Vehicle Aerothermal Avionics D & C Propulsion Structures Trajectory Project Bellerophon

Designing a Trajectory Can the vehicle make it into orbit? What is the best path to take to get there? Answering these questions for all launch configurations Optimization was done by varying the orientation of the launch vehicle at the end of each stage of launch Nominal Trajectory - 1 kg Payload Project Bellerophon

Nominal Trajectory Project Bellerophon

D&C Controlled Trajectory Project Bellerophon

Vehicle ready for Monte Carlo Final Design r = 50 m Launch Vehicle Propulsion Inert Mass Rough Vehicle Subsystems Requirements Trajectory Final Vehicle Refined Vehicle Aerothermal Avionics D & C Propulsion Structures Trajectory Vehicle ready for Monte Carlo Controlled Trajectory D & C Nominal Trajectory Project Bellerophon

Accounting for Errors Monte Carlo Analysis 1kg Launch Vehicle: Perigee Altitude Histogram Standard Dev = 16 km Mean = 368 km Requirement Perigee > 300 km Perigee (km) Ideal Vehicle Manufacturing Uncertainties + = Actual Vehicle D&C Monte Carlo Simulator Computes perigee minert mprop m . Frequency Perigee (km) 10,000 Xs Project Bellerophon

1 kg Failure Low on gas Heavy Poor engine performance Project Bellerophon

Monte Carlo Trajectories Project Bellerophon

Monte Carlo Analysis Results 99.99% 100.00% Success Rate Project Bellerophon

Final Vehicle Specifics Payload Mass [kg] Vehicle GLOM [kg] V [m/s] Controlled Perigee [km] 0.2 2,580 11,900 486 1.0 1,750 9,890 367 5.0 6,290 10,150 513 Payload: 200 g Length: 10.18 m Diameter: 1.29 m Payload: 1 kg Length: 8.65 m Diameter: 1.13 m Payload: 5 kg Length: 14.25 m Diameter: 1.84 m Project Bellerophon

Tour of Vehicle 1 kg payload Helium Balloon Gondola Launch Vehicle Project Bellerophon

Tour of Vehicle 1 kg payload Stage 3 Stage 2 Stage 1 9 m Project Bellerophon

Tour of Vehicle 1 kg payload Stage 3 Nose Cone (Al / Ti) Payload (1.64% of mstage3) Propellant (AP / Al / HTPB) Spin Table 3rd Stage Nozzle mstage3 is 4% of GLOM Project Bellerophon

Tour of Vehicle 1 kg payload Stage 2 Inter-stage Skirt 2nd Stage Avionics Liquid Injection Thrust Vector Control (LITVC) Tank (H202) mstage2 is 26% of GLOM Project Bellerophon

Tour of Vehicle 1 kg payload Stage 1 Pressurant (N2) Inter-tank Coupler Oxidizer Tank (H202) Fuel Tank (HTPB) mstage1 is 70% of GLOM Project Bellerophon

Tour of Vehicle 1 kg payload Project Bellerophon

Mission Timeline 1 kg payload 2nd Stage Separation h = 257 km T+ = 320.0 s Nose Cone Jettison h = 90.00 km 3rd Stage Separation h = 381 km T+ = 515.3 s 1st Stage Separation h = 87.4 km T+ = 140.8 s Launch h = 30 km T+ = 0s 1 hr 35 min balloon ascent + 8 min 35 sec launch vehicle ascent = 1.7 hour total mission Project Bellerophon

Catastrophic Risk Historical Analysis Item Failure Rate Success Rate Stage 1 Propellants 2.08% 97.92% Stage 2 Propellants 1.44% 98.56% Stage 3 Propellants Stage / Payload Separation 0.23% 99.77% Nose Cone Jettison 0.28% 99.72% Electrical 0.43% 99.57% Avionics Total 6.16% 93.84% Project Bellerophon

Catastrophic Risk Historical Analysis Pegasus Number of Launches Success Rate for Past 10 10 60.00% 20 80.00% 30 100.00% Number of Launches Success Rate ≤ 12 60.00% ≤ 24 80.00% > 24 93.84% Project Bellerophon

Cost Model Can we use existing prices from large launch vehicles to help find ours? Payload Mass [kg] Total Vehicle Cost 0.2 $35,000 1.0 $100,000 5.0 $300,000 Project Bellerophon

Cost Model Build and launch cost includes: - Material - Engine - Handling - Labor - Propellant - Avionics - Tank - Balloon - Gondola Payload: 200 g $ 3.6 M Payload: 1 kg $ 3.2 M Payload: 5 kg $ 4.7 M Project Bellerophon

Conclusions Small launch vehicle price : $ 4M High altitude launch is a necessity Need to optimize trajectory and D&C Space grade avionics are too expensive Engines and tanks do not scale simply Prices are difficult to assess Small launch vehicle price : $ 4M Project Bellerophon

Meet the Team Project Bellerophon