Distribution Automation Plans in AEP Texas. Overview AEP Texas is deploying smart meters to roughly 1,000,000 customers The meters utilize Landis + Gyr.

Slides:



Advertisements
Similar presentations
LOGO Safety Through Prevention – Safe Switching Using Smart Key Technology Shuqiang Jin, Unitech, Zhuhai, China Nan Liu Youru Huang, SERCC EPRI's 14th.
Advertisements

1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
© Southwest Electrical Distribution Exchange (SWEDE) May 2, 2008 Materials and Equipment John Macek Application Director, S&C Electric.
Distributed Intelligence Provides Self-Healing for the Grid
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
Applications of Wireless Sensor Networks in Smart Grid Presented by Zhongming Zheng.
Workforce & Engineering Design Optimization Plenary Session: Enterprise Resource Planning for Infrastructure and Utilities Gurgaon India Feb GIS.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Page 1Smart Grid Research Consortium – October 20-21, 2011 Distribution Automation Technical Background & Current Trends Dan Murray Siemens Energy, Inc.
Spencer Murray, Sr. Telecom Eng. Distribution Automation.
Megger - Substation overview product groups, 2600 products.
Smart battery technology for a global environment Louie Lane #104 Reno, Nevada
Keeping your Automated Devices Alive
Data trapped in billions of devices Devices often in hard-to-reach locations - basements. below ground, pad mounts Interference is increasing and poses.
1 Distribution Automation Survey Presented at SWEDE Conference 2005 By Kevin Clark.
DUCK RIVER EMC Lockout/Tagout Procedures For Overhead and Underground Line Work (De-energizing Lines and Equipment for Employee Protection)
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
November 2010 GREENER, SAFER, SMARTER Considerations in Building a Smart Grid Communications Network John Eichhorn, CFO.
Business Models and Scaling Up Successes Maintaining Interoperability By Open-Standards Design in The Power Distribution For Smarter Grid Khalid W. Darwish,
1 CREZ COMMUNICATIONS Presented by American Electric Power Telecommunications Engineering Matt WilliamsDon Demand Columbus, OHTulsa, OK.
Smart Grid Research Consortium Conference Communications: Technologies Systems Future Trends Dr Rick Russell.
SOUTHERN CALIFORNIA EDISON® Leading the Way in Electricity -1- CONFIDENTIAL Integrated Critical Communications Infrastructure Wireless WAN Business & Policy.
April 3, 2001 Washington, DC 2001 EMS Users Group.
HARVEST GROUP Smart Grid Harvest Power Technologies 30 th Aug 2014.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
SWEDE 2011 Conference Design-Smart Grid Workshop Presented by Frank Daniel Oncor Electric Delivery.
Power Line Carrier Communication based Automated Meter Reading System
1 Jon Sudduth Project Engineer, Intelligent Grid Deployment SWEDE April 26, 2011.
Experience you can trust. Knowledge2006 – Technology Roundtable Dan Ruiz
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
AEP’s “gridSMART” Project Ohio Roll Out Strategy PUCO Staff Workshop December 13, 2007.
Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe
Frankfurt (Germany), 6-9 June Lars Garpetun – Sweden – Session 6 – 0415 EXPERIENCES FROM OPERATIONS AFTER A FULL- SCALE SMART METERING ROLLOUT REGARDING.
1 AEP’s gridSMART sm Initiative FCC Workshop August 25, 2009 Jason D Griffith Director – IT Telecom Engineering.
Advanced Metering Infrastructure (AMI) Project Update Mark Heintzelman June 2010.
Smart Grid Workforce Education Presentation Smart Grid – A Framework for Change Brad Gaskill, CEO - Poudre Valley REA May 29, 2009.
Oncor Electric Delivery Intelligent Grid at Oncor Electric Delivery SWEDE Conference Alan Bern – SCADA / Automation Manager May 1, 2008.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Utility Engineers, PC.  Generation  Transmission  Distribution.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Consumers Energy Advanced Metering Infrastructure Review and Feedback Utility AMI / Open HAN Meeting August 15, 2007.
Substation Data Integration & Information Exchange Advisor: Dr. Mladen Kezunovic Student: Sasa Jakovljevic Texas A&M University, Department of Electrical.
Metering Americas April 24, 2006 Advanced Metering.
2011 Users Conference Nashville, TN.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
ECE 498HZ: Power Distribution System Analysis
CEPT ECC FM54 SATEL 1. ENERGY SECTOR Smart Grids, DA (Distribution Automation) Need of more functions, more intelligence Increasing amount of information.
Copyright © Central Lincoln PUD and SEL 2015 Communications-Capable Fault Indicators Improve Outage Response for Coastal Oregon Shamus Gamache Central.
Data Enabled Railway July 2015 Railway Suppliers Summer Conference 2015 Steve Warner, EMEAR Head of Data & Analytics.
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Fault Current Indicator (FCI)
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
Microgrid Load Management and Operation Erich Keller G&W Electric Co. Frank Patton Jr., PE N. J. Shaum & Son, Inc.
Advanced Metering Infrastructure (AMI) Australia, Victoria State (DOI) Michael Wu Semitech Innovations Pty Ltd (Australia)
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
Understanding Your Options
Automation Scheme Design– Frank Daniel (Oncor)
Sub Station.
Utility Needs and Smart Grid for Major Storm Events
Unitil Grid Modernization
SWEDE 2011 Conference Design-Smart Grid Workshop Presented by
Presentation transcript:

Distribution Automation Plans in AEP Texas

Overview AEP Texas is deploying smart meters to roughly 1,000,000 customers The meters utilize Landis + Gyr UtiliNet radio technology UtiliNet mesh network requires regular placement of routers on utility poles throughout the system Routers can be used for more than strictly AMI traffic If they’re there, why not use them? Very limited in scale and scope so far

Deployment Total of twelve smart switches deployed so far Installed in sets of three Locations: Two sets in San Angelo, one set in Abilene, and one set in Corpus Up to ten additional locations (30 additional smart switches) may be chosen before the end of They will most likely be deployed in the Rio Grande Valley, Corpus Christi, Laredo, Victoria, Abilene, and/or San Angelo.

Organizational Responsibilities Reliability Engineering: Selects location, performs studies as necessary, program the devices AMI construction group: Installs routers for AMI deployment Information Technology: Creates the links between the UtiliNet system and SCADA Dispatch: Operates and monitors the status of the devices

Switch Specification Using S&C IntelliRupter 15.5kV models to support our mostly 7.2/12.47kV system Interrupting rating: 12500A Continuous current rating: 630A Uses “pulse closing” technique Standard reclosing could be used for fuse saving strategies, but we’ve opted not to use it Ensures less damage to distribution equipment by limiting the amount of energy in a fault

Switch Specification (cont’d) Modular communications Vendor installs Landis + Gyr UtiliNet module SpeedNet and other radios available and possible for future use Communications infrastructure UtiliNet mesh network Very scalable, but not very high bandwidth DA takes much higher priority in signals than AMI Proprietary UtiliNet signals converted at station to DNP3 for SCADA master control device Latency is expected to be measured in seconds as opposed to milliseconds or minutes

Mounting/Installation Switches are mounted on 45 ft, Class 3 or better poles Only overhead installations on wood poles so far No location restrictions beyond engineering judgment Everybody knows of the story of the switch right next to a drainage ditch… AMI routers must generally be installed in an area before DA schemes are installed

Maintenance S&C IntelliRupters have a life span of about 30 years or more Batteries should be replaced on a 5 year cycle Bypass switches are installed on both load and source side Thus far, testing is performed live Modular communications and control module Control module can be accessed via Wi-Fi for programming and to check error logs

AMI Integration Leaning heavily on AMI communications system Communications to the substation shares routers and protocols with AMI system DA gets top priority in communications along mesh At the station, switch signals are translated to DNP3 and sent to the SCADA master control device Switches do not communicate directly with meters UtiliNet mesh latency would be too high for something like this to work

Safety For loop-automation, the “middle” device must be placed into non-reclose mode before work begins A non-reclose order or hot line tag may be used on the source side device as well The S&C IntelliRupter has an interlocking visual open To accommodate contractors/out-of-town crews, dispatchers will let crews know they are on an automated system when they logon

Operations Real-time visual representations of the status of the devices (open/closed/non-reclose/etc) are provided via SCADA Also allows remote control of functions – can be overridden by field using physical levers Non-switch smart nodes (such as intelligent volt-var controls) are not anticipated at this time

Operations (cont’d) Alarm points are used on abnormal switch state Outage tickets are still manually generated by dispatchers Switches can be used to gather outage information, isolate faults, and re-energize the line – similar to breakers using SCADA Due to the limited scope of deployment, switches will only be marginally useful in load estimation and planning functions

Budgeting/Cost Recovery Costs of systems is broadly imbedded in rates until a more timely recovery mechanism is in place Limited scope of projects means no special projects have been created; they are lumped in with general sectionalizing and reliability budgets AMI communication devices (routers) are paid for by smart meter surcharge, and AMI remains their primary function DA is along for the ride!

One Caveat Some of the equipment may not stand up to highly corrosive environments…. Installation was on North Padre Island, only a few months old ALL future installations will use our own external disconnects

Questions?