Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
RF Layout 3pi/2 for Discussion. 2 RF Design mtg 14/1/15 Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of the MICE Amplifier
RF controls for MICE Andrew Moss Sept 06. What we need A flexible easy to use solution to control the amplitude, phase and timing of the MICE RF amplifiers.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Andrew Moss Daresbury Laboratory Collaboration Meeting th -16 th February 2013 Coseners House MICE RF HP System rprogress.
MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
MICE RF – TIARA and General Progress Tim Stanley RAL 5 June 2013.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Electrical & Control Power Supplies Trevor Hartnett.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
RF Review CM37 Andrew Moss. Amplifier results at Daresbury 2MW at 35kV, good efficiency and gain.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE RF – Installation at RAL Tim Stanley, MICE RF Engineer, RAL 2 June 2014.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Andrew Moss STFC, ASTeC Example amplifier control system Example of current STFC copper cavity in operation –Using SF6 insulated waveguide –Conditioning.
RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Areal RF Station A. Vardanyan
Solid State Amplifier Development at PSI
MICE RF System Power Supplies, Control and Monitoring Status report
RF Layout 3pi/2 for Discussion
352MHz Klystron Control for the 3MeV Linac test stand
RF Status 1 4 High Power Amplifier circuits available CERN(2)
Presentation transcript:

Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status

Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss Outline Testing of medium power amplifier Rebuild of large amplifier Testing of large amplifier MICE hall design/implementation Conclusion

Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss Collaboration meeting, RAL, 7 th – 10 th October 2007Andrew Moss 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module LBNL CERN 300 kW Amplifier HT Supplies Daresbury DL Test System The Task for Daresbury RF group

Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss Daresbury Test system

4616 Amplifier Testing Retesting of medium power amplifier system before connection to high power system New PLC control system looks after all power supplies interlocks and local safety – equipment doors etc Old Berkeley 4616 tube still installed and produced – 100kW power quite easily – more possible with time, will test again next week CERN test load will then be disconnected and system connected to power large amplifier Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss

Amplifier rebuild Original 116 amp Refurbished 116 amp Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss

Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss Electrical controls Base of amplifier includes air blowers, cathode switcher, filament PSU and control electronics Electrical systems being tested now RF input ready to be connected up to 4616 amp

Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss Base of amplifier

RF test load 1 megawatt test load installed on stand and piped up to glycol cooling 200kw load being used for 4616 test, needs to be removed before connection can be made Can be moved to RAL for tests in hall Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss

116 amplifier output Problem found with using original HT connection, quick solution was to use part of one of the CERN amplifiers CERN/Berkeley amps are directly compatible in this area Water supplies connect through 40kV HT connection to amplifier valve for cooling -complex arrangement, we can copy it from CERN drawings Water input and return Output match tuning stub Coax 9 inch to 6 inch transition and output Collaboration meeting, RAL, 7 th – 10 th October 2007

Amplifier tuning Tuneable coax sections old Remote control section new Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss

RF Testing Retest of 4616 has been done this week Electrical checks of 116 auxiliary electrical systems underway CERN HT connection used Next week connect up drive coax between 4616 and 116 (with loaned flexible section from RAL linac group) Should have results of testing with RF in December for entire system into load Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss

Hall design Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss 6 inch distribution coax will be used from amplifiers Large phase shifters will be needed 3-4 meter devices hybrid power splitter with a 1MW reject load for each cavity Phase shifters needed to used to correct for phase error at cavity coupler, possible to use limited range probe style phase shifters Rotary joints before cavity inputs to allow disconnection of cavity/testing into load Nitrogen pressure in coax to help prevent breakdown and provide interlock for coax guide complete

Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss Amplifier to cavity installation 1

Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss Amplifier to cavity installation 2

Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss Coax components 4 1MW loads needed for each RFCC installation 1 RF trombone for Berkeley amp ~ Big! 2 RF trombones for CERN amp 3 meters long

Hall implementation RF coax has to be this big to stand off the voltages inside Design of layout of coax and components will be started very soon Need to develop CAD models to see how it will all fit under the floor Search to find smaller devices, need to liaise with manufactures and perhaps test at DL to check operation Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss

Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss Plan Test 116 amplifier Design hall coax in detail and work out how to fit it all in space for steps 5 and 6 Assemble CERN amplifier and test with current power supplies Autumn 2010 move first amplifier system to MICE hall and install

CERN amplifier awaiting assembly Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss

Collaboration meeting, RAL, 7 th – 10 th October 2007 Andrew Moss Conclusion Large amplifier ready and will re-commission to 1MW using old tubes Will run for as long as possible to develop understanding and look for weak points CERN amplifiers on site awaiting build Hall layout needs careful work search for smaller key coax component’s if possible Two new TH116 tubes have been delivered to DL, two more due soon