SPECTRAP - GSI progress report and status overview.

Slides:



Advertisements
Similar presentations
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Advertisements

LINAC3 INSTRUMENTATION STATUS F.Roncarolo – 18 Feb 2015 F.Roncarolo 18 Feb
Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
End of 2007 SPECTRAP’ is being built in London to trap Ca+ ions with real imaging capabilities Early RF operation expected Jan 2008 Penning operation Feb/Mar.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Spectrap Electronics Stefan Stahl measurements by Stefan Stahl & Zoran Angelkovic Latest result of commissioning and tests.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Progress and Plan for Superconducting RF Cavity RF Group.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
M. Vogel SPECTRAP status. Manuel VogelGSI X SPECTRAP.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Testing the Penning trap (operated as a Paul trap)
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Status of the SPECTRAP project HITRAP meeting 27 September 2007 by Danyal Winters.
Zoran Andjelkovic Johannes Gutenberg – Mainz University GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
SPEC(troscopy) -Trap Outline of talk Introduction – motivation for two cross continent traps Imperial College Group – areas of interest and expertise SPECTRAP/SPECTRAP’
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
Zoran Andjelkovic Johannes Gutenberg – Mainz University GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Zoran Andjelkovic Johannes Gutenberg Universität Mainz GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
DARK SIDE OF THE LIGHT Ing. Karolina Macúchová Supervisor: doc. Ing. J. Zicha, CSc. Konference Studentské tvůrčí činnosti 2013Dark Side of the Light.
HD target.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Simulations and tests for PIPERADE P. Ascher, K. Blaum, M. Heck, S. Naimi Piperade Meeting, 27 th -28 th May 2013, Bordeaux.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
HV-SQUID Compatibility Test Study the SQUID performance in a HV environment. Study the HV breakdown –in superfluid under pressure. –using different materials.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE mars1510 ( DESKTOP ) vs. mars1512 ( PRINCETON CLUSTER ) Nicholas Souchlas, PBL (3/28/2012) 1.
T.Ohtsubo, S. Roccia, M. Madurga and the NICOLE Collaboration University of SurreyUniversity of Novi Sad University of Tennessee NICOLE preparation status.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
Installation of the T600 at Fermilab CSN2, September 22,
Solenoid Status Paul Brindza Dec. 12, Status of work at IUCF Solenoid R&R is based on a MOU between JLAB and IUCF The MOU divides the work into.
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
SANE Magnet Review ● Repaired polarized target magnet was successfully energized and put in persistent mode on 12/18/08 after the review, following the.
Teleconf ACS – FREIA 28th March 2017
Mechanical and cryogenic configurations
Installation of the T600 at Fermilab
ELENA installation and commissioning status
Teleconference ACS – FREIA 18th April 2017
LARP Vertical Test Facility
Action People Time [h] Shutting down the SR 2 1
IMP Cryomodule Assembly and Alignment
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Multiplying by FOIL When having to multiply two binomials together, we need to have a method in place to properly multiply the terms together. This method.
Cryomodule Assembly Plan
Presentation transcript:

SPECTRAP - GSI progress report and status overview

Zoran Anđelković Initial problems => The best option was to disassemble the whole system piece by piece View ports were not in line No vacuum could be established We had no idea how the whole system looked inside The trap had to be changed anyhow

Zoran Anđelković Stage I – dismantling Liquid nitrogen dewar Liquid helium dewar Outer (70K) shield Inner (4K) shield Mounting “can” SC magnet coils trap 4K elec. ions

Zoran Anđelković Removing the outer shield Supported by a small crane Positioning spokes

Zoran Anđelković Removing the LN dewar

Zoran Anđelković Broken bellows on the LN dewar

Zoran Anđelković LN dewar and inner shield overview

Zoran Anđelković Removing the inner shield Some broken electronics parts Broken support disc of the inner shield + other smaller damages

Zoran Anđelković The “old” trap & 4K electronics a hyperbolic trap with two “pre-traps” amplifier and (broken) coil

Zoran Anđelković Removing the LHe dewar

Zoran Anđelković Intermezzo I – the HITRAP platform... and the SPECTRAP setup on it future beam line

Zoran Anđelković Stage II – repaired? No, still vacuum problems ~ 6·10 -2 mbar 

Zoran Anđelković Leak (hole) search pumping test of the dewars found a bad weld on the LN dewar no further (big) leaks detected

Zoran Anđelković Intermezzo II – the “new” trap Trap design modified for purposes of SPECTRAP

Zoran Anđelković Further modifications new electronics development with help of Stahl electronics additional mirror & lens pair

Zoran Anđelković Next steps Put the system (again) back together and check the vacuum Add the electronics and optics to the trap If the vacuum should be OK – cool down (LN + LHe) and energize the SC magnet Think of installing a Faraday cup under the trap Shoot some (any) ions through Make simulations of ions inside the trap Be optimistic!