Value for Europe Improved cost efficiency and effectiveness Value Engineering Árpád Fodor Certified Value Specialist-Life, Professional in Value Management.

Slides:



Advertisements
Similar presentations
DG REGIO – Unit "Thematic Development" EUROPEAN COMMISSION EN 1 Transport and Regional Policy Transport and Regional Policy Patrick.
Advertisements

Bulgaria’s strategic road infrastructure challenges.
VIGO, 28 – LEIXOES, 29 junio de 2007 The role of TEN-T on the new Transport Infrastructure [TEN-T ] Jose Anselmo TEN Transport Project Management.
Presentation of the Project „ Preparation of ceasing of dangerous junctions Zoltán Jákli KÖZOP Head of Completition Department Magyar Közút NZrt.
Sustainable development of inland waterways transport Tamás Marton – Ministry of Transport, Communications and Energy – Hungary
„South East Europe Programme” as a financing opportunity for projects in the Danube region and complementarity to other instruments COMPLEMENTARITY OF.
NEPA ASSUMPTION SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM.
Logistics Processes and Motorways of the Sea II ENPI 2011/ This project is funded by the European Union A project implemented by Еgis International.
COUNTRY STUDY - POLAND POLISH PROGRAMME OF MOTORWAYS CONSTRUCTIONS - BARRIERS OF IMPLEMENTATION Prof. Jan Burnewicz, dr Monika Bak University Of Gdansk.
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
1 EUROCITIES Working Group « Developing a New Mobility Culture » Background information on EU funding streams Mobility Forum meeting Copenhagen, 21 June.
Funding and Justifying Cycling Projects Dr Bernhard Ensink Local Authority Seminar, Dublin Thursday 24 th April 2014.
Trans-European Transport Network and the Connecting Europe Facility
Regional Resource Efficient and Cleaner Production Demonstration Component EaP GREEN Program Malkhaz Adeishvili National Coordinator in Georgia 26 June,
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU BUDGETING EU FUNDS IN LITHUANIA Rimantas Veckys Lithuanian.
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
Report about controlling activity and its results in the programme in 2013 TOP Monitoring Committee Meeting
Hungarian audit experiences related to projects implemented with the co- operation of the private sector Prof. Dr. Gusztáv Báger director general Better.
IMPLEMENTING PRICING POLICIES IN INTERURBAN ROAD TRANSPORT IN NAS COUNTRIES IN THE LIGHT OF PRESENT TRANSPORT POLICY - THE EXAMPLE OF POLAND Monika Bak.
European Economic and Social Committee EUROPEAN INDUSTRY AND MONETARY POLICY The role of the European Investment Bank MAIN PROVISIONAL CONCLUSIONS (To.
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
1 Noise and rail What about Belgium ? Martine Serbruyns Federal Public Service Mobility and Transport Brussels - 28 april 2014.
Greater Manchester Strategy Rebecca Heron and Rod Fawcett GM Integrated Support Team 12 April 2013.
(Dr. Peter Heil, ALTUS – Hungary)
EU Cohesion Policy 2014 – 2020 Measures, tools, methods for supporting cross-border cooperation prepared used for adoption and implementation of joint.
THE CIVITAS INITIATIVE IS CO-FINANCED BY THE EUROPEAN UNION Promoting Sustainable Urban Mobility with CIVITAS.
Cooperation in the mainstream programmes / article 37-6b example of Limousin (France) inhabitants inhabitants 43 inhabitant / km2 43 inhabitant.
Some reflections from the policy point of view - Results of the evaluation on urban development Workshop on Evaluation 25 April 2013, Budapest.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
Value Engineering in Hungary Orlando, June Zsuzsanna Kondor Director General Coordination Managing Authority National Development Agency, HUNGARY.
Evaluation workshop on the Economic Development OP Budapest, 24 April 2013 Jack Engwegen Head of Unit, Hungary DG Regional and Urban Policy European Commission.
LEONARDO DA VINCI PROGRAMME PL/04/B/F/PP – _________________________________________________________________________ European Curricula for Economic.
STEPS FOR FUNDING ELI-NP March 11 st 2011 Dan Cutoiu.
Anni Podimata MEP Member, Committee on Industry, Research and Energy 8th Inter-Parliamentary Meeting on Renewable Energy and Energy Efficiency Budapest,
1 Cohesion Policy Adam Abdulwahab Evaluation network meeting Brussels, 21 September 2009 Ex post evaluation of cohesion policy programmes
LEONARDO DA VINCI PROGRAMME PL/04/B/F/PP – _________________________________________________________________________ European Curricula for Economic.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
Public Private Partnership + EU Funds in Poland general overview and the future outlook.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
29 March 2011 Audit Authority Audit Department Ministry of Finance 1.
By Rasa Snipiene, Director of PCU1 Education Improvement Project, Lithuania Management and Operation.
The National Strategy of Slovak Republic
EN Regional Policy EUROPEAN COMMISSION Third progress report on cohesion 17 May 2005 Towards a new partnership for growth, jobs and cohesion.
Synchronization and development of national strategies of logistics in V4 countries Lajos Veres Ph.D chairman Scientific Association for Spatial Development.
Interreg IIIB Trans-national cooperation: Budget comparison : 440 million EURO 420 m EURO (Interreg IIC prog.) + 20 m EURO (Pilot Actions)
HIV/AIDS A MAJOR DEVELOPMENT CONCERN FOR THE AFRICAN DEVELOPMENT BANK March 2008.
Conference organized by: Union for the Mediterranean High Level Conference on the financing of the future Trans-Mediterranean Transport Network (TMN-T)
1 Second call for proposals – National Information Day EUROPEAN REGIONAL DEVELOPMENT FUND Benoît Dalbert, Project Officer, Joint Technical Secretariat.
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
Beatriz Yordi, Head of Unit on eco-innovation, EACI European Commission 1 February 2008 Financing eco-innovation within the CIP.
Szilárd Árvay Ministry of Foreign Affairs of Hungary.
Consulting & technology financial services | payments | government | transportation | healthcare Managed Inbound Transportation 4 th Annual Government.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
Overview and Scrutiny, Coordinating and Call In Committee Personalisation Presentation 3 March 2009.
ROUND TABLE “Exchanging Experience in Absorption of the European Funds: Perspectives for Bulgaria and Poland” 1 April 2011, Sofia Tomislav Donchev Minister.
Public – Private Partnership in Vietnam: A new approach Ho Chi Minh City – June 2010.
SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING AND RESULTS SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy Regional Workshop.
The New Hungary Development Plan and Life Long Guidance
János Krutzler Hungarian Atomic Energy Authority
POIiŚ „REPAIR WORK/BUILDING WORKS ON THE RAILWAY LINE NUMBER 1 ON THE SECTION CZĘSTOCHOWA ZAWIERCIE”. Bucharest
PRIORITIES in the area of employment and social policy during the Bulgarian Presidency of the Council of the European Union 1 January – 30.
Third progress report on cohesion 17 May 2005
27 November 2014 Mantas Sekmokas
The Social Investment Package (SIP) -20 February 2013
ESF Implementation in Estonia
Ex ante conditionalities in cohesion policy:
European Economic and Social Committee
Cofindustria OVERVIEW OF THE WORLD BANK PROGRAM IN SERBIA
Presentation transcript:

Value for Europe Improved cost efficiency and effectiveness Value Engineering Árpád Fodor Certified Value Specialist-Life, Professional in Value Management High Level Meeting on the Future of Cohesion Policy 31 March – 1 April 2011, Budapest, Hungary

2 Goals of Presentation 1 Highlight the Importance of Value Engineering 2 Regulation of Value Engineering 3 Prevent Unnecessary Expenditures of € Billions / Years

3 Agenda 1 Value Engineering Approach Through Examples and Results 2 Value Engineering in Hungary and Europe 3 Next Steps

4 Agenda 1 Value Engineering Approach Through Examples and Results 2 Value Engineering in Hungary and Europe 3 Next Steps

5 Focus on the function and not on existing solution on existing solution ‘Functional Thinking’

6 We capitalise the functions!

7 Paks Nuclear Power Plant – Water Recuperation power plant

8

9 Paks NPP - Water Recuperation power plant – Original idea €24 million

10 Paks NPP - Value Engineering proposal

11 Paks NPP - Value Engineering proposal (cont)

12 Result of Value Engineering: Cost savings of €3.5 million and the project has commenced Paks NPP - Visualisation – November 2009

13 The visit of Pope John Paul II in Hungary – Gyõr, 1996 Parameters: ,000 believers, 15,000 cars, 3,000 buses, 1 night and a half day Original cost (before VE): €1.6 million

14 What are the functions? Provide area – €0.4 million Parking (bus, car) Provide podium – €0.1 million Illuminate area – €0.3 million …. 12 VE Proposal – Total cost savings: €1.4 million (87%) The visit of Pope John Paul II in Hungary – Gyõr, 1996 Coordinate traffic

15 Dual 2-lane motorway + emergency lane 60 km, €357 million Motorway - Planning permission

16 Motorway - Planning permission K11 Canal Track – Original Idea

17 Parameters of the object  Length: 13.2 metre  Width: metre  Surface: 447 m²  Net unit cost €1,830 / m² Cost estimate: €0.85 million Motorway - Planning permission K11 Canal Track – crossroads object

18 1 m Motorway - Planning permission K11 Canal Track (continued) Is there room for increasing efficiency?

19 What is the function? 1 m  From perspective of the designer: ‘to cross waterway’  Interpretation of VE team: ‘to ensure water supply of the area’ Motorway - Planning permission K11 Canal Track (continued)

20 Motorway - Planning permission VE Proposal – Modification of K11 Canal Track €125,000 Cost saving of €725,000

21 Motorway - Planning permission Dirt Road Flyover

22 60km - 12 dirt road objects Track width of the objects: 7.5m; Track structure size: 8.63m Motorway - Planning permission Dirt Road Flyover

23 Motorway - Planning permission Munich Ring, North (E52) - Dirt Road Flyover

24 Width of dirt road 3.5m Existing asphalt road 4m Width of track structures 4.5m Motorway - Planning permission Munich Ring, North (E52) - Dirt Road Flyover

25 Current (track width 7.5m) Proposal A (track width 6m) Proposal B (track width 5m) €9.2 million€7.6 million€6.6 million Cost Saving:€1.6 million (17%)€2.6 million (28%) Impact of Value Engineering Proposal …only 60-km motorway track! VE proposal: Modify the width of the objects Motorway - Planning permission Dirt Road Flyover

26 Original cost estimate: €357 million Result of Value Engineering Study (20 proposals): Cost savings of €43 million (12%) Motorway - Planning permission

27 Agenda 1 Value Engineering Approach Through Examples and Results 2 Value Engineering in Hungary and Europe 3 Next Steps

28 Public Procurement Act – from 1996 In the invitation to tender, the company or the government body can require the tenderer to apply Value Engineering methodology Value Engineering in Hungary

29 Value Engineering in Hungary

30  Strategies  National Autism Strategy – Preparation of Government Decree  Drafting Laws, Professional documents  Sign Language Interpreter Service  Employment Act  Projects  Public Procurement action plan (National Development Agency)  Balance of Payments – preparation of computer software (Hungarian National Bank)  Process Management System (Paks Nuclear Power Plant) Original version: 155 Processes; VE Proposal: 57 Processes  etc. …and not only for Investment Projects

31 Since 1999 VE review of 85 Motorway Investment plans in Hungary Total Estimated Construction Costs: €2.9 billion Cost Savings: €393 million (13%) Additional Costs: €39 million (1%) … and at higher quality! Results of VE Studies in Motorway Investments, Hungary

32 European Transportation Market in :  Ten-T: €9 billion;  Structural and Cohesion Funds: €43 billion;  The Member States from their own Budget: €196 billion;  European Investment Bank: €65 billion loan. „The available funds of €300 billion will not cover all necessary investments.” Zoltán Kalocsai: Through the common prosperity Roads and Transportation, XX. 1. Issue Februar 2011 European Data

33 10% cost efficiency Return of Investment at least 100:1 Would I spend my money this way?

34 1 More projects from the same budget Investments and projects at higher quality Higher standard of living in Europe Quicker developments and reduced risk of delays Reduction of risk management in decision making Increased efficiency and competitiveness of the European Union How can the European Union gain from the application of Value Engineering?

35 Agenda 1 Value Engineering Approach Through Examples and Results 2 Value Engineering in Hungary and Europe 3 Next Steps

36 Next steps  Analyze development methodologies (i.e. Value Engineering)  Provide training and promote ‘functional thinking’  Develop pilot scheme  Mainstream implementation

37 Thank you for your attention!

38 Contact Details Árpád Fodor Certified Value Specialist-Life, Professional in Value Management Phone / Fax: Mobile: