ROOF MATE Step-By-Step Application Over MODIFIED BITUMEN ROOFING Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF.

Slides:



Advertisements
Similar presentations
Wetsuit Roofing and Waterproofing
Advertisements

FRIGI-TECH REFLECTIVE ROOF COATINGS. MAIN BENIFITS INSULATES – Outperforms 7 of fiberglass insulation. Keeps interiors cooler and more comfortable. CUTS.
Remodel / Resurface. Manufacturers Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.
DAY ONE - STEP ONE - Preparation Pure Crete is added to a water truck with a spray bar located at the rear of the truck at a ratio of one gallon to 2000.
Background Surface Treatments
MarineMend Repair Kit Procedure
Civil Engineering Specifications for the Water Industry
SHOTCRETING K.V.SUBBA RAO.
2313 W Sam Houston Parkway N Suite 105 Houston, Texas ROK Shield Application Instructions ROK Shield is a non-toxic,
Flasking ,Wax elimination Packing and Processing
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Common problems you will find in roofing systems Common problems you will find in roofing systems.
Building Code – Flashing Changes & Challenges Builder Breakfast and Luncheon Series Presented by:
Curing and Protection of Concrete
Building Owners Roofing System Inspection and Maintenance.
Blacklidge Emulsions Inc. GuardTop Sealer. Guardtop Mission Statement The goal of Guardtop is to produce an asphalt seal coating that has deeper and longer-lasting.
Fibered Asphalt Emulsion- 10-Year Warranty System.
Ergonomics for School Custodians Many injuries can be prevented by following a safe work procedure. Safe work procedures are developed by spotting hazards,
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
Concrete Specifications
Unit 3 Clothing Care and Laundry
Firestone Building Products EPDM Training. Membrane Attachment.
ROOF MATE Step-By-Step Application Over BOARD-STOCK INSULATION
 Complete failure of the roof membrane, as stated by GAF consultant from Trinity ERD  Elastomeric roof material did not completely adhere.
A member of Sayegh Group
MAINTENANCE PART 2. Inlet free of obstructions Inlet free of obstructions Adequate scour protection provided.
EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.
Remodel / Resurface. Manufacturer’s Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.
2313 W Sam Houston Parkway NSuite 105Houston, TX77043 (T): (F): ROK Flex C Application Instructions.
Tie-Off Points and Anchors Presented by Scott Pipicelli – HC&A.
AUZIE QUIC SLIP PTY LTD AQS METAL PRO – 001 INTERIOR AND EXTERIOR.
SPECIFICATIONS FOR ROOFING ROOF DRAINAGE Adequate drainage fall should be specified at no less than the industry minimum requirement or at least 1.5% without.
Wall Coverings  Selected according to: ○ Function ○ Size ○ Existing furnishings ○ Budget ○ Maintenance.
CONSTRUCTING A FIVE CABIN LATRINE
ROOF MATE Step-By-Step Application Over METAL ROOFING Master Guide Specifications List of Materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER.
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
ROOF MATE Step-By-Step Application Over EPDM ROOFING Master Guide Specifications List of Materials: ROOF MATE WHITE ROOF MATE LIGHT GRAY ROOF MATE BUTTER.
Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER GRADE ROOF MATE MESH Optional materials: UCC (United.
Products & Accessories Details System Highlights Hands On
ROOF MATE Step-By-Step Application Over CONCRETE ROOFING
BondChem TECHNICAL DATA Roll-a-crete ( Three Component Cementitious Waterproof Coating ) Page 1 / 2. DESCRIPTION BondChem’s Roll-a-crete is a three component.
Maintenance of Machine tools
MOUNTING PHOTOS FOR STATE FAIR This is a guide for mounting your photos for entry in the Kansas State Fair. By the Photography Project Action Team (Bob.
PAVEMENT MAINTENANCE 1 Part 3: Potholes and Cracks Idaho Roads Scholar Program.
LiquiGard ™ Firestone Building Products. LiquiGard ™ About Firestone LiquiGard™ is a tough, liquid applied, two-part polyurethane adhesive. It forms a.
Unit A3-13 Preparing Surfaces and Selecting Paints/Preservatives.
Firestone Building Products
Surface Treatments #2.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
© Copyright 2012 Milady, a part of Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible.
ACOUSTIC SHEETING SARLON TRAFIC TOPOGRAPHY. INTRODUCTION  Acoustic floors are best way to reduce noise in buildings  The thickness of the concrete slab.
Create decorative backsplashes, accent walls, or other focal points
Garland’s White-Knight® Plus/ White-Stallion® Plus System
Elastomeric Wall Coating: Garland’s Tuff-Coat™ Systems
Linoleum Installation System
Liquid Flashing: Garland’s Tuff-Flash™ System
CPR™ System.
Fiberglass-Reinforced Sheet Flooring Installation System
Revitalizer™ Systems.
B-Clean™ Heavy-Duty Concrete & Masonry Cleaner
DAMP-PROOFING AND WATER-PROOFING COURSE
Fiberglass-Reinforced Sheet Flooring Installation System
Tapiflex Self-adhesive
Wrapping Anodes Back To Basics
II REVIEW.
How to install pavers..
Best Paint Options for a Concrete Around Pool By: Authentic Plastic and Tile
Application Issues & Solutions
Presentation transcript:

ROOF MATE Step-By-Step Application Over MODIFIED BITUMEN ROOFING Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER GRADE ROOF MATE MESH Optional materials: UCC (United Cleaning Concentrate) ROOF MATE FABRIC UNIBASE RHINO TOP ACRYSHEEN EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over MODIFIED BITUMEN ROOFING STEP 1 – Preparation Remove all loose granules, dirt and debris, taking care to preserve the integrity of the existing asphalt membrane. Any unsound areas in the roof deck, insulation or flashing must be repaired or replaced. All blisters, delaminations, wrinkles and loose areas must be cut away to sound substrate, or cut open and nailed flat to the deck. Ensure that the roof deck has positive slope to drain and that the moisture content of the existing substrate, insulation and deck does not exceed 15%. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over MODIFIED BITUMEN ROOFING STEP 2 – Cleaning & Priming Roof surfaces must be clean, dry, structurally sound, stable, well secured, and free of excessive ponding water. Sweep roof thoroughly using a stiff broom. Wash all surfaces using United Cleaning Concentrate (UCC) or comparable biodegradable cleaner to remove any remaining dirt and other contamination. Heavy deposits of dirt or contamination may require additional agitation with a stiff-bristle broom or similar mechanical scrubber. If the roof has been coated with aluminized asphalt, contact UNITED COATINGS for additional preparation instructions. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over MODIFIED BITUMEN ROOFING STEP 3 – Repair Reinforce repaired areas by encapsulating an appropriate-size piece of ROOF MATE Mesh or ROOF MATE Fabric into ROOF MATE Basecoat, so that it totally covers the repaired area. Repaired areas can also be reinforced by applying a heavy coat of ROOF MATE Butter Grade, using a brush or roller. Apply ROOF MATE Butter Grade in two heavy coats, using a brush or roller, to achieve a total thickness of 60 to 80 mils (1,524 to 2,032 microns), extending the Butter Grade a minimum of 1” (2.3 cm) on all sides of the detail. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over MODIFIED BITUMEN ROOFING STEP 4 – Details All cracks and splits shall be treated with a strip-coat of ROOF MATE Butter Grade, centered over the crack and extending 1” (2.5 cm) to either side. Voids or holes larger than 1/8" (3 mm) in width shall be filled and leveled with ROOF MATE Butter Grade. Reinforce all split seams, roof termination points, vertical/horizontal interfaces, drains, scuppers, openings, protrusions, and around roof mounted equipment, using either ROOF MATE Butter Grade, or with ROOF MATE Mesh embedded into ROOF MATE Basecoat or Butter Grade. If using ROOF MATE Butter Grade, apply two heavy coats with a brush or roller to achieve a total thickness of 60 to 80 mils (1,524 to 2,032 microns). If using ROOF MATE Mesh, apply ROOF MATE Basecoat or Butter Grade liberally around the area to be reinforced. While the material is still wet, embed a strip of ROOF MATE Mesh, centered over the detail, applying additional material to totally encapsulate the reinforcement fabric. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over MODIFIED BITUMEN ROOFING STEP 5 – Full Fabric Reinforcement Reinforce roofs exhibiting a high degree of surface degradation, split seams, etc., by embedding 40” (102 cm) wide rolls of ROOF MATE Fabric into ROOF MATE Basecoat or Unibase over the entire surface. Sandwich the fabric between two coats of ROOF MATE Basecoat, each applied at the rate of 1 to 1½ gallons per 100 sq. ft. (.4 to.6 l/m²). If using Unibase, roll out a 4’ to 10’ (1.2 to 2.5 m) length of fabric and either spray apply or pour Unibase evenly over the top side at the rate of approximately 2 gallons per 100 sq. ft. (.8 l/m²). Work the coating evenly throughout the fabric using a broom or roller so that it is totally encapsulated, eliminating any air pockets, wrinkles or gaps, and allowing the fabric to conform to the surface contours. Overlap consecutive passes of ROOF MATE Fabric a minimum of 2” (5 cm) on each side, taking extra care to ensure that all edges are thoroughly saturated, tight and secure. Note: This system is designed for application to aged modified roofs only. For new modified bitumen roofs, contact UNITED COATINGS’ Technical Service Department for specific recommendations. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over MODIFIED BITUMEN ROOFING STEP 6 – Coating Application Apply 1 to 4 separate coats of ROOF MATE, using airless spray or roller, at the total rate of 1.6 to 6.2 gallons per 100 sq. ft. (.65 to 2.5 l/m²), depending on full fabric application, desired warranty and/or specification requirements. Create a self-terminating flashing by extending the topcoat a minimum of 3” (7.5 cm) above all protrusions, parapet walls, etc. <BACK EXITMAIN MENUNEXT>EXIT

ROOF MATE Step-By-Step Over MODIFIED BITUMEN ROOFING *Rhino Top is a tough acrylic coating that is available in both smooth and textured formulations. It is ideally suited for horizontal surfaces that receive regular foot traffic. STEP 7 – Options Apply walk pads, ceramic roofing granules or Rhino Top as required to demarcate walkways and service areas, and/or provide non-skid characteristics. To enhance dirt release characteristics in problem areas, apply a coat of Acrysheen, which imparts a slick, semi-gloss finish that aids in maintaining a clean surface. <BACK EXITMAIN MENUNEXT>EXIT

Thank you for choosing quality ROOF MATE products from UNITED COATINGS <BACK EXITMAIN MENUEXIT